Loading…
Loading…
10,878 results • Best match
Providing and laying 30mm single layer bituminous concrete (HP0404VR010015301-302 km. 0/0 to 1/0 and 1/0 to 1/150
SH C/O B/Wall at RD 0/185 to 0210, R/Wall at RD 0/233 to 0/240 and 0/415 to 0/440 and link road to Village Kelvi B/Wall at RD 0/688 to 0/714
(SH - P/l 30mm. thick bituminous concrete in Km. 3/00 to 4/00 and v-shape drain with E/wall RD 2/120 To 2/220)
Improvement of curves, passing places, missing cross drainage work, PCC drain, PCC pavement interlocking paver block and tarring work
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board and Cell Filled Cement concrete Pavement.
ROFD, R/walls, B/walls Gabion walls, M/T, Cross Drainage work, Drain, Parapets, Crash Barriers and Citizen information Board, Logo Board, KM stone and 200 Metre stone and five years routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Job 1 Construction of link road to Lower Badehra Santoshi Mata Mandir to Bhai da more to Bhadouri road RD. 0-0 to 0-800 Sub Head Formation cutting, earth filling, Edge wall, P.L GSB, WMM and BC in km. 0-0 to 0-700 Under OTMNP
(SH- P/L 30mm thick bituminous concrete in km. 0/0 to 1/0 and 1/0 to 1/890).
Restoration of rain damages on link road Bhalana Chaleli Harizan Basti Km. 0/00 to 2/00 (SH C/o roller compacted concrete pavement at RD 0/620 to 0/970 ) Deposit work
(SH- P/L 30mm thick bituminous concrete in km. 0/0 to 1/0, 1/0 to 1/280) and Rural Road Shahpur to Majhiar road (HP0413VR109) km. 0/0 to 1/0 and 1/0 to 1/450 (SH- P/L 30mm thick bituminous concrete in km. 0/0 to 1/0 and 1/0 to 1/450).
ROFD, M/T, Missing R/Walls, B/Walls, W-Metal Beam Crash Barriers, Sign Board, CD Works and five year maintenance under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-502.
R R Damage and Improvement of Hingwala Mini Lakadhar road SH Widening of road at various RD 1 315 to 1 420 1 570 to 1 645 2 015 to 2 135 2 585 to 2 660 and C o R wall at RD 1 195 to 1 220 1 455 to 1 500
C/o Batoh Jeora road Km. 0/0 to 6/0 (Portion Km. 3/0 to 6/0) (SH-Widening of road in Km. 3/0 to 3/525, C/o 900mm dia hum pipe culvert at RD 3/130 to 3/490, 3/940, 4/020, 4/150 and 4/455) under MMGSY
Improvement of road, Passing Places, R/Wall, CD Work, GSB, WBM-II, III, Tarring work, CC Pavement, Side Drain and Parapet Under Nabard RIDF XXVII). including 5 year routine maintenance after completion the work.)
P and L AND COMPACTION OF 30 MM THICK BC AT SITINGIRI HELIPAD AND ITS APPROACH ROAD AT KM 121ON MS RD INCLUDING CLEANING OF ROAD SURFACE AND APPLYING TACK COAT AND ROAD MARKING ALL AS PER PS MORTH SPECIFICATION FIFTH REVISION UNDER PROJECT DPK IN HP
Periodical renewal on Various roads under Annual Maintenance Plan for the year 2024-25. (SH- Providing and laying 25 mm thick Bituminous Concrete on Shillai Achoti Pandiyat toad Km 0/0 to 4/00, Koti Uttrou road Km 0/0 to 5/00 Approach road HP PWD
Balance work of construction of 396 mtrs high level pre-stressed concrete girder bridge (11 spans on 36 mtrs each) over river Giri on Rampurghat Manpur Deora road at RD 3/290 including approach road on both side of the bridge. (SH C/O Manpur Deora s
Construction of Helipad at Sanghnai Tehsil Ghanari Distt Una SH Const of approach road for Helipad by providing and laying GSB WMM and Tarring in km 000 to 0700 and Retaining wall at RD 0500 to 0650, protection wall including drain from RD 00 to 026
C/o exist road for HRTC Bus Stand Ghumarwin approach road bus stand to seer khad Bridge on NH 103 km 0/00 to 0/300 SH Providing and fixing single side double W metal beam crash barrier at RD 0/180 to 0/260 Deposit Work
Construction of 2 Blocks of Type-II (16 Nos.) Residential Qtrs. & Development work including approach road at Directorate of Forensics Services (H.P) Junga including internal Electrical Installation works. SH: Providing Computer Data Entry Services & office attending services at office premises of Shimla Sub-Division-V, CPWD, Shimla.
