Loading…
Loading…
10,895 results • Best match
(SH-Formation Cutting 5/7 mtrs wide road from Km 0/0 to 1/090 and C/o B/wall in PCC 1.4.8 at 0/200 to 0/250)Under MMGSY
(SH -Formation Cutting 5/7 mtrs wide road from Km 0/0 to 4/00 )Under MMGSY
Providing and laying 25mm thick Bituminous concrete along with providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00) Addl. Kms under AMP 2025-26 village road.
ROFD, B/wall in wire crate, CC Pushta and CC causeway at Rd 0/175
Construction of P.C.C. Retaining wall at RD. 0/360 to 0/375 and 0/670 to 0/685
(SH- Construction of B/Wall in PCC 1 4 8 at RD 0/015 to 0/048)Under MMGSY
Construction of Bharari to Padhai Mata Road. km 0/00 to 1/800.2. Construction of Link road from Chairi Bifurication to Anu Km 0/000 to 0/830.3. Construction of Link Road Patgair to Dhar Dutt Road. Km 0/00 TO 1/500
ROAD WORK PREMIXED CARPET
Providing and laying 25mm thick Mix seal surfacing with Paver Finisher on Bilaspur to Gill Basti Harizan Basti Road in Km 0/000 to 1/200
Providing and laying 25mm thick Bitumen concrete i/c profile correction laying with paver finisher in Km 2/0 to 3/0
Providing and laying 25mm thick Mix seal surfacing with Paver Finisher on Kalri to village Basdi road in Km 0/000 to 1/000, Saletar to village Doli road in Km 0/000 to 1/000).
Providing and laying 25mm thick Bitumen concrete i/c profile correction laying with paver finisher in Km 1/0 to 2/0
P/L 25mm Thick Mix Seal Surfacing, Thermoplastic Road Marking and Maintenance of Side Drain on Banog Kheri road(Palion Andheri Trilokpur) Left out Portionkm 2/00 to 4/00, Salani Devni P road km 2/00 to 4/750 and Palion Gumti road km 0/750 to 2/8
Special repair to Helipad at Ghumarwin district Bilaspur H.P (SH C/o boundary wall, gat, approach road to Helipad and hume pipe culvert 600mm dia and R/wall
/O Volleyball pitch, Basketwall ground, C/O R/Wall for flood protection work and approach road with 3 mtr. Span RCC culvert at RD 0/100) Sports Deposit
Providing and laying 30mm thick bitumen concrete
1) Imp. of def., C/O 900 mm dia hume pipe culverts a/w wing walls, R/walls and metalling and tarring in km 0/0 to 1/420 (2) Providing and laying M/T from K.M. 0/0 to 1/845 (3) Imp. of def., CD works P/L Base course and tarring work in km 0/0 to 0/960
Providing and laying Tack coat, Bituminous Concrete in Km 1/0 to 2/500
Providing and laying Tack coat, Bituminous Concrete, Thermoplastic Paint and C/o V-shape drain in between Km 0/0 to 1/0
Providing and laying Tack coat and Mix seal surfacing in Km. 0/00 to 2/400
Providing and laying Tack coat, Bituminous Concrete and C/o V-shape drain in between Km 3/0 to 4/0
Providing and laying Tack coat, Bituminous Concrete and C/o V-shape drain in between Km 0/0 to 1/0
Custom Bid for Services - for hiring of JCB Tipper Manpower for loading shifting unloadingback filling leveling earth and debris etc for road repair and maintenance from Hill Top to Nadi and Quarry and drain cleaning along these road water supply ma..
A/R AND M/O on Solan Meenus road Km 24/345 to 61/0 AND Link road Katoli Kawga Knech up to Sandarh Km 0/0 to 1/800 (SH Providing and laying patch work i/c WBM G-III for rectifying corrugated surface on Solan Meenus road in Km. 33/0 to 40/0 AND 44/0
Job 7 Construction of Link road from Lalpuri Vishnu Dham Kutia upto CHC Beetan in G.P. Beetan Sub Head Providing and laying GSB , WMM SS-1 RS-1 and 30mm thick BC at Km 0-0 to 0-270 and C-O Edge wall RD 0-0 to 0-080 BHS and C.O V-shape drain at RD 0-
C/o link road from Gurukund Talli road to Lodiwala km 0/0 to 1/180 (Under SCSP) (SH- F/C in km 0/0 to 1/180, C/o C/o 900mm dia RCC Hume pipe culvers at R 0/495, 0/880, 1/060, 600mm dia HPC at RD 0/090 and 0/295).
