Loading…
Loading…
10,897 results • Best match
(SH C/o B/Wall at various Rds.)
Construction of PCC R/wall at RD 0/0 to 0/070 and wire crate wall at RD 0/165 to 0/173) VKV/2024/2134 under Deposit
Reconstruction of R/Wall.
C/o R/wall at Rds 0/570 to 0/601.50, Edge wall 0/570 to 0/675 up to R/wall, B/wall 1/360 to 1/384.30, 1/810 to 1/859, 2/235 to 2/276.20 and F/C in km. 2/227.70 to 2/276.20) DMFT
Construction of wire crate Breast walls at R.D. 0/105 to 0/135
P/L C.C Pavement at RD 5/300 to 5/430 , R/wall at RD 5/300 to 5/318 , V-Shape Drain)
SH Construction of R/wall in wire Crate at Rd 0/300 to 0/370 and 0/170 to 0/200 and P/L 600 mm dia HPC at RD 0/230
Construction of R/wall at Rd 3/990 to 4/00, 5/490 to 5/505, 5/180 to 5/190, 7/090 to 7/100, 7/285 to 7/310Providing and Laying Paver Block in various step at Rd 6/505 to 6/605, 7/210 to 7/260 an Construction of 2.00 mtr span RCC slab culvert at Rd
P/L cement concrete pavement in Km 1/045 t0 1/075
SH C/o R/wall at Rd 0/280 to 0/292.50
SH- Construction of B/wall at Rd 0/580 to 0/60 , removal of Land slide from Various Rds)
SH Construction of Eidge wall at Rd 0/00 to 0/015 and greeting at rds 0/00, Drain between km 0/00 to 0/600 and Parpets
SH F/C 5/7 mtr wide road at Rd 0/165 to 0/250 , C/o B/wall at Rd 0/032 to 0/041
Providing and laying cement concrete pavement, WMM, 1 4 8 1 1 5 3 at RD 0/00 to 0/020 and 0/340 to 0/410 Construction of retaining wall at Km. 0/007 to 0/022
(SH- C/o R/wall at RD 0/070 to 0/095)
SH Formation Cutting 5/7 mtr Wide road km 1/555 to 2/510
C/o 8.00mtr span slab culvert at RD 3/830) Under MMGSY
C/O 2.00 Mtr. Span RCC slab culvert at RD 0/675
C.C. Pavement at RD. 0.200 to 0.675) (MMSY)
SH C.O B.wall in RR Masonry in Km. 0.345 to 0.362
C/o R/wall at RD 0/585 to 0/605, C/o GSB, WMM, M/T from RD 0/350 to 0/685, 0/735 to 0/850, C/o cement concrete pavement from RD 0/685 to 0/735).
SH 5/7 mtr Wide formation Cutting between Km 0/00 to 0/150,900mm dia HPC at Rd 0/000
SH C/O R/Wall at RD 3/875 to 3/905
C/o R/wall at RD 1/760. PDNA 2023
C/O U-shape Drain, P/L CC Pavement in km 0/00 to 0/350
Construction of P.C.C. Breast wall at RD. 0/390 to 0/410, 0/540 to 0/565 and P.C.C. Retaining wall at RD. 0/940 to 0/960). PDNA
(SH- C/o R/wall in PCC 1.4.8 at Rd 1/810 to 1/830)
R/R Damages on link road Tansog to Jagloag Km 0/00 to 6/400(Sh C/o B/wall at Rd 0/080 to 0/100,Wire Carte R/wall at Rd 0/120 to 0/140 ,C/o U-Shape Drain ,P/L GSB,WMM,BC Woek at Rd 0/00 to 0/160)Under PDNA (LAT 76.784247 LOG 31.105554)
C/O link road Nalagarh Bawasani ti Harizan basti jabal Taprian km 0/0 to 3/500 (SH ROFD in km 2/500 to 2/300, Hiring of Poclain , wire crates in r/wall at RD 2/500 to 2/540, B/wall at RD 2/500 to 2/515 and 900mm dia missing culvert between km 0/00 t
Restoration of rain damages on link road to village Seo km 0/0 to 0/700. SH Construction of Breast wall at RD 0/015 to 0/040, P/L cement concrete pavement at RD 0/280 to 0/330 and 0/470 to 0/500, 0/550 to 0/635 and repair of pot holes at RD 0/0 to 0
C/O link road from Karot to Harijan Basti Fakrehra km. 0/0 to 4/0(SH- Formation cutting 5/7 metre at km. 0/0 to 1/0,C/O 4.00m span RCC slab culvert alongwith wing wall at R.D.0/260 and 0/300 and C/O Retaining wall at R.D. 0/120 to 0/135)Under SCCP.
