Loading…
Loading…
10,878 results • Best match
Construction of link road from Thandapani to Village Sarahan Km. 0/00 to 1/410. Under SCSP (SH- F/c 5/7 mtrs wide road in Km. 0/705 to 1/410).
Job 7 Periodical maintenance link road Jol Mohalla Panjawar VR-153 Sub Head Patch work, 30mm thick BC, Zebra Crossing and side lines km. 0-0 to 1-0 UNDER STATE HEAD
Construction of link road from Rajpur to Dighali Km 0/0 to 1/300 in Distt. Sirmour HP (SH- Construction of 2.0x2.0 mtr RCC Box cell type culvert at RD 0/830)
C/o Link road Bhateweri to Bhog km. 0/00 to 4/00 (SH - ROFD from km. 2/495 to 4/00 and C/O HPC at RD. 2/810) Under MNP
Construction of link road from Badsar to Ardi Km 0/00 to 4/00 (SH - Balance work for Providing laying GSB and G-II between Km 3/500 to 3/925 (MNP)
C O link road main road Sawar from main machotin Dhara road KM 0 00 to 0 200 SH F C 5 7 mtr wide road at Rd 0 00 0 165
C/o link road to the H/o Daya Ram, Ram Asra, Khushi Ram, Dharampal and others village Dhang, C/o R/wall near H/o Gurcharan Singh village Dhang GP DhangNihali.
RR Damage to link road Panmesri to Dunnna km 000 to 2500SH PL essential kharanja stone soling at Rd 0450 to 0950 and widening at Rd 0090 to 0180 0510 to 0540
Restoration and repair work of link road Jankour to Bhadouri upto Swan Nadi km.0.0 to 0.800 (SH C O Toe wall of causeway at RD.0.426 to 0.444.90 (under PDNA 2023)
R/R Damages on link road Galot to Randhala 0/00 to 2/880(SH C/O R/wall at RD 0/580 to 0/600)(Under PDNA)(log 31.210636 LAT 76.736148)
Construction of link road from Nanidhar to sakholi road km. 0/0 to 2/600(SH-Providing and laying solining 90mm to 45mm size G-let RD 0/0 to 2/600)
Restoration of Rain Damages on Link road to Village Gajwa km. 0/0 to 2/550(SH C/O PCC B/wall from RD. 0/725 to 0/755) Under PDNA -2023
C.O link road from Gurubale to Upper Kangos Km 0.00 to 0.800 SH- P.L Kharanja stone soling at RD 0.300 to 0.360 and C.C. Pavement at RD 0.300 to 0.375. Under MMGSY
Construction of link road Akbar ke Ghar se Isa Suleman ke Ghar tak in Mand Bahadpur Under MLALAD Deposit work SH Providing and laying cement concrete pavement at RD. 0.0 to 0.065.
C.O LINK ROAD LOHARA BASTI TO DURGA MATA MANDHIR ON SLAOH BERI ROAD KM 0.0 TO 1.350 SUB HEAD C.O U SHAPE DRAIN FROM KM 0.150 TO 0.280 AND CAUSEWAY UNDER MNP
Improvement of Link Road from Darkoti Road to Krarali Kiari HB 0/00 to 1/816 C/o B/wall at various damaged / sliding RDs between Km 0/200 to 1/800
Construction of link road to Baba Beli Ram Dera to Ward No.6 Lalsingi Una km.0.0 to 1.600 SH. C.O U.shape drain CC Pavement at RD. 0.850 to 0.930) (Deposit work)
Restoration of rain damages on Link Road Village Devna Thanga Km. 0/00 to 3/130(SH C/O PCC R/Wall from Rd 0/110 to 0/118 ) Under PDNA 2023
Improvement, C/o Passing places, CD works, GSB, WBM-II, Wet Mix, side drain, parapets, CC pavement and Tarring work under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-539.
SH C/O Cement concrete pavement
Regarding of approach road from at R.D. 7/255 to 7/480)
Widening of approach road to Hospital providing wall and foot path etc
Regarding of approach road from at R.D. 7/00 to 7/235
SH Construction of approach road SV and ACB Residence and Police Station
SH Construction of Stage approach road and retaining wall in college Ground
Repair of Approach road to STP/Divisional Store at Raghunath Ka Padhar
Retaining wall in approach road at RD. 0/003 to 0/035).
