Loading…
Loading…
10,878 results • Best match
(SH-ROFD, Protection of work, cross drainage work, metalling and tarring, paver Block, V-shape drain, parapets, crash barrier, road safety, kilometer Stone and dumping site RD 0/0 to 5/0) under PMGSY
C/O link road from Kimmughat to Sai Mandir near Mohan Meiken Factory in Km. 0/00 to 0/550.(SH C O Hume Pipe Culvert at Rds 0075and PL Interlocking Tiles Pavement at Rds 000 to 0300 and CO V Shape drain in Km 00 to 0550 and RWall at Rd
(i) on link road to village Reeh in Km. 0/0 to 1/0 (VR-037) (ii) NH-21 to village Bhuwai road in Km. 0/0 to 1/0 (VR-0195) (iii) NH-21 to village Dabeta road Km. 0/0 to 0/510 (VR-0196) (SH- Providing and laying 30mm thick bituminous concrete).
Special repair of road s and Providing and laying Paver blocks from Sharma house to house of Sethi and Ahuja house to Upender house ward no.9
R R Damages on Kalka Shimla Wangtoo road NH 05 k.m. 153.180 to 236.000 SH Repair of road surface at various R D. between 165.000 to 165.500
Repair of road berms, provision of retaining wall to prevent erosion of soil and related miscellaneous civil works near Gorkha Gate at IIAS, R.P. Niwas Shimla (H.P.)
C/O 180.20 mtr. Double lane bridge over Sirsa Nadi on link road from Harraipur to Chunri (SH C/O Sub structure, super structure and protection work) Under RIDF XXVIII,). 2nd call
C.O LINK ROAD FROM CHAPLAH TO SHAH BASTI GP CHPALHA SUB HEAD P.L GSB M.T IN KM 0.0 TO 0.225 0.455 TO 03.825 AND C.O R.WALL AT RD 1..145 TO 1.157
C O Ambulance road from main road Sammu Taal towards link road Malian GP Bhoranj Zila Parishad SH P L interlocking paverblock at RD 0 00 to 0 120 DC Deposit work
Construction of link road Tonda to Siun via Harijan Basti Kotla km. 0/00 to 6/00 (SH 5/7 mtr formation cutting from km. 0/300 to 2/00)Under SCSP
Co link road from Khurwain Ambehra Dheeraj Road towards Village Sakhon via Laliya Da wara SH Formation cutting in Km 0150 to 0225 CO 6 mtr span culvert at in Km 0310
Co link road Harijan Basti Bhanjal Km 0000 to 4000 SH Providing and Laying GSB WMM and Tarring between Km 2165 to 2465 and 2476 to 2676 including earthen shoulders against MNP
Job 3 Construction of link road Petrol Pump Bhadsali to Una Hoshiarpur to Pandoga to Har Saina Abadi Sub Head C.O Cement Concrete Causeway RD.1-150 to 1-220 Under OTMNP
Job 10 Restoration of rain damages on link road to Khatrian Mohalla Village Saloh Sub Head C.o 9mtr. Span RCC Slab Culvert including Dismantling, Retaining wall at RD 0-950 DC Deposit
C.O link road from Bazigiran Mohalla to Harijan Basti upper Arniala via Dehsi Muhalla km.0.0 to 2.0(SH P.F Breast wall and paver blocks at RD.0.580 to 0.780) Under OTMNP)
Link road from IPH Colony to Khilroo Bindraban connecting Jamwal Colony Katoch Awadi CVD Khalet at Lekh Raj house KM 0/00 to 4/00 (SW- C/o Abutment for Balley Bridge)
C o link road to village Dyarmoli km 0 00 to 1 500 SH C o 900mm dia HPc at RD 0 585 and R wall at Rd0 880 to 0 891
C o Link road to village road via Bangla km 0 00 to 0 840 SH C o R wall in R R Masonery at Rd 0 00 to 0 027 60
Restoration rain damages on Link road to village Thanadhar Km 0/0 to 5/205 (SH Construction of PCC B/wall between km 1/190 to 1/250). Under blance amount PDNA .
Repair and Restoration of Rain Damages link road NMT SH25 to Kadh Km 000 to 1680 SH PL 80mm thick Interlocking Concrete Paver Block between RD 1110 to 1430 Under PDNA 2023
Const of link road to village Dhussara Deom km 000 to 3485 SH Const of embankment at RD 000 to 100 and protection wall at various RDs between km 000 to 1000
C/O Link road from Solan Meenus road to GSSS Ghandoori km. 0/00 to 1/200 (SH - C/O RCC R/Wall at RD. 0/225 to 0/240) Under SCSP
Repair and Restoration of Rain Damages Link Road Chintpurni Amlehar Road via Dhalwari Km 8500 to 12000 SH Providing and laying 80mm thick Paver Block RD 8500 to 9000 Under PDNA 2023
C/O link road Salgran to Dhaar Km. 0/0 to 0/700. SH C/O Crated R/wall at RD 0/465 to 0/555 and 0/575 to 0/617.50.
