Loading…
Loading…
10,878 results • Best match
Co Link road Ghartigaad to H.B Rajppuri km 0.00 to 1.00 SH ROFD in 5 7 mtr wide road at RD 0.330 TO 0.645 and bed cutting at RD 0.390 to 0.645
C/o Som Kunj Circuit House Building at Palampur Distt Kangra (HP) (SW - Providing laying soling and Wearing in link road NH-154 to Circuit House Km 0/00 to 0/480)
Restoration of rain damages of link road House of Sh. Nand Lal freedom Fighter km 0/00 to 2/250 SH C/o R/wall at RD 0/0.007 to 0/0.027
Construction of link road from Sainwala to Majri Pahaduwala Km. 0/0 to 1/300 (SH- Providing and laying WBM (Soling) grading-I in km 0/450 to 0/900) under DMFT.
C/o Link road from Dhanroti Nalla to Kehmli Bahlidhar Purag Road in K.M. 0/00 to 2/00, F/C in 5/7 mtr. at R.D. 0/315 to 0/375
Construction of link road from Sainwala to Majri Pahaduwala Km. 0/0 to 1/300 (SH- Providing and laying WBM (Soling) grading-I in km 0/900 to 1/300) under DMFT.
R/R of Damages on link Road from Jalath-I to Jalth-II in Km 0/00 to 0/900 Up-Upgradation/Improvement of ROFD in Km 0/675 to 0/825
C/O link road to Village Shilling in GP Moorang Km. 0/00 to 1/600 (SH C/O R/wall in R/R Masonry at RD. 0/885 to 0/895
Job 4 A-R and M.O link road from Jhalera bridge to Una via Lower Lalsingi at RD. 0-0 to 4-300 Sub Head P.L GSB, WMM, BC, Cat eyes etc
Restoration of rain damages on link road Kailu di Bar to Bharabar via Kailu di Bar km 000 to 500 SH Const of Retaining wall between km 0800 to 0940 Under PDNA2023
PERIODICAL RENEWAL FOR THE YEAR 2024-25 ON LINK ROAD NMT SH25 TO KUDH SUB HEAD P.L HOT APPLIED THERMOPLASTIC PAINT IN EDGELINE AND P.F REFLECTIVE GLOW STUDS 0.0 TO 1.680VR 0053
Repair and Restoration of Rain Damages link road Harijan Basti Dangoh Km 000 to 1100 SH CO 200 Mtr Span RCC slab culvert along with approaches at RD 0900 Under PDNA 2023
Construction of link road to Harizen Basti Diyal KM 0.0 to 0.800 SH PL WBM GII from RD 0.085 to 0.285 and Cement Concrete Pavement at RD 0.085 to 0.235 under SCSP
Job 9 Construction of Link Road from Kuthar Beet to Abadi Jodian Tehsil Haroli Distt. Una Sub Head P.L GSB, WMM and BC in km . 0-800 to 1-200 Under OTMNP
Construction of link road from Rajpur to Dighali Km 0/0 to 1/300 in Distt. Sirmour HP (SH- Construction of 2.0x2.0 mtr RCC Box cell type culvert at RD 0/890)
M/T works on link road from Matla to Khanota Km. 0/00 to 0/915. (SH- P/L tarring and PCC V-shape drain in Km. 0/00 to 0/915).
Construction of link road Nihog to Methli km 0/00 to 6/00 (SH C/O 900 MM Dia RCC Hume pipe culvert at RD. 2/015 and 2/555) Under MNP.
Repair and maintenance work on link road to village Maluwal from Una Jaijon road Km 0/0 to 6/670 SH P/L WMM, BC at RD 0/00 to 0/670
Construction of link road from Thandapani to Village Sarahan Km. 0/00 to 1/410. Under SCSP (SH- F/c 5/7 mtrs wide road in Km. 0/705 to 1/410).
Construction of Extension of existing 16.75 metre Span RCC T-Beam Bridge over Charatgarh Khad on link road Charatgarh Upperly from Una Ajouli Road, District Una at RD 3-035 UNDER SCCP
C/o link road Gallu to Khill Km 0/00 to 1/800 (PDNA) (SW - F/C, R/Wall, B/Wall, Culvert, U-shape drain, CC Pavement, Wire crates, MT Works etc)
C/O Link road from Village Sunnam to Baro Kanda Km. 0/00 to 14/250 (Portion 0/00 to 4/00) (SH- Formation cutting from Km. 0/210 to 0/585
Restoration on link road shai Da Ghat Km 0 00 to 7 780 SH CO B wall at Rd 1 210 to 1275 v shape drain km 0 00 to 2 00
Construction of link road from Moin Nallah to Boai Km. 0/00 to 4/420 under MMSY. (SH- Formation cutting 5/7 meters wide road in Km. 0/00 to 0/960).
Construction of link road from Rajpur to Dighali Km 0/0 to 1/300 in Distt. Sirmour HP (SH- Construction of 2.0x2.0 mtr RCC Box cell type culvert at RD 0/580).
