Loading…
Loading…
10,896 results • Best match
(SH- C/O R/wall at RD 0/220 to 0/240 Kharanja soling at RD 0/0 to 0/450)
SH- Formation cutting 5/7 Mtr. Wide road km. 0/00 to 6/150, C.D. work, Kharanja stone soling, PCC parapets, Katacha road side drain, Km. stone and dumping site) Under NABARD RIDF-XXVI
C/O wire crate R/Wall at Rd 0/035 to0/049.40 0/245 to 0/257 0/280 to 0/292 and C/O B/Wall in RR Masonry a/w PCC Toe wall at Rd 0/220 to 0/235
Formation cutting between Rd 0/0 to 1/580, i/c damping places
(SH- Construction of 3.000mtr RCC slab culvert with both side wing wall at RD 0/985)
ROFD for 5/7 mtr.wide road,R/wall , C.D., Soling, wearing andTarring, Drain and Parapets in between km. 0/0 to 2/060 Under NABARD RIDF-XXV
PL 30mm thick BC and 025mm thick road marking thermoplastic strip and Vshape drain
SH C/O Edge wall at RD 1/680 to 1/780 and Providing and laying GSB WMM and SDBC in Km 1/500 to 2/0
Providing and laying built up spray grout layer for pot holes, 30mm thick bituminous concrete in km 1/00 to 2/00
P/L 30mm thick Bituminious Concrete including profile correction in Km 0/000 to 1/000
P/L GSB, M/T in km 0/0 to 0/270 and 0/300 to 0/500 (under OTMNP Head)
SH F/C 5/7 mtr wide road at RD km 0/645 to 0/720
SH- Providing and Laying G-I, C/O R/wall in km. 0/435 to 0/460, 0/480 to 0/500 and 0/575 to 0/600 and Hume pipe Culvert at Various Rds.
Providing and laying Cement Concrete Pavement at RD 1/570 to 1/774.50)Targeted
Formation cutting in Km 0/0 to 1/600 and C/o wire crate for dumping sites).
P/L 25mm thick bitumen concrete.
C/o R/wall at various RDs and C/o 900mm dia HPC at RD 2/420
Providing and laying GSB and Wearing at RD 6/530 to 7/700). MMGSY.
(SH- F/C 5/7 mtr wide road at RD 0/0 to 1/510)
Providing and Laying GSB from 1/175 to 1/425, G-II from 1/225 to 1/425 and CC Pavement 1/425 to 1/475 and Tarring from RD 1/475 to 1/660 and 1/310 to 1/425
SH C/o Crated R/wall at Rd. 0/230 to 0/290
SH Construction of R/wall at various R.D 0/000 to 0/012 and 0/505 to 0/512, HPC at Rd 0/285, 0/480, 0/530 and P/L Kharanja stone soling at various slushy reaches between km 0/00 to 0/570
SH Formation Cutting 5/7 mtr wide between RD 0/225 to 0/435 and C/O B/Wall at Rd 0/005 to 0/030
C/o 6.00 mtr. span culvert at Rd 0/930 alongwith wing wall
C/o Hume Pipe culvert 900mm dia along with wing wall at RD 0/000) (Under OTMNP Head)
(SH- Providing and fixing cat eyes and thermoplastic strips in km. 0/0 to 1/300)(Under Industrial Deposit).
SH FC Rwall in PCC R.R masonry in wire crate parapets unlined drain essential soling RCC hume pipe culvert crash barrier road furniture solid causeway and dumping site etc at km 0.0 to 3.0 slice I.
Providing and laying Cement concrete at RD 0/090 to 0/240)Deposit work
Providing and laying cement concrete at R.D. 0/705 to 1/155 Deposit work.
C/o, PCC, R/Wall at R.D. in K.M. 4/255 to 4/265 and 4/590 to 4/605
SH Providing and laying WMM Semi Dense Bitumen Concrete SDBC in km 0/500 to 0/800 and interlocking paver block at RD 0/800 to 1/100
F/C 5/7 mtrs wide road in Km 0/000 to 0/225 and C/o PCC R/wall at Rd 0/000 to 0/015
SH C/O retaining wall at RD 1/130 to 1/140 and 475 mtr Kharanja soling in various slushy reaches
(SH-C/O 15 mtr span RCC Slav Bridge at RD 0/900)
SH P/L Interlocking Concrete Block from Rd 1/380 to 1/455
C/O R/Wall and C.D. works alongwith Wing Wall at various RD
Providing and laying 30 mm bituminous concrete and protection work in K.M. 0/00 to 0/260
C/o PCC R/wall at Rd 1/175 to 1/190 and P/L Kharanja Stone Soling at Rd 1/900 to 2/100 and 3/180 to 3/480
SH-C-o 900 mm dia HP Culvert alongwith wing wall at Rd 0-995 0-330 and B-wall at Rd 0-510 to 0-525 0-570 to 0-577 and 0-758 to 0-768)
construction of Hume pipe culvert with wing wall at RD 4/030) Under OTMNP
Providing and laying 25 mm thick Bituminous Concrete in between km. 0/00 to 1/000)
SH F/C 5/7 mtr wide at RD 0/270 to 0/900
P and L 30mm thick B.C. and 2.5mm thick and road marking thermoplastic strip in km. 5/270 to 6/00 and 8/00 to 8/710). (HP0302VR0006)
M/T in Km 0/0 to 1/0
Formation cutting Passing places, Retaining walls Cross drainage works, GSB,WBM G-II WBM G-III Tarring work, Interlocking Paver Block Cement concrete pavement, Road side drain and Parapets, P/F Road Furniture including five years routine maintenance
SH P/L M/T in K.M. 0/00 to 1/930
Metalling and Tarring in Km 0/000 to 1/000
PROVIDING AND LAYING G.S.B., W.M.M. AND TARRING IN KM. 1/500 TO 1/600 AND 1/665 TO 1/865 AND P/L CEMENT CONCRETE PAVEMENT AT RD. 1/600 TO 1/665)
C/O Kharanja stone soling at RD 0/0 to 0/570
SH Construction of B/wall at RD - 0/060 to 0/075, 0/830 to 0/845, R/wall at RD 0/135 to 0/143, 0/210 to 0/219,0/235 to 0/255, 0/863 to 0/868 and 1/650 to 1/680)