Loading…
Loading…
10,896 results • Best match
Restoration of rain damages on link road Dangar to Badhaghat via Chokhna road km 0/00 to 13/200 SH C/O R/wall at RD 12/00 to 12/015, 12/565 to 12/570 and Construction of C.C. pavement at damaged reaches Rd 12/075 to 12/136.50 Under PDNA Year 2023
Balance work of link road Mandwara to Karol via Chanouria Basti, Baba Balotu Mandir, Suker and Dadari Km. 0/0 to 5/150 (SH Removal of Formation Deficiency, in Km 4/019 to 4/120, 4/489 to 4/828, c/o Retaining wall at Rd. 4/030 to 4/046, 4/043.60 to
SH PL 30mm thick Bituminous concrete Wet Mix Macadam WMM Priming coat and Tack coat and Providing and applying thermoplastic layer
SH PL 30mm thick Bituminous concrete Wet Mix Macadam WMM Priming coat and Tack coat and Providing and applying thermoplastic layer
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 1/0, 2/0 to 3/0
Providing and laying Tack coat, Bituminous Concrete and C/o V-shape drain in between Km 5/0 to 6/0
Providing and laying Tack coat, Bituminous Concrete, Thermoplastic Paint and C/o V-shape drain in between Km 0/0 to 1/400
Providing and laying Tack coat, Bituminous Concrete and C/o V-shape drain in between Km 0/0 to 1/0
Providing and laying Tack coat and Bituminous Concrete in Km. 4/0 to 6/0.
Providing and laying Tack coat and Bituminous Concrete in Km. 0/0 to 1/500.
Providing and laying tack coat and 25mm thick bituminous concrete in km. 2/0 to 3/500
C/O R/Wall, road side railing and Cobble Stone Flooring etc
SH C/O R/Wall at RD 3/480 to 3/498,3/360 to 3/388, 3/775 to 3/795 and C/O R/Wall in wire crate at RD 0/140 to 0/150
Providing and Laying Bituminous concrete in Km.4/00 to 6/00. Under PMGSY Incentive.
Construction of bridge) under PMGSY (Batch-II for 2018-2019 Package No. HP-02-370
Construction of bridge) under PMGSY (Batch-II for 2018-2019 Package No. HP-02-370
Up-gradation of Holta to Tanda Holta road km 0/0to5/500 (Pkg No HP-04-420 ) under PMGSY-III (Batch-I, 2022-23) in Distt Kangra HP (SH- Imp, P/places, Missing CD, S/Drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etc i/c 5 year RM)
Annual Maintenance Plan for PMGSY roads for the year 2024 25 on TMBD road to Proiana Kalan km 2000 to 3000 and 7000 to 9000 TMBD road to Dobar km 1000 to 3000 Lathiani Kohdra Road km 8000 to 8420 and Hatli Talpi Road km 0000 to 1000 SH Providing and
Annual Maintenance Plan-1 for the year 2024-25 On Nahan Dadahu Haripurdhar road Km. 36/00 to 87/00 MDR-l (Non PMGSY)(SH Repair of pot holes and Mix Seal surfacing of 25mm thick (Type-A) from Km. 56/00 to 59/00 and 74/00 to 78/00).
Providing and laying 30mm single layer bituminous concrete (HP0404VR009515305) in km. 4/0 to 5/0
Providing and laying 30mm single layer bituminous concrete (HP0404VR010715306) km. 3/770 to 5/00
Providing and laying 30mm single layer bituminous concrete (HP0404VR006615207) km. 5/0 to 6/0
(SH Providing and Laying 30 mm thick Bituminous Concrete PCC drain and Hot Thermoplast line in km. 2/0 to 2/500) 0 500 km)
Providing and laying 30mm single layer bituminous concrete (HP0404VR009515307) in km. 6/0 to 7/0
Providing and laying 30mm single layer bituminous concrete (HP0404VR009515306) in km. 5/0 to 6/0
Providing and laying 30mm single layer bituminous concrete (HP0404VR012615301) in km. 0/0 to 1/0
(SH Providing and Laying 30 mm thick Bituminous Concrete PCC drain and Hot Thermoplast line in km. 0/0 to 1/500) 1.500 km).
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 1/000
Providing and laying 30mm thick bituminous concrete in Km. 6/0 to 7/0
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher in km 1/000 to 2/000
Providing and Laying 25 mm thick Mix seal surfacing with Paver Finisher in km 0/000 to 1/00 and 1/00 to 2/00
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 0/850
Providing and laying 30mm single layer bituminous concrete (HP0404VR009515304) in km. 3/0 to 4/0
Construction of road from Chadha Niwas to HIMUDA colony Strawberry Hills in ward No 28 Chotta Shimla near Khachi Niwas (SH Construction of Retaining wall and M S Railing etc) under M C Head
Construction of road Bathani Gali to Manshani Dhar road KM. 0/00 to 3/00(SH F/C 5/7 mtr wide road in KM. 0/555 to 0/855) Deposit VKV/2024/643
CONSTRUCTION OF rOAD FROM IPH DIVISION TO SURINDER CHURIA HOUSE AT DEHRA TEHSIL DEHRA DISTT KANGRA SUB HEAD PROVIDING LAYING CEMENT CONCRETE PAVEMENT AND 900MM DIA HUME PIPE WITH TOE WALL AND APPROACHES NDRF
Dewatering and scientific deflection monitoring inside tunnel and other allied works at work sites of construction of road tunnel in left over work of Four Laning of KiratpurNerChowk Section of NH-21 Himachal Pradesh
Construction of Balance Road Work of Road at Sheelagarh area under the Scope of Lot PB-2B package (Lot PB2D-5) of Parbati HE Project (Stage-II) (Package No. C-550)
SH ROFD in km 0/480 to 0/645 0/750 to 0/825 and construction of retaining walls at various RDs
SH ROFD , P/L WBM Grade-I in Km. 1/0 to 2/0 , WBM Grade- II in Km. 0/0 to 1/0, P/L 600 mm dia RCC hume pipe culvert at RD 1/260 and 1/395, B/walls and unlined drain s in Km. 0/0 to 2/0 ( Under SCSP)
Providing and laying G-II from 0/00 to 0/300, 20 mm M.S.S in K.M. 0/00 to 0/300
SH- Providing and Laying 30mm thick Bituminous Concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/00 to 1/040) under AMP for FY. 2023-24
P/L GSB, CC Pavement V-shape Drain at km 0/00 to 0/375
C/O Breast wall at RD 0/030 to 0/060
SH Formation Cutting in km 0/0 to 0/856 and Crate work at Dumping site
Providing and laying WBM Gr.I,II and Metalling Tarring in between km. 0/00 to 1/00 and construction of Retaining walls at RDs 1/825 to 1/840) Under DMFT Deposit.
Sh- Providing renewal coat by 30 mm thick bituminous concrte in between km. 3/00 to 6/500 for AMP 2022-23
SH P L Kharanja stone soling at Rd., 0.0 to0.450
Construction of formation cutting at R.D. 0/00 to 1/510) Under Chief Minister Announcement work.
Preparation of forest case constructed in violation of FCA-1980 Complete including