Improvement, C/o Passing places, CD works, GSB, WBM-II, Side drain, Parapets, CC Pavement and Tarring work) under PMGSY-II (Batch-I, 2019-20) Package No.HP-08-539.
Providing and laying 30mm thick Bituminous concrete, including profile correction in Km 5/300 to 6/300
Providing and laying 30mm thick Bituminous concrete, including profile correction in Km 5/0 to 9/0
SH- Providing and Laying 25mm thick Bituminous Concrete laying with Paver Finisher in km 4/000 to 5/000
SH- Providing and Laying 25mm thick Bituminous Concrete laying with Paver Finisher in km 1/000 to 2/000
Providing and laying 30mm thick Bituminous concrete, including profile correction in Km 2/0 to 4/0
SH - Providing and Laying 30mm thick Bituminous concrete laying with paver finisher in km 2/000 to 3/000
SH- Providing and Laying 25mm thick Bituminous Concrete laying with Paver Finisher in km 7/000 to 7/970
Providing and laying 30mm thick Bituminous concrete, including profile correction in Km 1/0 to 5/0
Under Performance Based Based Maintenance Contract (PBBMC) for the Rural Roads year 2021-22 (Major Head 3054-RandB)(NP) Demand No 10
Construction of road, road side drains and culverts at Ind. Area Kandrori Distt. Kangra (HP).(SH-Green cover)
Construction of road, road side drain at Ind. Area Distt. Kangra (HP) (SH- Construction of left out drains)
Construction of road over R wall from Jaunaji Road toward Dhali Nadoh Village in Ward No.8 Phase.I
Construction of road Cement concrete pavement from Deonghat to bhalla house up to T.C.P. Ward No.1 Solan.
Construction of road to connect the main road to 33/11 KV Sub station Gasota under HPSEBL Hamirpur.
Construction of road from Industrial Area road to M/S AVG Industries at Kala-Amb Distt. Sirmour (HP).
Construction of road over R wall from Jaunaji Road toward Dhali Nadoh Village in Ward No.8 Phase.II
SDP/2023/533 Other Geometrical Improvement of road Pacca Bharo to Karoa via Banial basti (SH P/L GSB, WBM G II, Premix carpet Seal Coat in Km. 1/400 to 1/450 and 1/465 to 1/590)
SH Construction of Retaining wall at RD 0.460 to 0.466 0.480 to 0.489 0.510 to 0.519 Edge wall at RD 0.450 to 0.492 and providing and laying cement concrete pavement at RD 0.536 to 0.600
Restoration of rain damages on link road Jole to Kaint via Bhooran Amroh Dhrun Kuhroo Sanjot road at Km 000 to 14255 SH Construction of Retaining wall at RD 13 713 to 13727
C.O LINK ROAD FROM KOTLA GAHTTI ROAD TO VILLAGE KHANOUR UP TO CHOUWKI DO BAR KM 0.0 TO 2.200 SUB HEAD 5.7 METER VIDE FORMATION CUTTING INKM 0.885 TO 2.200 UNDER INDUSTRAIUL CORRIDOR
M/T of link road from Hong to Monastery Km. 0/00 to 1/00 (SH- Providing and laying G-II, G-III and premix carpet from Km 0/00 to 1/00
Link road to Kheri Lanacheta road Village Pipli Km.0/0 to 4/510 (SH C/O PCC R/Wall from km. 0/090 to 0/150) .Under Black Spot Identified by HRTC
C/O Link road to Village Malling Km. 0/00 to 2/645 (SH- P/L WBM Gr-I, G-II, G-III and premix carpet from Km. 0/00 to 2/00
CONSTRUCTION OF LINK ROAD SEUL KAHD TO PANCHYAT GHAR LANDIYARA ROAD KM 0.0 TO 1.800 SH C.O R.WALL AT RD 0.900 TO 0.915 AND CC PAVEMENT AT RD 0.900 TO 1.080 UNDER OTMNP
VKV.2024.318 C.O LINK ROAD FROM H.O KEHRA SINGH TO H.O SMT DARSHANA DEVI IN G.P BHANJAL UPPER SUB HEAD PAVER BLOCK AND U SHAPE DRAIN RD 0.0 TO 0.200 UNDER VKVNY MLALAD
C/o Link Road I T I Bagsaid and village Sharan km. 0/000 to 0/750 SH ROFD C D work C/o R/wall V-Shape Drain and M/T Deposit
Periodic Renewal on link road Didian to Gurala SH.-Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 0.0 to 1.0 VR002913101 Under State Head during the year 2020-21