Loading…
Loading…
10,897 results • Best match
(SH-F/C 5/7 mtr wide road at RD 0/0 to 0/600)
Balance work of Providing and laying G-II and G-III at Rd 0/00 to 0/705)
Sh Portion toward Shiloli Construction of R/Wall at RD 2/810 to 2/835 and 2/860 to 2/882 and B/Wall in wire crate at RD 0/900 to 0/980
U-Shape drain at RD 0/500 to 0/700, P/L WMM, Prime coat, Tack coat, Premix carpet and Seal coat at RD 0/800 to 1/300 and C.C.Pavement at RD 1/300 to 1/500
SH C/O R/Wall at RD 0/700 to 0/719 Under SCDP
SH Construction of Retaining wall at RD 0/045 to 0/100
SH 5/7 mtr wide F/C between km 0/225 to 0/525
Cutting in earth work at RD 0/300 to 0/390
C/o 3 mtr Span RCC slab Culvert at RD 3/200) PDNA 2023
SH C/O R/wall at Rds 0/750 to 0/783, C/O HPC at Rd 0/650
SH 5/7 mtr wide F/C between km 0/225 to 0/900
SH F.C work in 5.7 mtr. wide road at Km. 0.292 to 0.411
Construction of Breast wall at R.D. 0/630 to 0/648
SH C/o Crate wire Retaining wall at RD 0/255 to 0/274
P/L Kharunja stone soling from km.0/00 to 1/00, C/O RCC HPC at RD. 0/135 AND 0/570 , C/O Breast Wall in stone masonary from km. 0/735 to 0/755 AND C/O Unlined Drain from km. 0/300 to 1/00 ).
C/o 900mm dia hume pipe culvert In km 0/260, 0/420, 0/780 and 0/960
Construction of R/wall at Rd 0/660 to 0/670
SH P/L essential khurunja stone solling at Various RD between in Km 0/00 to 1/800 Under Deposit
P/L 80mm thick interlocking paver block at RD. 0/0 to 0/060).(Deposit work).
SH C/O R/Wall at RD 0/00 to 0/07.50 and P/L Kharanja stone Soling at various slushy reaches between RD 0/00 to 0/330
CO 900mm dia hume pipe culvert at RD 0190 with wing wall 300mtr Both side Under SCSP
CC pavement , ROFD, B/wall and R/wall at various RDs
C o R Wall at RD. 0.345 to 0.350
Construction of 3.00 mtr. span RCC slab culvert with approach with at RD 0/155)
Providing and laying 30 mm thick Bituminous Concrete with Paver Finisher on Km. 0/00 to 1/000
C/o Hume pipe culvert at Rd 0/180, 0/285, 0/345 i/c wing wall).
SH- C/O Breast wall at Rd. 0/900 to 0/930 and R/Wall at Rd 0/970 to 1/00.
Constrution of Wire Crates at RD 0/0 to 0/100 under OTMNP Head
C/O PCC R/Walls PCC B/Walls Wire Crate R/Walls at various Rds and P/L Kharanja Stone Soling in Km 0/510 to 2/000
Formation cutting, P/L 900mm dia RCC Hume Pipe culvert at Rd 0/200, 0/750, 1/350 1/630 and C/O R/wall B/Wall at various RDs)
C/O 6.00 mtr. span RCC slab culvert at RD 0/455 (OTMNP)
Formation Cutting, R/walls, B/wall, Crash barrier, C.D. work, GSB, WBM-II, WBM-III, Tarring, C.C. Pavement, side drain, parapets and road furniture including routine maintenance for five years after completion of construction work.(Under Nabard RIDF
Providing and Laying GSBG-I, G-II, M/T Edge wall and side Drain at Km 0/00 to 0/870
SH Formation Cutting 5/7 mtrs wide road in km 3/765 to 3/900 Under DC Deposit
C/O 5/7mtr. wide formation cutting i/c R/Wall C/O hume pipe culvert from RD. 0/0 to 0/450 Under MMGSY
SH F/C 5/7 mtr wide in Km 0/0 to 0/375
C/O PCC R/Wall at Rd 1/180 to 1/220 and PCC B/Wall at Rd 1/120 to 1/135
SH P/L CD Works at RD 0/085 and C/O R/Wall at RD 0/045 to 0/055
Providing and Laying Metalling and tarring in Km at RD-0/000 to 1/000
C/O PCC R/wall at RD 0/690 to 0/702, 0/785 to 0/800 and 0/815 to 0/820)
SH Construction of RCC Hume pipe culvert at RD0/080 0/280 and 0/460
SH 5/7 mtr wide F/C between km 0/00 to 0/450
P/L Granular Sub Base Coarse and Wearing Coat G II and Tarring work in km 0/500
F/C 5/7 mtrs wide in km. 0/00 to 0/660, C/o Dumping Structures between km. 0/00 to 0/660).
C/o Retaining wall in wire crate at RD 0/958 to 0/990 D/S Bridge. PDNA 2023
ROFD in Km. Formation cutting 5.7 mtr wide in Km. 0.0 to 0.075) BSP.2024.479 under Deposit
C/o 3.00 mtr slab Culvert at RD 2/360. PDNA 2023
Repair of Pot Holes b/w km 4/00 to 5/00 and 6/00 to 8/00 and 8/00 to 9/00
Providing and Laying 20 mm thick pre mix carpet in km 0.0 to 1.500 Under OTMNP Head
Construction of Formation cutting and Hume pipe culvert 900mm dia in km. 0/00 to 0/800