Loading…
Loading…
10,896 results • Best match
Balance F/C in km 0/000 to 0/600 c/o PCC R/wall and 900mm dia Hume Pipe Culverts
SH- P/A Tack Coat, Carpet and Seal coat Km.2/0 to 2/890
P/L Interlocking Paver Block flooring in Km 0/400 to 0/600 and Edge wall in Km 0/500 to 0/600) Under Head MMGSY
F/C 4/5 Mtrs wide road 0/500 to 2/060
C/o, R/Wall at R.D. in K.M. 0/615 to 0/640
C/O CC pavement from 1/100 to 1/130 solid causeway at RD 1/250 to 1/258.50, V shape, U/shape drain at various reaches and crate work
Providing and laying GSB and G-III at RD 1/00 to 1/400)(MNP)
C/o Breast wall in PCC from km 1/840 to 1/880 and improvement of curve form km 1/240 to 1/310)
C/o Proposed B/wall, Protection wall at RD 4/440 to 4/464) DMFT
Widening of troad jeepable to motorable from Km.0/0 to 0/285
P/L laying 900mm dia Hume pipe culvert and retaining walls
SH-C/o Formation cutting and wire crate for dumping sites
P/L M/T in km. 1/150 to 1/750 Under SCSP Head
SH Const of Solid Causeway at RD 0085 to 0095 1585 to 1595 and 1650 to 1660 and Providing and Laying GSB WMM and Tarring Between km 0058 to 0085 and 0095 to 0205 Under MNP
(SH- C/O R/wall at RD 0/725 to 0/7735 C/O B/wall at RD 1/100 to 1/115)
C/O 900mm dia Hume Pipe Culvert at Rd 0/600 and 0/915 P/L Kharanja Stone Soling in Km 0/500 to 1/165
SH F/C 5/7 mtr wide at RD 0/120 to 0/225
Formation cutting 5/7 mtr wide road in km. 0/00 to 1/180 and Wire crate for dumping site at various Rds)( Under working programme).
C/O 600 mm dia RCC hume pipe culvert at Rd 1/040 and C/o Retaining at rd 0/660 to678, 0/810 to 824,0/840 to 853, 0/970 to 982 and 0/985 to 0/998
(SH- C/o B/Wall at RD 1/717 to 1/761)
SH Providing and laying G.III, MSS for Km. 0.000 to 0.720
Under SCSP SH C O 900 mm RCC Hume pipe culvert with wing wall at Rd 2 220 2 340 2 540 2 670 and 4 00 mtr RCC slab culvert at Rd 2 720
C/o Double Row RCC hume pipe culvert 900mm dia at Rd. 3/025 and 3/045
C/O RCC Hume pipe culvert at Km. 0/060 AND 0/150) (Under PDNA 2023
Providing and Laying wearing G-II and Cement Concrete Pavement at km. 0/090 to 0/200).
C/O R/wall at RD 0/025 to 0/045
P/L interlocking paver block 80mm thick at RD 0/0 to 0/075 (Deposit Works).
SH P L WBM Grade III 53 to 22 4 mm k M 2 0 to 2 700 and C O unlined surface drain in k m 2 0 to 2 700 and c O unlined surface Drain in k M 2 0 to 2 700 Under SCSP
SH P/L GSB G II and Tarring Works in km 0/340 to 0/480 Under Deposit
Formation Cutting 5/7 Mtr. Wide road Km. 0/150 to 0/415
Preparation of forest case constructed in violation of FCA-1980 Complete including
Providing and fixing crash Barriers at RD. 0/00 to 0/055).
SH C/O R/Wall at RD 0/190 to 0/20, P/L W metal Crash barrier between RD 0/00 to 0/060 and Khuranja Stone Soling at Various RDs between km 0/00 to 0/500)
P/L Cement concrete pavement at Rd. 0/0 to 0/393Under MMGSY
P/L GSB, WMM and 2.5cm thick premix carpet with seal coat in km. 0/0 to 0/600
P/L 30mm thick bituminous concrete in kms 0/0 to 0/800 I/c paver block, G-III in pot holes
SH Providing and laying BC in km 0/419 to 0/621 C/o V Shape drain on various RDs C/o Edge wall at various RDs including shoulder
C/O 900mm dia Hume Pipe Culvert at Rd 0/390 and 0/460
P/L Kharanja Stone soling and C.C. Pavement and RCC Slab
Construction of 3.00 mtr. Span RCC Slab Culvert at RD 0/400
C/O formation cutting 5/7mtr. Wide, cross drainage works, WBM G-I, G-II, G-III, 2cm. Thick premix carpet, road side V-shape drain and parapets in km. 0/0 to 1/735.)Under NABARD RIDF-XXVI
SH P/L 900 mm dia at HPC at RD 0/495
RCC Hume pipe culvert at Rd 1/150,1/420 , P/L M/T in Km 0/610 to 1/800 etc.
Providing and Laying, M/T at RD 0/0 to 0/230 and C/O R/wall at RD 0/120 to 0/185) (Deposit)
(SH F C wide road at RD 2.525 to 3.0 )
Providing and laying Metalling Tarring, Construction of drain at R.D. 0/0 to 0/400 and Retaining wall at R.D.0/350 to 0/400) UNDER SCSP
C/o, PCC, R/Wall at R.D. in K.M. 1/090 to 1/120
2.75/5.00 mtr. Wide formation cutting in km. 0/0 to 4/900