Loading…
Loading…
10,878 results • Best match
Restoration of rain damages on link road Badmana Harijan Basti km 000 to 21500 SH CO Retaining wall at RD 0490 to 0527 RHS and 1165 to 1187 LHS under SCCP
Construction of link road from Old Hoshiarpur road new bridge between Una to Haroli km.0.0 to 1.900(SH PL CC Pavement and GSB at RD.0.0 to 0.500) Under OTMNP
REPAIR AND RESTORATION OF RAIN DAMAGESX ON LINK ROAD TO SAGHNAI KALA PANGA KM 0.0 TO 6.260 SUB HEAD C.O PAVER BLOCK AND VA SHAPE DRAIN FROM RD 1.900 TO 2.100
C/o Link Road Raj Darbar to Kharapather via Balog Mohal in Km 0/00 to 1/680 5/7 mtr Wide Formation Cutting between Km 0/280 to 0/650
C/o Link road Allowang Nallah to Chamera Nallah in K.M. 0/00 to 1/00 , F/C in 5/7 mtr. wide road at R.D. 0/00 to 0/250
C.O LINK ROAD FROM WATER TANK ROAD IN KM 0. TO 3.180 SH PROVIDING AND LAYING GRANULAR SUB BASE G-11 CEMENT CONCRETE PAVEMENT AT RD 0.300 TO 0.540 UNDER MMGSY
A/R and M/O to Lower Andora Km. 0/0 to 4/0 and Link road Karluhi to Athwan Km. 0/0 to 4/600 (SH. Repair of Pot Holes)
Construction of link road from Panjsei to Seri road SH C/O RCC slab culvert of 4.00 mtr span at RD 0/760 and 6.00 mtr span at RD 0/925
C.o link road to Village Gharshu Km 0.00 to 3.500 SH- C.o B.wall at RD 3.130 to 3.142.50 and C.O R.wall in wire crate at RD 3.165 to 3.180 under MMGSY
Construction of link road from Nanidhar to sakholi road km. 0/0 to 2/600(SH-Providing and laying inter locking concrete blick pavement in km. 0/390 to 0/690)
R/R Damages on link road Galot to Randhala 0/00 to 2/880(SHC/O R/wall at Rd 2/360 to 2/380)(Under PDNA)(Log 31.211236 LAT 76.751106)
Const of and MT link road Harijan Basti Dandri to Kabirpanthian Govt High School Takarla km 000 to3000 SH PL GSB, WMM and Tarring between km 1750 to 2250 under SCCP
Const of link road from Amb Saloi road to village Mansoh Tikkri Mohalla Pangian km 000 to 2640 SH Const of Retaining wall at RD 1780 to 1805 LHS Under MNP
Co link road Samnoli to Vill Nichla Swana Km 00 to 20 SH PL GSB GII GIII and Premix carpet with seal coat in Km. 1 030 to 1 315under SCDP
CO link road from LR to Mohalla Gujaran 1 ward No 5 Village Kuthera Jaswalan SH Co 1000 mtr Span RCC slab culvert ic both side approaches Under MMSY 2025 26
Construction of link road from Fatehpur to Jawal via Behmba km 000 to 7000 SH Construction of 900mm dia RCC Hume pipe culverts at RD 4685 4580 and 5120 under MNP
Periodical maintenance link road Rakkar to Basoli km.0.0 to 1.0(HP1205VR0140) (SH P L 30 mm thick BC with waste plastic additive Sides line and cat eyes) under State Head
Construction of link road from Bohta to Palkani road km 0/000 to 5/200 under SCSP SH Formation cutting 5/7 mtr width in km 0/000 to 1/000
C 0 link road Godi Gohir to shetru gaan thach km 0 00 to 1 360 SH F C 5 7 mtr wide road at RD 0 00 to 1 360
C/O link road to village Pipli Road km. 0/00 to 4/510 (Sh - C/O RCC 4.00 MTR SPAN SLAB CULVERT AT RD. 1/010 ) Under Head Black Spot
SDP/2024/1035 Construction of link road to house of Sh. Malkeet S/o Sh. Hoshiar Singh others village Chamnal Ward No 4 (SH C/o R/wall at various RDs)
Construction of link road from village Lalsingi to Jhalera near brick kiln via Baba Beli Ram (Old Leg) (SH Providing and laying bituminous concrete at RD 0.0 to 0.500) Under OTMNP
CONSTRUCTION OF LINK ROAD FROM AWANI KHAD TO KAYARA MAIN ROAD VIA GURDWARA KM 0.0 TO 1.200 SUB HEAD P.L CEMENT COCNRETE PAVEMENT IN KM 0.0 TO 0.285 UNDER INDUSTRAIL CORRIDOR
C/O link road to Village Upper Kuffa km 0/0 to 0/900 Formation cutting 2.75/5.00 Mtrs. wide with road side protection work km 0/0 to 0/900
R/R damages on link road Galot to Randhala 0/0 to 2/880 (SH C/O R/wall at RD 1/880 to 1/910) Under PDNA( Log76.7446985 LAT 31.2112
Const of link road to Harijan Basti Naiyan from Bhaloun Sohari Chouli road km 000 to 1000 SH Providing and laying GSB and MT in km 0535 to 1000 under SCCP
Restoration of rain damages on link road to village Buai road Km. 0/00 to 8/325 SH- Construction of 6.00 mtr. span slab culvert at RD 2/800 ). Under PDNA.
