Loading…
Loading…
10,870 results • Best match
Job 4 Construction of link road Jaijon Modh to Tahliwal Chowk via Bhai Ka Modh including 3 Nos Bridges from Km. 0-0 to 17-500 MDR-129 Sub Head Construction of road from Km. 0-00 to Km. 17-500 UNDER CENTRAL ROAD INFRASTRUCTURE FUND.
R R Damage to link road Shakli to Nadu Km 0 00 to 1 00 SH C O R Wall at RD 0 20 to 0 40 0 235 to 0 245 B Wall at RD 0 450 to 0 470 R Wall at RD 0 755 to 0 764 Widening of road at various RD 0 00 to 0 20 0 235 to 0 257 and 0 750 to 0 770and P L
(SH- Providing and Laying Tack Coat, bituminous concrete 30mm thick including profile correction Km. 0/0 to 0/500) for the Year 2023-24) Rural Road
PERIODIC RENWAL ON SADWAN KALEHSWER rOAD SUB HEAD P.L 30MM THICK BITUMIOUNS CONCRETE IN KM 2.0 TO 4.0 VR 006313403 VR006313404 RURAL ROAD
Improvement of road at various locations in Ward No 7, MC Parwanoo Subhead - P/L 60/80mm paver blocks and CC
Improvement of road at various locations in Ward No 3, MC Parwanoo Subhead - P/L 60/80mm paver blocks and CC
Improvement of road at various locations in Ward No 8, MC Parwanoo Subhead - P/L 60/80mm paver blocks and CC
Improvement of road at various locations in Ward No 1, MC Parwanoo Subhead - P/L 60/80mm paver blocks and CC
Improvement of road at various locations in Ward No 9, MC Parwanoo Subhead - P/L 60/80mm paver blocks and CC
Improvement of road at various locations in Ward No 2, MC Parwanoo Subhead - P/L 60/80mm paver blocks and CC
Improvement of road at various locations in Ward No 6, MC Parwanoo Subhead - P/L 60/80mm paver blocks and CC
Improvement of road at various locations in Ward No 5, MC Parwanoo Subhead - P/L 60/80mm paver blocks and CC
Improvement of road at various locations in Ward No 4, MC Parwanoo Subhead - P/L 60/80mm paver blocks and CC
( SH - Providing and laying 25 mm thick mix seal surfacing laying with paver finisher, road marking strips of hot applied thermoplastic compound (Paving line) between Km 0/000 to 1/000 and 1/000 to 2/000 ).
SH - Providing and Laying 25mm thick Mix Seal Surfacing with Paver Finisher in km 0/0 to 1/000
Providing and laying built-up spray grout, bituminous concrete in Km.0/00 to 2/000
( SH - Providing and laying 25 mm thick mix seal surfacing laying with paver finisher between Km 0/000 to 1/000 and 1/000 to 2/000 ).
( SH - Providing and laying 25 mm thick mix seal surfacing laying with paver finisher between Km 3/500 to 4/500).
Improvemnet of Gawas to DungaNaltu road km 000 to 1500 SHCO Widening of road at RD 000 to 0855 CO BWall at RD 000 to 0035 BWall at RD 0070 to 0095
Widening of road leading to Dev Loadge from Bhargva Estate RD 0 0 to 0 450 (SH Construction of Retaining wall Between RD 0 310 to 0 320mtr) in ward No 10
Balance Work Widening of road at different points from Parimahal Chowk to SSB Gate in wad No 27 Kasumpti (SH Widening of different point of road and Construction of B wall etc)
SH providing and laying bituminous concrete 30 mm thick in km. 0/0 to 1/500) (DRRP No-HP-03-03 VRooo3) Under PMGSY with paver finisher
Providing and laying 25mm thick Bitumenous concrete in km. 2/0 to 3/0 and construction of Side drain in 100 Metre length
Annual Surfacing on link road from Chalet to U.S Club Gate RD 0/00 to 0/830 and Road from Nav -Vahar to Ritz Cinema at RD 0/00 to 1/170, Link road to Holyhock at Rd etc
C.O LINK ROAD FROM MALKOA TALAI RATTAN BEHAR VIA DHIMAN BASTI CHALALI UP TO LINK ROAD BHARWAIN BEEHAN KM 0.0 TO 1.050 SUB HEAD 5.7 METER FORMATION CUTTING KM 0.300 TO 0.885 C.O R.WALL AT RD 0.340 TO 0.360
Construction of 2 Blocks of Type-II (16 Nos.) Residential Qtrs & Development work including approach road at Directorate of Forensics Services HP Junga including internal electrical installation work Subwork/Packages: Construction of 2 Blocks of ... including approach road at ...
C O Link road to Village Bahrota Km 0 0 to 1 0 SH Removal of formation deficiency in Km 0 0 to 0 300 RCC900 mm Dia pipe culverts at Rds 0 180
Strengthening of Pavement Including Improvement of Road Safety Work Construction of Retaining Wall Breast Wall Thrie Beam Crash Barriers Road Side Drains Slab Culverts Solid Cause Way etc in Km 286 00 to 329 00 on NH05 in the State of HP
(SH - P/L 30mm thick bituminous concrete in km.4/0 to 5/0
C/o slab culvert and link road vill khairan wala to muslim basti Khairan wala. GP Manpura.
Providing and laying interlocking paver blocks in link road from DC residence road to Sherwali Kothi Solan
Construction of link road to village Kalmala (SH F/C at RD 0/900 to 1/570
Repair and Restoration on link road Kothipura Rajpura Prohi Deoth road km 0/00 to 8/785
Construction of link road to village Sakral (SH Formation cutting at RD 0/000 to 0/615
C/o link road to M/s Samrath Life Science and M/s Alves Healtcare Nangal, Nalagarh.
RR Damage to link road HB Dayarmoli SH Co Bwall at Rd 0850 to 0880 Deposit Work
Up gradation of link road from Una Takka to Upper Upper Kotla Kalan via Shiv Mandir Ajnouli
Construction of link road from Amehra road towards Abadi Dharampal Harijana, Gram Panchayat Dhamandri, Distt. Una (HP).
R.R. damages on link road from Buini khad to village Buini km. 0/00 to 1/200
Restoration of Rain Damages on link road Pullacher to Chhamb -Bhujan km 0/00 to 2/175
CO MT from Patta Awahdevi road to link road to village Kosar Km 000 to 1 500
Maintenance of Jeepable public path/road from Sidhbari Chowk to link road Rakkar in Ward No. 17
C/O Link road NH-88/303 to vill Kala Pani Km 0/000 to 3/200
Recarpeting of link road Petrol Pump to village Ranguwal and paver block, drain Village Ranugwal G.P. Rajpura.
onstruction of Link road from NH-Nauni Brahampukhar road to Rajpura km 0/00 to 1/200
Const of rain shelter on link road Bhaira to Panjora road at RD 0010 against temple deposit
C/O Welcome Gate to Village Ropa on link road to Ropa Valley (SH-C/O Gate
Re-carpeting and Protection work of link road from TVS factory to village Bhatian G.P. Bhatian, Nalagarh.
C O link road from Loran to village Sarli Km 2 510 to 6 660 Under NABARD
VKV.2024.196.C.O LINK ROAD SAGNNAI KALA PANGA ROAD TO HARIJAN BASTI BASTI KALA PANGA ING.P SANGHNAI