Construction of Approach road by laying 20 mm thick premix carpet surfacing
Construction of Building portion Ground floor, site development including approach road etc
C/O link road Bhatt Ki Hatti Durgapur Chayala Gurudwara in Km 0/00 to 2/600 (SH C/O 900mm dia RCC HPC at Rd. 0/200, 0/600, 0/750, 1/250, 1/400, 1/600,1/710 and 1/820, C/O PCC R/Wall at Rd. 0/00 to 0/030, P/L WBM Grading I and C/O unlined drain in
PERIODIC RENEWAL ON MALTI TO NIAR ROAD SUB EHAD PROVIDING AND LAYING 30MM THICK BITUMINOUS COCNERETE INKM 1/0 TO 1/700 VR09713102 UNDER PMGSY INCENTIVE OF 2019-20
Periodical maintenance for the year 2021-22 on Bari Padhru Tharku Pechha road Km. 0/0 to 3/500 under PMGSY incentives SH Providing and laying bitumenous concrete, including
Job 1 Periodical maintenance Panjawar Bathri road VR0 01 Sub Head Patch work, 30mm thick BC, Zebra crossing and side lines km.12-0 to 15-0 Under PMGSY
Annual Maintenance Plan for the year 2020-2021 (PMGSY) on Namhol to Bahderpur road km. 3/0 to 7/0 (SH- Providing and laying 30mm thick bituminous concrete (VR0047).
Periodical renewal maintenance of Baglehar Rajwati Malehani road in km 3/00 to 12/600 under proformance incentive PMGSY- 2024-25 (SH P/L Gr-III and Bitumenous concrete).
Periodical Maintenance on Jachh Lot road (L 051) (SH P/L 25mm thick Bituminious concrete in km. 0/00 to 6/390 i.e five year maintenance) Under PMGSY Incentive.
PERIODIC RENEWAL ON DEHRA GHATTI ROAD TO VILLAGE BARI SUB HEAD P.L 30MM THICK BITUMINOUS CONCRETE IN KM 1.0 TO 2.0 VR02313102 UNDER PMGSY DURING THE YEAR 2021-22
Periodical Maintenance on Lathiani Kodra Road VR Code HP1201VR000251101 SH PL 30mm thick Bituminious Concrete including profile correction in Km 0000 to 1000 and 3000 to 5000 Under PMGSY
Construction of Dalli to Sanh road Km. 0/000 to 5/190(Package No. HP-02-331) Under PMGSY (World Bank RRP Batch-II, 2018-19) in Distt. Chamba
PERIODIC RENEWAL ON CHALALI TO SUKHAR ROAD SUB HEAD PROVIDING AND LAYING 30MM THICK BITUMINOUS CONCRETE IN KM 0.0 TO 2.200 VR082213401 402.403 UNDER PMGSY INCENTIVE OF 2019-20
Construction of Mangla Ohli Badrin Kopara Jareen Km 0/000 to 2/370 (Package No HP-02-30) under PMGSY-IV (Batch-I, 2025-26) in Distt Chamba (H.P.)
PERIODIC RENEWAL ON KAROA KALOAN TO MAWA KUDLI PORTION 0.0 TO 2.00 PMGSY ROAD SH P.L 30MM THICK BITUMINOUS CONCRETE IN KM 0.0 MTO 2.0 UNDER AMP 2023-24
PERIODIC RENEWAL ON CHINTPURNI PHULWARA ROAD (PORTION O.0OT O 2.500 SUB HEAD PROVIDING AND LAYING 30MM THICK BITUMINOUS CONCRETE IN KM 1.500 TO 2.500 VR003213404 VR003214403 UNDER PMGSY
(SH- P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 0/00 to 0/600)
Providing and laying 30mm single layer bituminous concrete (HP0404VR006915203) in km. 0/0 to 1/0
Providing and laying 30mm single layer bituminous concrete (HP0404VR06415203) in km. 2/0 to 3/0
SH- Providing and laying 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 0/00 to 1/00)
Providing and laying 30mm single layer bituminous concrete (HP0404VR05615303) in km. 2/0 to 3/0 and 3/0 to 4/0
Providing and laying 30mm single layer bituminous concrete (HP0404VR02316118) in km.0/0 to 1/0