C/o Link road Lehri Palsed Kala Kund in G.P. Lehri Km. 0/0 to 4/945 (SH- Providing and laying soiling, wearing and Tarring in Km. 2/0 to 4/0)
Job 1 Construction of link road Rampur to Boundary wall of KVK Centre Sub Head GSB, CC Pavement and 80mm thick paver Block at RD 0-0 to 0-400 UNDER OTMNP
Construction of link road Bias Irrigation Canal to Bias Bhood km. 0/0 to 1/600(SH-C/O 900mm.dia hume pipe culvert in double lane at RD.0/390) Under MMGSY.
Construction of link road from Kandi Rihri Luhna har road Km 0/000 to 7/000 in Distt Kangra (HP) (SH-Construction of retaining wall in KM 1/910 to 1/918).
A/R and M/O link road from Reckong Peo to Roghi Km. 0/00 to 14/00 (SH-Repair of pot holes from Km. 4/040 to 7/00) (Under MMSRRY
A/R and M/O link road from Reckong Peo to Roghi Km. 0/00 to 14/00 (SH-Repair of pot holes from Km. 0/00 to 4/040) (Under MMSRRY
Construction of link road from Rajpur to Dighali Km 0/0 to 1/300 in Distt. Sirmour HP (SH- Construction of 2.0x2.0 mtr RCC Box cell type culvert at RD 0/830)
C/o link road Panjpiri to Matnoh (Old Swarghat Zakatkhana road) Km. 0/0 to 1/0 (SH- ROFD, Retaining wall, C/o 900mm dia R.C.C. hume pipe culvert at various RDs).
Co MT link road from Harizan Basti Barnoh to GSSS Dangoli via Abadi RajputtanJattan and Mohalla Souran SH Co 22.20 mtr Span RCC Box cell bridge at RD 5220 under NABARD RIDFXXIII
R.R Damages Link road from Kuppa to Palika Sairo Km 0.00 to 5.00. Sub Head- C.o B.Wall cum Protection Wall at RD 1.495 to 1.550, 1.600 to 1.630 and 1.650 to 1.680.
R/R of damages on link road Nand to Katli road km 0/0 to 3/00 (SH C/O R/wall and U shape at RD 2/540 to 2/640).
Construction of link road from Thandapani to Village Sarahan Km. 0/00 to 1/410. Under SCSP (SH- F/c 5/7 mtrs wide road in Km. 0/705 to 1/410).
C/o Link road Kufta Shankan Kali to Kuffer Km 0/00 to 1/00 C/o, F/C in 5/7 mtr. wide road in K.M. 0/555 to 1/000
Job 12 Construction of link road from Una- Nangal Road to Pirnigah road km. 0-0 to 0-570 Sub Head C.C. Pavement at RD 0-0 to 0-120 Under MMSY
R R Damages to link road village Jiskoon km 0 0 to 8 00 SH Removal of slips by JCB and dressing of road shoulder surface Drain clearence under Kawar sub Divison
Construction of link road from Sainwala to Majri Pahaduwala Km. 0/0 to 1/300 (SH- Providing and laying WBM (Soling) grading- I in km 0/0 to 0/450) under DMFT.
Restoration of rain damages to link road Una Ajouli to Charatgarh Upperli km. 0.0 to 3.810 SH C.O V-shape drain with edge wall at RD.0.700 to 0.775) (Under OFC deposit)
Job 1 Construction of link road Mohalla Rajputan to Lawana Majra at village Ispur Distt.Una Sub Head C/O C.C Pavement in km. 0-00 to 0-300 Length 300mtr. Under OTMNP
A/R and M/O to link road Surajpur Kiyarda via Santoshgarh road km. 0/0 to 5/600 (SH-C/O 4.00 mtrs. Span R.C.C. slab culvert at RD. 2/270).
Construction of link road from Rajpur to Dighali Km 0/0 to 1/300 in Distt. Sirmour HP (SH- Construction of 2.0x2.0 mtr RCC Box cell type culvert at RD 0/580)
C/O Link road from Village Sangna to GSSS Sangna Sathan Km. 0/00 to 4/00 (SH - C/O 5/7mtr. Wide formation cutting at RD.1/909 to 3/00
Construction of link road Pidiyadhar to Khalog Devta Mandir road km 0/00 to 1/765 (SH C/O 900 MM Dia RCC Hume pipe culvert at RD. 0/930) Under MNP.
C/O Link road Kothi to village Jaganji G.P Naina Tikker Distt. Sirmour H.P Km. 0/0 to 2/0 (SH Formation cutting in Km.0/0 to 0/500). Under SCSP.
Construction of link road from Davkhan Mod to Khwander Bhathan Bhajond km 0/00 to 6/00 (SH P/L WBM G-I from Km. 0/00 to 1/00 ). Under SCSP
Const of MT on link road Bagroo to Agriculture University Chack Km 000 to 2330 SH Const of sub grade Providing and lying GSB and MT Km 000 to 0500 under MNP
C o Link road road Chichwari Manjwani to Jatwari km 0 00 to 2 00 SH C o B wall in PCC 1 4 8 at Rd 0 700 to 0 762