Loading…
Loading…
10,870 results • Best match
Special Repair of road of School building at PM Shri KV Bakloh, Chamba (HP)
Special Repair of road of school building at PM Shri KV Bakloh, Chamba (HP).
SH Providing and laying 25mm thick Bituminous concrete
C/O both side approaches for 30 mtr. Effective span RCC Box Girder Bridge over Batheri Khad on Link road to Batheri at RD 1/480
Co link road to ITI building at Patta Mehlog Distt. Solan H.P. (SH Pl GSB, GIII and 30mm thick BC in Km. 000 to 0110 Deposi
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 1/000 to 2/000
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 0/000 to 1/000)
SH - Providing and Laying 25mm thick Mix Seal Surfacing with Paver Finisher in km 0/0 to 2/000
SH- Providing and Laying 30mm thick Bituminous concrete laying with paver finisher in km 0/300 to 1/000
Providing and Laying 20mm thick premix carpet surfacing with seal coat in Km 4/0 to 6/0 Under PMGSY Rural Road
C/O link road from Mashobra Chowk to Balika Ashram km. 0/00 to 0/430 SH Providing and laying G-III Bitumen macadam and Tarring with 25mm thick Bitumen concrete
Construction of road near processing site Kansa
Periodical renewal on Nagabari Nalla road under PMGSY for the year 2024-25 (SH Providing and laying 25mm thick Mix seal Surfacing in km. 8/0 to 11/00
Periodical renewal on Madanpur Snoh road under PMGSY for the year 2024-25 (SH Providing and laying 25mm thick Mix seal Surfacing in km. 0/0 to 1/00)
Construction of approach road bifurcating from Lippa Asrang HPPWD road to various components at Lippa Intake site under IKHEP Stage II and III HPPCL Reckong Peo HP. Sub Head Providing and laying stone soling from RD 533 to 755.2m and W metal beam ... of approach road to ...
Construction of link road from Sanjhot Kaddu road towards Abadi Kumaharan, Gram Panchyat Nangal Salangri, Distt. Una (HP).
Annual Maintenance Plan for the year 2024-25 on 1 Link road village Kot Langsa (VR-185) Km
R.R Damages link road Chaura to Chhota Kamba 0.00 to 15.00. SH- ROFD at RD 8.700 to 8.740
Providing Crash Barrier on Link road to Sirna at various RD in Km. 0/0 to 2/500
M/T of link road to Village Ghatta KM 0/0 to 2/325 (under NABARD) RIDF-XXVI
RR Damags to link road Sadrali km 00 to 1700 SH CO BWall at RD 0675 to 0691
C/o link road from Buini Nallah to Buini km. 0/00 to 1/200 under BASP deposit
Construction of link road to from Shila-Bati to Duga via Lanj km. 0/00 to 1/600
Restoration of Rain Damages NH-21 to link road to village Dadwal km 0/00 to 1/15
AMP for the year 2020 21 on Link road Bhatoli Khurd K M 0 0 to 3 0
Construction of street in wards No 07 Near the house of SmtAmriti Devi Towards Andhora Link Road Amb
M/T of link road from Bashad to Koltha Kanda Katmore road km 0/00 to 7/600
C/o Link road from Thana Industrial Area to Industries near St. Lukes School Kotla in G.P. Thana.
RR Damage to link road village dali km 000 to 300SH Co Bwall at Rd 2960 to 300
Balance work of C/o link road to Heliport at Palampur Distt. Kangra (HP) (SW- Breaking of stones)
Construction of cement concrete link road and culverts in Village Dohak, Distt Bilaspur under Social Welfare Activities (SWA)
Widening and M/T of link road from Bagipul to Baga Sarahan Km 0/000 to 12/795
Construction of Link road from Tikkar to Tirkridal via Challown upto Punan Khad Km 0.000 to 5.500 HP06379
Construction of link road to Bari Dehra Temple Km. 0/0 to 1/300 Construction of Retaining walls
Link road to Shiv Temple near Sai Garden (SW- P/L G-III and Tarring works (MC Deposit)
C.O link road Harizan Basti Balokhar Km. 0.0 to 2.00 SH C.O R.wall at RD 0.765 to 0.795.
C/O Link Road from Haripur Main Road to Near Bala Ram House Village Upper Tipra GP Surajpur.
Restoration of Rain Damages on link road Swarghat to Manjher via Matnoh km 0/00 to 5/950
Construction of link road Dehri Sakoh Padehar road SH Construction of UShape drain at Km. 0.200 to 0.330
C/O Link road from Bagdella to Tip via Harizen Basti Km 2/218 to to 2/300
Restoration of Rain Damages on link road Swarghat to Manjher via Matnoh km 0/00 to 5/950
Restoration of Rain Damages on link road Swarghat Manjher Via Matnoh road km 0/00 to 5/950
Construction link road from Banikhet to village Kanda (Harizan Basti) K.m. 0/0 to 2/650 under SCSP
Repair and Maintenance on link road from NH-21 to village Jamli Neri 0/00 to 2/500
RR Damage to link road HB Bamnallah km 000 to 2500SH- Co Bwall at Rd 1720 to 1745
Restoration of Rain Damages NH-21 to link road to village Dadwal km 0/00 to 1/150
Construction of link road Dhawi to village Mehol Km 0/0 to 0/950SH Providing and laying wearing and Metalling/tarring at Rd 0/150 to 0/950 edge wall at RD 0/212 to 0/239 Under MMGSY
Restoration of rain damages on Wazir Bowali to Mohali road Km 0/00 to 26/00 SH Widening of road at RD 19/220 to 19/255 20/990 to at washed away portion
R R Damages to Kanewara Khad to Noi road km 0 0 1 100 SH Widening of road at RD 1 00 1 00 C O R Wall at RD 0 030 0 060
Construction of Mini Secretariate/combined office building at Chamba (SH Construction of Building portion WS and SI , Rain water harvesting system ,Boundary wall approach road and site development