M/T on link road from Badgaon to Ree Radoh Km. 0/0 to 4/00 (SH P/L G-I and G-II at RD 1/105 to 1/185, G-III and Premix Carpet at RD 1/105 to 1/570, 1/685 to 1/780, 1/825 to 1/960 and 2/060 to 2/460)
C/O link road from Brahman Basti Khillian to Harizan Basti Khillian Kothewala G.P khillian and Barchha km 0/0 to 1/500 (SH C/O 900mm dia HPC at RD 1/420 and P/L GSB, Gr-II, Gr-III and MSS work at RD 0/540 to 1/120) Under SCCP) 2014-307-981
Job 1 A.R and M.O link road from Old Saloh Bhadouri road to Saloh Nalka 0-0 to 0-400 Sub Head Providing and Laying GSB, WMM, SS-1, RS-1 and BC RD at km. 0-0 to 0-400 and C.O Retaining wall RD 0-111 to 0-136, 0-176 to 0-200.
C/o Link road to Harizan Basti Dhadi village Fatoh km 0/00 to 0/230 SH Formation Cutting in km 0/00 to 0/130,Hume Pipe Culvert at RD 0/010 and Retaining Wall at RD 0/010 to 0/080 and metalling and Tarring at RD 0/00 to 0/130 under DMFT
Construction of Link road from Bhanra Kadoli to Thontha Shilli Bhagadi Chokar km 0/00 to 9/00 (SH ROFD from km. 1/065 to 1/195 ,2/120 TO 2/815 and 2/940 to 3/020 and C/O 900 MM Dia RCC Hume pipe culvert at RD. 2/864 and 3/420) Under SCSP
C/O link road to village Bhawai Baleech km. 0/00 to 2/870 (SH ROFD in km. 0/060 to 0/494, Hume Pipe Culvert at RD. 0/210, R/Wall in wire crate from km. 0/200 to 0/240 and R/Wall in wire crate at RD. 0/300 to 0/320) Under MNP
Construction of link road from NH-205 to village Kattal Bagheri Km. 0/0 to 2/015 (SH- Construction of 900mm dia hume pipe culverts at RD 0/120, 0/285, 0/525, 0/810, 0/870, 1/319, 1/750 and 1/795 and C/o of 6.00 meter span RCC Slab culvert at RD 0/69
C/O link road from Harijan Basti Shanad to Sheel Km.0/000 to 3/000 SH C/O P.C.C R/wall and Wire crate R/wall at various Rds C/O RCC Hume pipe culvert at RD.0/230, 0/820 0/920 and 1/105 i/c both side wing wall and P/L Kharanja stone soling.
Job 6 Construction of link road to Mohalla Nayan and Rajputtan of Village Baliwal Tehsil Haroli Distt.Una H.P km.0-0 to 1-465 Sub Head 2 Nos RCC Culvert at RD.1-255 and 1-450 and C.O CC Pavement at RD .0-840 to 0-855, 0-975 to 0-990,1-330 to 1-345 U
Job 13 Construction of link road Ward No. 7 in Upper Delan Hinhas Mohalla to Jakhera P.L C.C. Pavement in RD 0-0 to 0-055 and 0-090 to 0-300 , P.L 80mm thick interlocking paver blocks in RD 0-055 to 0-090 and C.O Retaining wall at RD 0-125 to 0-3
R R damages on link road to village Shakli to Nadu km 0 000 to 0 900 SH C O 900mtr Dia HPC At RD 0 120 0 700 and kharanja stone soling at RD 0 060 to 0 240 R Wall at RD 0 750 to 0 765 and B Wall at RD 0 400 to 0 420
Construction of link road from Ghareothi to Tipper Km 0/000 to 0/870 SH C/O 900mm dia Hume Pipe culvert at Rd 0/175 0/300 0/480 0/555 i/c both side wing wall and Providing/laying Kharanja stone in km 0/000 to 0/300 and 0/480 to 0/840
C/O link road from Kozang Nallah-II to Meber Khawanta Km 0/00 to 5/00 (SH-Providing protection work in G.I wire crate at RD 1/430 to 1/485, 1/520 to 1/575, 1/800 to 1/855.20 and R.R. Masonry at RD 1/240 to 1/260, Kharanja soling and C.C. pavement at
A/R and M/O to link road Harizan Basti Gulabgarh km 0/0 to 1/980 (SH-C/O Wing wall of existing box cell at RD 0/746 to 0/756 and wire crates in U/S side along the khala and C/O edge wall at RD 0/768 to 0/778 left side).
