Loading…
Loading…
10,878 results • Best match
Const of link road from Ghanari Banehra to village Latara Deoli upto Kuneran Upper Km 000 to 2500 SH providing and laying GSB WMM and Tarring between Km 000 to 1000
R/R damages on link road Bhini Johari to Kharpana km 0/0 to 7/00 (SH C/O 900mm dia NP-2 HPC at RD 3/480 and 4/00).
Restoration of rain damages on Link road from Village Khalla Kiar Koti Dhiman to Village Kiarta Piplity Km.0/00 to 5/645(SH Hiring of JCB for removal of slips)
Construction of link road from village Shakol to Bagula km 0/0 to 1/240 (SH C/O balance formation cutting in Km. 0/0 to 1/240 left out quantity).
C O link road from Darsari Balasan Calasar to Jharag Kenchi Rd 0 00 to 5 00 SH F C 5 7 mtr wide at RD 2 00 to 3 060
C/O link road to Dr. Y.S Parmar Birth Place Km 0/0 to 0/560 (SH Metaling and tarring C/O Unlined drain in Km 0/0 to 0/560)
RR Damages on RCD road KM 000 to 92695 SH Hiring of JCB removal of slips drain dressing of road surface on RCD Road and various link road under Kawar SubDivision
C/o Link road Reoghati Road to Jamuni Serti in K.M. 0/00 to 1/600, F/C in 5/7 mtr. wide road in K.M. 0/00 to 0/225
Construction of link road to village Chatroh Km 0/000 to 1/000 in Distt Kangra (HP) (SH-Providing and laying cement concrete pavement in Km 0/640 to 0/800).
Repair and Restoration of Rain Damages Link road NH70 to Thaplan in GP Thaplan Km 000 to 8300 SH Construction of Retaining wall between RD 8170 to 8180 Under PDNA 2023
A/R and M/O on link road Rawkhan to Katlu km 0/0 to 1/00 (SH P/L Patch work in km 0/0 to 1/00) Under MMSRRY
Const of link road Fatehpur to Jawal via Behmba km 000 to 7000 SH Const of 2mtr span RCC slab culvert at RD 5583 and 5690 aw wing walls under MNP
C/o Slab culvert near Rotanwala bridge to house of Nghau Ram, Harijan Basti vill Barotwala and Durga mata mandir road. Protection work on link road harijan basti Manpura GP Manpura.
Construction of link road Barana Mariyari Chowki Nehar Palachaklu road Km 0/000 to 8/300 in Distt Kangra (HP) (SH-Balance work of 12.00 mtrs span Bridge over Nehar Khad).
RR Damage on Thana to Mandal link road Km 0.0 to 1.65 SH CO Both side wing wall at RD 0.515 and Thana side wing wall at HPC at RD 1.520
Improvement of link road to village Mellan Km 0/000 to 1/800 SH Construction of PCC Retaining wall at RD1/465 to 1/478 and 1/620 to 1/630
R/R Damages on Allowang Link road in K.M. 0/00 to 2/225, C/o, B/Wall at various damaged / sliding RDs between in K.M. 1/00 to 2/00
C/o Link road from Santiban to Goyal road in K.M. 0/00 to 1/093, F/C in 5/7 mtr. wide road in K.M. 0/00 to 0/210
Restoration of rain damages on link road to village Upper Arniala via Bazigar Mohalla Tehsil and Distt.Una (SH PF CC interlocking paver block at RD.1.100 to 1.775)(under PDNA Deposit)
Construction of link road to Kutla Basti Takrehra SH Construction of Hume pipe culvert at RD 0/565 and R/wall at RD 0/731.80 to 0/750 Under SDRF/NDRF
Repair and maintenance work on link road Mohalla Khutta to Sant Danguwale Km 0/00 to 1/300 SH P/L GSB,WMM,BC at RD 0/750 to 1/300
M/T on link road to village Jamana km. 0/0 to 2/0(Sh-Providing and laying metalling and tarring with seal surfacing in km. 0/0 to 1/950)
C o Link road Shagligad to Dunna to Bhumper road km 0 00 to 2 495 SH F C 5 7 mtr wide road at Rd 2 255 to 2 495
A/R and M/O on link road to village Shashur Gompa Km. 0/00 to 6/500.(SH- Patch work at various RD in Km. 2/00 to 3/00)
R R Damages on Link road to dhamrali km 0 00 to 0 600 SH C O R wall at Rd 0 090 to 0 105 0 410 to 0 440
C/o link road Dodhamb to Laleta Km 0/00 to 1/500 (SH- C/o Approaches R/Wall Laleta side from RD 0/365 to 0/387 (RHS and LHS)
Restoration of Rain Damages on link road to village Kajwa km 0/00 to 2/165 (SH C/O R/Wall from km. 1/988 to 2/010 )Under PDNA 2023
C/O Link Road from Primary School to upper Kuru Km. 0/0 to 1/200 (SH P/L Interlocking paver blocks between RD 0/200 to 0/330) under OTMNP.
