Loading…
Loading…
10,896 results • Best match
Construction of 3.00 mtr. Span culvert at RD 1/100) (Under SCSP)
SH- C/o 6.00 mtr span CD Super structure work at Rd 2/090
P/L Kharanja Stone Soling at RD 0/000 to 0/630 and C/O 900 mm dia hume pipe culvert at Rd 0/050 and 0/200
Cutting, R/B walls, HPC 900mm dia and Grading-I
SH. Formation cutting 5/7 mtrs wide road km 0/0 to 1/360. under MNP
F/C, Hume Pipe culvert ,R/walls,M/T works and PCC drain in km 0/0 to 0/600.SCSP
SH- C/o 900 mm dia HP culvert at various RDs
C/O Breast wall at RD 0/0 to 0/030
P/L 30mm thick bituminous concrete in kms 0/0 to 0/500 I/c paver block, G-III in Pot Holes
5/7 mtr formation cutting RD 1/505 to 2/865)
SH- Formation cutting and wire crate for dumping sites
(SH- F/C 5/7mtr wide road cutting at RD 1/165 to 1/270)
P/L G-III, C/O C.C pavement on RD 0/00 to 0/380. (under MMGSY).
Construction of Formation cutting in widening 0/00 to 0/210, Protection work 0/003 to 0/033 and Dumping site between km. 0/00 to 0/210) Under BASP Head (Deposit work)
P/L 30mm thick bituminous concrete in kms 0/0 to 0/750 I/c paver block G-III in pot holes.
P/L C.C.Pavement at RD 1/950 to 2/500). (OTMNP)
F/C in KM 0/0 to 6/0 including dumping places
Formation Cutting 5/7 mtr wide road in Km 0/000 to 0/405
SH Construction of 5/7 metre wide road formation cutting/ROFD CD Soling GSB and Metalling/Tarring in km 0/0 to 0/750
P/L cement concrete pavement V-Shape dtrain in Km 1/390 to 1/425 , 1/610 to 1/650 2/300 to 2/370)
SH P/L WMM and Metalling tarring in km 0/0 to 0/350
C/o 6.00 meter Span Slab Culvert at RD 0/045
(SH-widening of narrow reaches at RD 0/135 to 0/975)
C/o, R/Wall at R.D. 1/585 to 1/595
SH C O 4 00 mtr RCC Slab culvert at Rd 3 740 Under SCSP
C/O R/wall at Rd 0/340 to 0/360 0/710 to 0/735 , P/L soling, WMM, Cement Concrete Pavement V-Shape drain in Km 0/800 to 1/00
SH P L 900 mm dia HPC and ROFD in K M 0 0 to 0 500
Providing and Laying, GSB, WBM, G-II in K.M. 0/00 to 0/700
SH Laying of cement concrete pavement on 2nd Leg of road RD 0/0 to 0/060
SH C/O Retaining wall at Rd 0/0 to 0/028 and Breast wall at RD 0/05 to 0/025
Dismantling and Construction of 3.00mtr Span RCC Slab culvert with approach wall at Rd 0/750).( under SCSP-Targetted )
C/O C.C. Rigid pavement at RD. 1/390 to 1/490).(Under OTMNP).
SH Providing and laying Wearing Coat Grading-II 63-45 mm size in Km 0/900 to 2/500
SH Providing and laying Wearing Coat Grading-II 63-45 mm size in Km. 2/500 to 4/00
SH C/O R/WALL AT RD 0/035 TO 0/055 AND B/WALL AT RD 0/030 TO 0/055 AND FORMATION CUTTING
SH F/C 5/7 mtr wide road at RD 2/00 to 2/705
C/O R/wall at Rd 0/00 to 0/025) (Under MMGSY)
Formation cutting at R.D. 0/0 to 1/800 and wire crate for dumping site
P/L GSB, WMM, Premix Carpet, Seal Coat C.C Pavement in km 0/550 to 1/0 HPC at Rd 0/580) (under SCSP Head)
Balance work of 3.00 mtr span culvert at RD 0/450 and C/o both side approaches
P/L cement concrete pavement at Rd 0/675 to 0/920
F/C 5/7 mtr wide in Km 0/345 to 0/600
(SH- F/C of road from RD 0/0 to 0/390)
Formation Cutting 5/7 mtrs wide road in Km 0/000 to 0/465
SH F/C 5/7 Mtr. Wide road km 0/900 to 1/050 Deposit
Construction of 900mm dia hume pipe culverts alongwith PCC wing walls and created breast walls at various RDs) under BASP
SH Providing and laying metalling tarring in km 0/0 to 1/400
P/L 30mm thick Bituminious Concrete including profile correction in Km 2/000 to 3/390
SH-M/T work and G-I,II in KM 0/00 to 1/00.