C/o link road from NH-205 to village Mehrog in GP Kothipura Distt Bilaspur Km 0/0 to 1/180 (SH-F/C i/c R/ wall, CD, GSB, M/T Tarring,Road side drain,parapets and Km stone etc in Km 0/0 to 1/180 including five year maintenance plan)under NABARD-XXVIII
Balance work for the construction of link road from Ghaith to Kohlari km 0/000 to 2/700 SH Construction of formation cutting at RD 1/510 to 2/700 900mm dia HP culvert at RD 0/386 0/692 and wing wall at RD 0/381. 50 to 0/384.50 and 0/387.50 to 0/390.
C/o Link road from Kharial Basti to Chanoria Basti via Nai Basti,Chatak Basti ward No.2 GP Nalsuha (SH ROFD in Km 0/325 to 0/800, c/o Embankment in km 0/225 to 0/325 Retaining wall at Rd. 0/225 to 0/305nd solid causeway at Rd. 0/200 to 0/225) under
C/O pucca link road village Majri to village Dhollar km 0/0 to 2/00 (SH P/L Gr-at RD 0/375 to 0/800 and 0/600 to 1/415 and gr-II at RD 0/375 to 1/00 and 900mm dia HPC at RD 0/680 and 1/308). Under MMGSY 3rd call
RRD On Link road from Rada Nallah to Dhandal 0/00 to 2/900(SH- C/O catch pit and wing wall to RCC hume pipe culvert at Rds 2/800 to 2/805 and R/wall at Rd 2/805 to 8/820, 2/830 to 2/866 and 2/875 to 2/885 under PDNA 2023).
RR Damage to Link Road Tikkari to Tangnu Road km 000 to 1500 SH CO RWall AND Bwall in RR Stone Masonary cm 1 6 AND Wire crate at RD 3525 to 3545 3525 to 3/570 6260 to 6/269 6883 to 6900 6900 to 6912 7325 to 7337 7708 to 7733 7708 to 7733 8145 to
Construction of link road from Nanidhar to Shankholi Km 0/0 to 2/600 (SH - Construction of Cross-Drainage works at various RDs in Km 0/0 to 2/600 i.e. 0/090, 1/611, 1/214, 1/742, 2/013, 1/904,2/267, 1/075, 1/113, 1/809 2/091 and c/o wing walls
R/R damages on link road Changer Ghumarn Nisal km 0/0 to 4/100 (SH P/L wire crate in R/wall at RD 0/140 to 0/155, 0/320 to 0/338, 0/470 to 0/476,0/810 to 0/830, 1/350 to 1/372 and 2/630 to 2/640) Under PDNA.
Periodical Renewal for the year 2024-25 on Link road Mawa Kaholan Jhikli to Gagret, (SH. Providing and laying 25mm thick Bituminous Concrete with thermoplastic paints in Km. 0/0 to 1/0, 1/0 to 2/0, 2/0 to 3/0, 3/0 to 4/0, 4/0 to 5/0 and 5/0 to 5/300
C/O CD and M/T on link road Jamu to Jamdagi Temple km. 0/00 to to 2/500 (SH P/L WBM G-I, G-II, and M/T alongwith road isde drain in km. 0/00 to 1/00 and 900 mm dai Hume Pipe Culvert from RD. 0/240 and 0/980)