CO link road from Bazigiran Mohalla to Harijan Basti upper Arniala via Dehsi Muhalla km.0.0 to 2.0(SH PF Breast wall and paver blocks at RD.0.580 to 0.780) Under OTMNP)
M/T on link road to village Chambak Km. 0/0 to 0/700 SH Providing and laying Premix Carpet with seal coat including correction layer Km. 0/00 to 0/600
Construction of link road from Thandapani to Village Sarahan Km. 0/00 to 1/410. Under SCSP (SH- F/c 5/7 mtrs wide road in Km. 0/705 to 1/410).
C/o link road Harnora Panchayat Ghar to Kasol Km. 0/0 to 7/050 (SH- Providing and laying interlocking concrete block pavement between Km. 6/200 to 7/050) Ambulance road.
CO and MT link road to Harijan Basti Repoh to Kuchha via Palahar km 000 to 3000 SH PL GSB Wet Mix Macadam and Tarring between km 000 to 1000 under SCCP
C/O link road Mamla to GPS Mamla km 0/0 to 2/00 (SH P/L 25mm thick MSS at RD 0/500 to 2/00) Under SCCP 2015-307-891).
Construction of link road Garari to Naichna km 0/00 to 6/00 (SH C/O 900 MM Dia RCC Hume pipe culvert at RD. 0/225 and 2/810) Under MNP.
Link road to Kheri Lanacheta road Village Pipli Km.0/0 to 4/510 (SH C/O 6.00 mtr. Span slab culvert at RD. 0/225) .Under Black Spot Identified by HRTC
Construction of link road Bujleta in Gram Panchayat Danoa in Distt Kangra (HP) MMSY Head (SH-Providing and laying Grading-III and cement concrete pavement in Km 0/040 to 0/170).
Construction of link road from Rajpur to Dighali Km 0/0 to 1/300 in Distt. Sirmour HP (SH- Construction of 2.0x2.0 mtr RCC Box cell type culvert at RD 0/890).
C/O link road Darodeviya to Khaldana in Km 0/0 to 1/565 (SH- C/O 900 mm dia Hume pipe culvert at RD 0/045, 0/150 , 0/390) MMGSY
R/R damages on link road Diggal Jaghed via Dal Chhamb road km 0/0 to 6/640 (SH C/O B/wall at RD 1/200 to 1/210) under PDNA
Construction of link road Jalot road to Dola Bhorna Bagru Upper Jamula in District Kangra (HP) (SH-Providing and laying wearing G-II, G-III in Km 0/000 to 0/500).
RR Damages on link road to village Pahar Km 0.0 to 1.500 SH CO BWall at RD 0.650 to 0.700,0.795 to 0.820 and Retaining wall at RD 0.800 to 0.820,0.700 to 0.735
R/R damages on link road from Paonta Sahib to Rampurghat road km. 0/0 to 5/0 (SH-Providing and laying Interlocked tiles 80mm.thick from RD. 2/275 to 3/315).
Construction of link road Tonda to Siun via Harijan Basti Kotla km 0/00 to 6/00 (SH 5/7 mtr. Formation cutting from km. 2/00 to 5/00) Under SCSP
Periodical renewal on link road Kishanura to Bainkkuan under Annual Maintenance Plan for the year 2020-21 (SH-Providing and laying 30mm. thick bituminous concrete in km. 1/0 to 1/400).
PERIODICAL RENEWAL FOR THE YEAR 2024-25 ON LINK ROAD ANDORA TO MUBARIKPUR SUB HAED P.L HOT APPLIED THERMOPLASTIC PAINT IN EDGE LINE AND P.F REFLECTIVE GLOW STUDS O.O TO 1.500 VR01018
Repair and Restoration of Rain Damages link road from NMT road to Kua Devi Mandir km 000 to 4000 SH Construction of Retaining wall between RD 2340 to 2365 Under PDNA 2023
C/O link road to village Gadol Anjii Km. 0/0 to 5/0 (SH C/O 5/7 mtr wide formation cutting in Km 0/810 to 1/0) Under MNP
A/R and M/O link road Shaheed pardeep Kumar marg Diggal to Pandel km 0/0 to 3/500 (SH Patch work in km 0/0 to 3/500) Under MMSRRY
Construction of Jeepable link road to Khangar Basti in Gram Panchayat Danoa in Distt Kangra (HP) MMSY Head (SH-Providing and laying cement concrete pavement in Km 0/000 to 0/170).
C/o Link road Shwal Nallah to Jharani (Koti Bani) in K.M. 0/00 to 0/747, F/C in 5/7 mtr. wide road at R.D. 0/180 to 0/747
Construction of link road from Kefanu to Tandio km. 0/0 to 4/0(SH-Construction of R/wall at RD 1/420 to 1/440 and 1/450 to 1/465)
Periodical renewal coat with 30mm Bituminous concrete with paver on link road Joh to Saloh Beri Harijan Basti km 2000 to 2200 and 2260 to 300 HP1204VR009252303 for the year 2022 2023