Restoration of rain damages of link road from Sandyana Tabba to Basdehra km.0.0 to 1.500(SH C O R wall LHS at RD.1.015 to 1.038) (Under NDRF or SDRF)
R R Damage to link road pujarli Manidhar km 0 00 to 4 00 SH C o R wall at Rd 1 615 to 1 638 1 235 to 1 255
Construction of link road to village Dadwal Km. 0/0 to 1/300 (SH- Providing and laying M/T, Road side drain and parapets in Km. 0/0 to 1/150).
Restoration of rain damage to link road from Mehatpur to Bangarh via Bhabour sahib km.0.0 to 3.0 (SH CO 1800mm dia hume pipe culvert at RD.1.525 (Under BPCL deposit)
C O Link road to HB Karalta to Ghali dharikuper km 0 00 to 2 200 sH F C 5 7 mtr wide road at Rd 0 00 to 1 00
Restoration of Rain Damages on link road to village Satahan km. 0/00 to 4/190 (SH C/O B/Wall from km. 0/190 to 0/206 ) Under PDNA 2023
C/O link road to Village Mianpur Goela Jai wala km 0/0 to 3/100 (SH P/L Gr-II, Gr-III, BT in km 1/00 to 2/00
Construction of link road to Lower Dakhyut from Dangar Chokhna road G.P. Dangar SH Providing and laying 30 MM thick B.C. and Cement concrete pavement at various damage reaches Under MMSY
Construction of link road to village Karangui Bum km 0/00 to 0/500 SH Providing and laying of Cement Concrete Pavement at RD 0/050 to 0/342.50 MMSY work
Construction of link road Chimba Basti G.P. Seu SH Providing and laying cement concrete pavement at RD 0/00 to 0/100 AND 0/240 to 0/400 Under SDRF/NDRF
Construction of link road Village Kothi in G.P. Kothi SH Formation cuting at RD 0/330 and Construction of R.C.C Slab culvert 3.00 mtr span at Rd 0/340 Under MMSY
Construction of link road Lehri Sarail towards Govt. Primary School Lehri Sarail via Patwar Khana SH Providing and laying Cement concrete pavement at RD 0/00 to 0/234 Under MMSY
Construction of Link road from Gangtoli to Kunhat Km 0/0 to 5/00(SH- Construction of cross drainage works, Construction of retaining structure from Km 0/0 to 3/500
ROFD, M/T, Missing R/Walls, B/Walls, Crash Barriers, Sign Board, Missing CD Works and five year maintenance under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-501.
Job 4 Restoration of Rain damages of internal road Green Evenue Colony Rakkar, Tehsil and Distt. Una HP Sub Head P.L 30mm thick BC in km 0-0 to 0-500 G.P. Jalgran Deposit work
A.R and M.O on NH.305 Sainj Luhri Aut Road Km 0.00 to 97.00 .SH. Construction of Edge wall in PCC for Approach Road and Construction of PCC Dirt wall on Both ends of Manglour Bridge at RD 79.875 under NH Sub Division Banjar.
Annual Maintenance on various roads under Shimla Sub Division No.VII Shimla-3. (SH- Providing renewal coat with30mm thick bituminous concrete on road from block 37 to block 28 Rd 0-00 to 0-0.45 approach road from Ramleela stage to block-6, approach r
Restoration/ protection of Bailey bridge of Ganvi-I Power House approach road left bank of Ganvi Khad upstream of Bailey Bridge RD 0.00m to 20.00m damaged due to heavy flood in Ganvi Khad on intervening night of 31/07/2024 and 01/08/2024.
Improvement of curves, passing places, missing cross drainage work, PCC drain, PCC pavement interlocking paver block and tarring work
P/L 30mm Bituminous Concrete, Thermoplastic Paint strip in km 0/0 to 0/620
Providing and laying Tack Coat, Bituminous Concrete 30mm thick, Repair of Pot Holes
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Dumping Site and Tarring work etc