Periodical renewal coat with 30mm Bituminous concrete with paver on link road Ambota Bus stand to Jindbar to Nag Nath Mandir km 0210 to 2005 HP1204VR011152301 for the year 2020 23.
C/o link road from Bhaba Mode to 1892 (Kandhar) Km 0/00 to 2/165 (Sub head- C/o R/wall at RD 0/780 to 0/790) Under TASP
Construction of Link road to village Naliya Dando km 0/0 to 1/500 (SH- FC of 5/7 Mtr wide road in km 0/985 to 1/255). Under MMGSY
C/O link road Joghon to Baruna km 0/0 to 5/00 (SH P/L GSB and Interlocking tile 80mm thick at Km 0/0 to 0/400) Under MMSY
C.O LINK ROAD FROM SAMNOLI TO NICHLA SWANA ROAD KM 0.0 TO 2.0 SH P.L GSB G-II GSBIII AND 30MM THICK BITUMINOUS CONCRETE IN KM 0.500 TO 1.0 UNDER SCDP
C/O link road to Panchayat Head quarter Spillow from 2nd Curve of Labrang road Km. 0/00 to 1/480 (SH- Formation cutting from Km. 0/430 to 0/735)
C/O link road from Garari to Naichana Road km. 0/00 to 6/00 (SH - 5/7 mtr wide formation cutting in km. 3/888 to 5/000) Under BASP
C.O and M.T link road DDM School to Parmar School in G.P. Kalish Nagar from Km 0.000 to 3.000 SH Construction of Retaining wall from RD 1.015 to 1.055 Under MNP
Construction of Link road to Lohara Ward No 5 GP Baliana Km 00 to 1 0 SH ROFD by Co R/wall from RD 00 50 to 0 300) under OTMNP
C/o link road from Banlighatti Bairghat Pajineena Kuffer road km 0/000 to 5/000( P/L WBM G-III and tarring work in km 1/000 to 2/500)
Providing Metalling and Tarring Works to Thana to Mandal link road Km 0.0 to 1.765 (SH P L GSB Wearing coat G 2 and Tarring work in Km 1.180 to 1.765
Job 6 Construction of link road from Gondpur Baliwal road Sub Head P.L 60mm thick paver block on Pubowal Girgira via Abadi Jattan RD 0-0 to 0-220 Under OTMNP
Repair and Restoration of Rain Damages Link road NH70 to Thaplan in GP Thaplan Km 000 to 8300 SH Construction of Retaining wall between RD 7400 to 7425 Under PDNA 2023
C.O link road from Masroor Temple to Othra GP Masroor Km. 0.00 to 1.00 SH Formation Cutting at Rd. 0.00 to 1.00 and Hume Pipe Culvert and wire crate walls. MMSGY
Construction of link road from Chaplah to Shah Basti GP Chaplah Development Block Pragpur, District Kangra (HP) (Sub Head. Construction of 4.00 mtr. span RCC slab culvert at RD 0/185)
Job 7 Periodical maintenance on link road to village Ispur km. 1-00 to 3-660 Sub Head Patch work , 30 mm thick BC and zebra crossing VR047 under State Head
C/o link Road Kupri Bus Stand Kharot Pump House Km 0/00 to 1/810 F/C in 5/7 mtr wide road at RD 1/150 to 1/810
AR and MO on Link Road to Sada Shiv Temple Km 000 to 2100 SH Providing and laying 25mm thick Bituminous concrete with Paver in Km 000 to 1750 Against AMP
Improvement of Link road to Lohat Road in K.M. 0/00 to 1/00, C/o, B/Wall at various damaged sliding RDs between in K.M. 0/00 to 0/700
SDF2024602 RO Repair and Restoration of Rain Damages link road to village Chalet Km 000 to 6030 SH Construction of Retaining wall in GP Chalet Km 2500 to 2530 Under SDRF
C/O link road from Thatch Chambi Soldha km 0/00 to 1/500 (SH-C/O 900 mm dia hume pipe culvert at RD 0/140, 0/300 and0/750)
Construction of link road from Bhojupani to Lambidhungri road km 0/000 to 6/060 under SCSP SH- Formation cutting 5/7 mtr width in km 0/000 to 0/930
Construction of link road Saloh Beri to Durga Mata Mandir km 000 to 1800 SH Construction of 900mm dia RCC Hume pipe culvert with wing walls at RD 1400 against deposit