Loading…
Loading…
10,901 results • Best match
F/C in 5/7 mtr. wide road at R.D. in K.M. 0/210 to 0/300
SH Providing and laying WBM Grading III and metalling and tarring from Km 0/0 to 1/200
Construction of Cement concrete pavement at RD 0/070 to 0/436 and 0/468 to 0/505 Hume pipe culvert and Embankment at RD 0/489)
SH C/O R.R Masonry abutment at 0/850 Sissu side and Both side abutment protection wall in wire crate.
Construction of Retaining wall RD. 0/325 to 0/341 and C/o Hume pipe culvert at RD. 0/425 along with Wing walls).
Formation cutting, passing place, retaining walls, cross drainage work, GSB,WBM-II,III, tarring work, side drain, parapets and road furniture etc. Including routing maintenance for five year
Providing and laying Metalling and Tarring in Km. 0/0 to 1/500
SH Providing and Laying Wearing Coat Grading -II 63-45 mm size in Km. 3/850 to 4/745)
Formation Cutting 5/7 mtr wide road in Km 1/000 to 1/650
Formation cutting , GSB,WMM, Metalling Tarring , drain, cross drainage work, Retaining wall, Breast wall, Parapets, Km stones, dumping site 0/0 TO 5/022 etc. including five year maintenance) Under NABARD RIDF -XXX
P/L C.C.Pavement at RD 0/000 to 0/325
Construction of PCC B/Wall at RD 1/615 to 1/625 , R/Walls at RD 0/935 to 0/950, 1/530 to 1/535 and 1/555 to 1/575
SH F/C 5/7 mtr wide between km 0/585 to 0/720 and R/Wall at RD 0/300 to 0/320
Rofd,P/L GSB, G-II, G-III and open graded Premix Carpet from RD 0/850 to 2/250 and Construction of 1.50mtr span RCC slab culvert at RD. 2/045 , V-shape drain at Rd 0/750 to 0/910 and Breast wall at Rd.0/325 to 0/350).Under SCSP
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher and V-Shape drain between Km 3/000 to 4/00
SH Cross drainage works along with wing wall
Formation cutting Km 0/450 to 0/930, C/o 900 mm dia hume pipe culvert at Km 0/535, C/o R/wall at Rd 0/490 to 0/520 and B/wall at Rd 0/540 to 0/560
SH Providing and laying Premix Carpet with seal coat including correction layer Km 1/00 to 2/00
Repair of pot hole PL 30mm thick BC and 025mm thick road marking thermoplastic strip
C/o Removal of Formation Deficency, Formation cutting, R/walls B/walls, C.D eorks and C.C. pavement etc.) Under NABARD RIDF XXVI
SH F/c 5/7 mtr Wide road between Rds 0/165 to 0/300 C/O R /wall at Rds 0/00 to 0/150 and P/L Kharanja Stone Soling at Rds 0/00 to 0/100
P/L stone soling and C.C. pavement from RD. 0/395 to 0/645). (Under PDNA).
SH F/C in 5/7 mtr. wide road km 0/045 to 0/225
Providing and laying 30 mm thick bituminous concrete in km. 0/00 to 0/650
(SH-C/O H.P.C. of 900mm.dia with wing walls at RD. 0/705 and C/O retaining wall in wire crate at RD. 0/165 to 0/185).
C/O R/ Wall and Crate work at RD. 0/480 to 0/495
Formation cutting at R.D. 0/0 to 1/0
P/L cement concrete pavement at Rd. 0/520 to 0/600, 0/900 to 1/00, 1/400 to 1/430 (Actual Rd 1/380 to 1/460, R/wall at rd.0/589 to 0/616, 0/550 to 0/586,wire crate R/wall at rd 1/429.60 to 1/450 and V-shape drain at various rds) (Under PDNA)
Construction of 900 mm dia hume pipe culvert at various R.D. 0/030 and 0/345 along with wing walls
SH Providing and laying cement concrete pavement at km 0/270 to 0/510) SCSP
( SH- Construction of 3.00 mtr span RCC slab culvert at RD 0-795
SH Providing and laying GSB Wet Mix Macadam BC including V Shape Drain at km 0/0 to 0/500
FORMATION CUTTING IN KM. 0/00 TO 1/00 AND C/o R/WALL, B/WALL AT VARIOUS RDS IN BETWEEN KM. 0/00 TO 1/00) (UNDER S.C.S.P HEAD
Construction of Super Structure of 91.674 Metre span (3x30 plus 2x0.837) prestressed concrete Box Girder bridge over Buhal khad at RD. 0/480 including Both side approaches
SH Construction of Hume pipe culvert at RD 0 150 0 200 0 290 0 380, Edge wall at RD 0 250 to 0 280 0 292 to 0 345 0 350 to 0 400 0 410 to 0 440 and Providing and laying GSB in km 0 045 to 0 400 Under SCSP Head
Construction of 6.00mtr span slab culvert at RD. 0/410 with approaches . OTMNP
C/O 1 No. Spur at RD. 0/522
(SH- Repair of Pot Holes in km. 0/0 to 5/0)
SH Construction of retaining walls at various RDs Hume Pipe Culverts and Slab Culvert
C/O PCC R/Wall at RD. 1/885 to 1/894 and providing patch work at various RDs ).(Under PDNA).
C/O B/wall at Rd 0/380 to 0/405 C/O U-Shape dtrain in Km 0/220 to 0/490) (under PDNA)
P/L Interlocking Paver Block Flooring in Km. 0/390 to 0/480).
SH Construction of 5/7 metre wide road formation cutting construction of retaining wall at km 0/0 to 0/690 and Cross drainage at RD 0/255 0/360 0/510 with wing wall and U-Shape drain RD 0/0 to 0/690
Providing and Laying WBM G-II for profile correction and 2 cm Thick premix carpet with seal coat Km 0/0 to 1/0 and 1/0 to 1/500
Providing and laying wearing G-II and cement concrete pavement in Km. 0/0 to 0/080
Formation cutting, Providing and laying GSB from RD 0/770 to 1/120, Hume Pipe culvert at RD 0/230, 0/290, 0/395 and Causeway from RD 0/340 to 0/355) (Under MMGSY)
(SH- C/o 5/7 mtrs. wide road including retaining structure in 0/460 to 1/470, wire crates, C/o U-shape drain in essential reaches and construction of 900 mm dia HPC at RD. 0/615 and 0/855) under MNP.
P/L G-II and C.C. Pavement at km 0/00 to 0/100
C/o Edge wall at RD 0/700 to 1/00, CC Pavement at RD 0/700 to 1/110 and 1/250 to 1/345, P/L GSB at RD 0/700 to 1/110,G-II at RD 0/700 to 1/110 and RD 1/250 to 1/345 and HP Culvert at RD 0/800