R/R damages on Ramshehar Kuwarni road in km 0/0 to 11/750and RR damages link road Kunplate to Nand km 0/0 to 11/00 (SH P/L wire crate in R/wall at RD 6/960 to 6/973 and (SH C/O B/wall at RD 3/420 to 3/430, 3/500 to 3/515) under PDNA
R R Damage to Link road village Gumma Km 0 00 to 0 800 SH C o R wall at Rd 0 107 to 0 114 0 130 to 0 140 0 462 to 0 480 0 505 to 0 513 0 515 to 0 538 and 0 540 to 0 570 and filling in km 0 505 to 0 570
Restoration and Rain Damaged on link road village Bassi Km 0 000 to 10 000 SH Construction of wire crate in Retaining wall with Toe wall PCC 1 4 8 at Rds 0 060 to 0 075 0 345 to 0 360 0 165 to 0 175 1 495 to 1 510 and 4 165 to 4 180 and PCC R wall
Repair Maintenance under MMSRRY on Kotla Bassi Malot Suel road Km. 3/0 to 4/0 (2) Balghar Chatwal Landiara road Km 0/0 to 1/0 and 3/0 to 4/0 (3) Link road from Didian to Gurala Km 0/0 to 2/0 (4) Kaler to Jambria da Gharat Km. 0/0 to 1/500 (5) Kano
Job 5 Construction of Link road Amrali to Beetan to Gahua km 0-0 to 1-600 Sub Head C.O 3.00m Span RCC Slab culvert at RD 1-550, C.O 900mm dia hume pipe culvert at RD 0.950 and 1.450, C.O Edge wall at RD 0-535 to 0-790 and P./L WMM and BC at RD. 0-0 t
R R Damage to Badshal Nallah to Ramteri road Km 0 00 to 5 500 R R Damage on Pujarli koti road 0 00 to 4 500 R R Damage Sheel Ghat to Panethi road Km 0 00 to 2 500 R R Damage to link road to GaniGhat road Km 0 00 to 2 200 R R Damage to Karchari to
Link road from Village Khalla Kiar Koti Dhiman to village Kaiyarta Piplti Km. 0/00 to 5/645 (SH P/L WBM Grading-l,Grading-ll,M/T from Km. 1/00 to 2/00 alongwith road side drain in Km. 0/00 to 1/00and 1/00 to 2/00 and C/O PCC R/Wall from Rd. 0/9
C/O link road to village Koti km. 0/00 to 2/00(SH C/O RCC Hume Pipe Culvert 900M Dia at RD. 0/195,0/240,0/525 and 0/670 .C/O R/Wall at RD. 0/270 to 0/285, C/O B/Wall 0/585 to 0/615 and Khanja Soling from km. 0/00 to 1/00). Under BASP
R/R Damages on Kupri Link road in K.M. 0/00 to 1/300, C/o, R/Wall at R.D. 0/291 to 0/304, 0/505 to 0/525, 0/990 to 0/995 and B/Wall at R.D. 0/295 to 0/305, 0/970 to 0/982, 1/020 to 1/035, 1/145 to 1/155
Restoration of rain damages on link road Samlohal Chadol via Pickal Factory km 0/00 to 2/660 SH C/o both side R/wall at Rd 0/800 to 0/810,2/060 to 2/070 and Providing laying G-I at Rd 1/800 to 1/830,2/400 to 2/600 and G-II at Rd 1/400 to 2/600, Rep
Restoration and Rain Damaged on link road village Bassi Km 0 000 to 10 000 SH Construction of wire crate in Retaining wall with Toe wall PCC 1 4 8 at Rds 0 060 to 0 075 0 345 to 0 360 0 165 to 0 175 1 495 to 1 510 and 4 165 to 4 180 and PCC R wall
Restoration of rain damages on link road Dadhol to Jarora km 0/00 to 2/060 SH C/o wire crate a Rd 0/365 to 0/390 and P/L Cement concrete interlocking paver block at Rd 0/300 to 0/375, 0/990 to 1/035 and Cement concrete pavement at Rd 1/820 to 1/940 U
C/O link road to village odda km 0/0 to 2/00 (SH C/O B/wall at RD 1/120 to 1/150, V shape drain at RD 1/180 to 1/330, r/wall at RD 1/420 to 1/435 and Gr-I, Gr-II and MSS work at RD 1/00 to 2/00) Under OFC Deposit
R/M of link road from Bhupur to kedarpur km 0/0 to 0/700(SH-P/L G.S.B,G-II in km 0/610 to 0/780,Interlocking concrete block pavements 0/350 to 0/780 and U-shape drain in km 0/480 to 0/580 Kharanja stone solling from RD 0/480 to Yamuna river side) (un
R R Damage to link road karchari to shallan panchyat ghar road km 0 00 to 2 900 SH Widening of narrow reaches at different RD B wall in wire crate at RD1 345 to 1 360 1 375 to 1 390 1 750 to 1 760 1 205 to 1 218 R wall at RD 1 585 to 1 868 1 30
R R Damage to link road Pali to H B Khashadhar Via Odidhar road Km 0 00 to 1 200 SH C O B Wall in RR Stone masonary cm 1 6 at RD 0 076 to 0 096 0 585 to 0 645 and R Wall in RR stone masonary cm 1 6 at RD 0 465 to 0 525
Restoration of rain damages on link road from G.T.B. road to village Baloh km 0/00 to 1/510 SH CC/o V-shape drain at Rd 1/060 to 1/260, U-shape Drain at Rd 0/780 to 1/00, B/wall at Rd 0/970 to 1/00, 1/030 to 1/050, Interlocking Paver Block at Rd 0/
Balance work of construction of road from Gehar Speru Kandwari Kalohi Rajehar Km 0/00 to 4/650 i/c 19.75 mtr Span bridge over Pun Khad in Distt. Kangra (HP) (SW- C/o Wearing coat , railing etc)