Loading…
Loading…
10,897 results • Best match
SH C/o B/wall in R.R Masonry at RD. 0/00 to 0/020 and 0/350 to 0/365
C/O R/wall at RD 0/060 to 0/090, 0/140 to 0/190 0/245 to 0/255) (PDNA2023)
formation cutting, R/wall, C.D. soling ,wearing ,Tarring ,Parapets, V-Shape drain and 2 Nos 10.00 mtr span RCC slab culverts ) Under Nabard RIDF-XXV).
F/C 4/5 Mtrs wide road 0/00 to 1/200
Metalling and Tarrring works at Rd. 0/500 to 1/010
Sh Construction of B/wall at RD 0/350 to 0/400 , 0/640 to 0/680 , 0/915 to 0/945 and Kharanja Stone soling at various RDs between km 0/000 to 4/190
SH C/O R/Wall at RD 0/180 to 0/200
SH Providing and laying GSB WMM and Metalling/ Tarring in km 0/500 to 1/700 and 80mm thick interlocking paver block at various RDs Under SCSP Head
(SH- C/o embankment at RD 0/885 to 1/165, cutting at RD. 1/030 to 1/165. P/L GSB at RD 0/855 to 1/165, khranja stone solling at RD 1/045 to 1/165, C.C. 1,4,8, 1,2,4 at RD 0/855 to 1/165 and interlocked tiles of ISI mark at RD 0/855 to 0/975)
SH- Formation cutting ad wire crate for dumping site
SH C/o Sub grade GSB C.C. pavement in km 0/0 to 0/635
P/L GSB, WMM and M/T in Km 7/998 to 8/706
(SH-C/O R/wall at RD 1/125 to 0/145)
P/L M/T in km 0/00 to 1/250
C/O R/wall at Rd 0/330 to 0/360, 0/610 to 0/625, 2/540 to 2/560 B/wall at Rd 2/050 to 2/064, 2/090 to 2/104, 2/210 to 226.50
Providing and laying GSB G-II G-III
(SH- F/C 5/7 mtr wide road at RD 0/0 to 0/360)
Construction of Retaining wall at RD-2/190 to 2/208.50 and 1-9-- to 1-920
SH Construction of 6.00 metre span RCC Culvert at RD 0 195 Abutment and Slab
P/L CC pavement at RD 0/400 to 0/600)OTMNP
Formation cutting at Rd 0/500 to 1/500 , C/o Hume pipe culvert at Rd 0/602, 0/790,0/975,1/315 i/c wing wall and C/o R/wall at Rd 0/880 to 0/890, 1/350 to 1/365
Construction of retaining wall at RD 2/270 to 2/295 and 2/295 to 2/308)
SH C/O ROFD and at 0/0 to 1/185 C/O B/Wall R/Wall and C/O 2.5 Mtr. Span Salab Type Culvert at RD. 0/570
Providing and laying Tack coat and Bituminous Concrete in Km. 2/0 to 4/0).
P/L Cement concrete pavement from RD 0/687 to 1/060 OTMNP
SH C/O Breast wall at Rd 0/780 to /810 and drain Rd 0/750 to 0/900
Improvement of deficiency, Construction of Retaining walls, Breast walls, P/L, M/T, Construction of 900mm dia hume pipe culvert, V-shape drain and parapets at R.D. 0/0 to 1/0
Construction of R/wall at Rd 4/045 to 4/075
P/L 30mm thick bituminous concrete in kms 0/800 to 1/500 I/c paver block, G-III in pot holes.
C/O R/Wall at RD. 0/142 to 0/147 and unlined drain at various RDs ).(Under PDNA).
P/L 25mm thick Bituminous Concrete with Paver Finisher in KM 0/0 to 1/00
(Sub Head - Construction of Breast wall at km 1/465 to 1/480)
SH Formation cutting in Km 0/0 to 0/265)
Repair of pot holes PL 30mm thick BC and 025mm thick road marking thermoplastic strip
(SH- Trimming of grass and weeds from shoulder/burs and patch work RD 0/0 to 4/0)
P/L GSB, CC Pavement Edge wall in Km. 0/00 to 0/500). G.P. Kandrola Plassi (under MMGSY)
F/C ,R/wall,B/wall ,C.D. works, soling ,wearing ,Tarring ,Parapets, V-Shape drain and 1 No. 6.00mtr Nabard RIDF-XXV).
SH Construction of 5/7 mtr. wide road formation cutting in km 0/075 to 1/030 Edge wall at RD 0/055 to 0/064 Retaining wall at RD 0/850 to 0/865 0/915 to 0/930 and 900mm dia hume pipe culvert at RD 0/450 0/630 and 0/730
P/L G-I, G-II and 20mm thick premix carpet with seal coat in kms. 0/0 to 0/500.
P/L G-I at Km 1/908 to 1/938 and C.C. Pavement at Km 1/908 to 1/948
C/O PCC B/Wall at Rd 0/515 to 0/538.30
SH C O Breast wall at Rd 4 910 to 4 925
(SH-P/L interlocking concrete block pavement at RD 0/345 to 0/450).
Construction of wire crate Retaining walls at R.D. 0/180 to 0/205
(SH- F/C 5/7 mtr wide road at RD 0/705 to 1/0)
C/O R/wall at Rd 4/095 to 4/115)
SH C/O B/Wall at RD 0/075 to 0/092.50 and Kharanja stone soling at various slushy reaches between km 0/00 to 0/160
Construction of cement concrete pavement road at RD 0/120 to 0/220
Providing and Laying 20 mm thick premix carpet with seal coat including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 0/00 to 0/350) (year 2025-26 Village road
SH F C 5 7 mtrs wide road at RD 0.030 to 0.780