Loading…
Loading…
10,878 results • Best match
Co Link road Mathala to Thali pannu km 000 to 100SH FC 57 mtr wide road at Rd 000 to 0180 BWall in wire crate at Rd 000 to 0015Deposit Work
R/R damages on link road from Lower Nalda to Upper Nalda Km. 0/0 to 1/500(SH- C/o Crated R/wall at Rd. 0/600 to 0/620)
Restoration of rain damages on link road to village Fatehpur km.0.0 to 1.200(SH C O retaining wall at km.0.988 to 1.006 and 1.044 to 1.076)(Under BPCL deposit)
A/R and M/O on link road kattal to Dharmana km 0/0 to 2/800 (SH P/L Patch work in km 0/0 to 2/800) Under MMSRRY).
Improvement of Ratnari Link road upto Dunidhar Road in K.M. 0/00 to 2/735, C/o R/Wall in PCC and wire crate at R.D. 2/720 to 2/735
Construction of link road Harijan Basti Bhaira to Harijan Basti Saluri km 0000 to1800 SH CO Retaining wall in km 0540 to 0580 RHS and 0720 to 0740 LHS under SCCP
C.o link road from Kuppa to Palika Sario Km 0.00 to 5.00 SH-F.C 3.5 mtr wide road at RD1.435 to 1.690 and C.o R.wall wall at RD 1.445 to 1.465
Repair and Restoration of Rain Damages link road NH70 to Thaplan in GP Thaplan Km 0000 to 8300 SH Construction of Retaining Wall between RD 8240 to 8260 Under PDNA 2023
C/O M/able link road from Udeen Nallah to Village Udeen km 0/0 to 2/870. Formation cutting 5/7 Mtrs. wide at RD 0/740 to 2/870
Construction of RCC Solid Slab Bridge 44 450 Meter total span over Sathothar Khad on link road Sathothar to Dhussara at RD 0460 SH CO Sub structure superstructure approaches Under SCCP
Construction of link road HSC to Nanku Ram House and Others Band Vihar KM 0/00 to 0/150 (SH - Providing laying G-II, G-III and Cement Concrete road (MMGSY)
Construction of link road from Baginallh to Nagadi km 0/00 to 1/450 under SCSP Sub Head- Formation cutting 5/7 mtr wide in km 0/00 to 0/440
Construction of link road from Bada Naun to Chhota Naun in Distt. Kangra (H.P.) (sh-Providing and laying bituminous concrete pavement in Km 1/500 to 2/000 (Under SCSP Head)
Periodical Renewal coat with 25 mm thick bituminous concrete with paver on Link road Aloh Lohara road Km 3000 to 4500 with plastic waste HP1202 VR 0092 for the year 202425
Improvement of black spot on link road from NH-22 to Ropa Khas Km. 0/00 to 15/850 (SH- P/F W-metal Beam Crash barrier at various essential reaches
Periodical renewal coat with 30mm Bituminous concrete with paver on link road Diara to Lower Hamboli km 000 to 1000 and 280 to 2750 HP1202 VR012652101 for the year 2022 23
CO link road Harwani to Rajghad km 00 to 300 SH FC 57 of road at RD 00 to 1000 and Kharnja stone soling at RD 000 to 1000 DC Deposit
RR Damages to RCD Road km 000 to 92695 SH Hiring of Tipper for carriage of muck stone gravel material in jiskoon road other various link road in kawar sub division
RR Damages to RCD Road km 000 to 92695 SH Removal of slips by JCB and dressing of road surface Surface drain clearance in various link road under Kawar Sub Division
Improvement of link road to Shanad Km 0/000 to 1/500 SH Construction of PCC Retaining Wall at Rd 0/169.50 to 0/179 and 0/770.50 to 0/780
Construction of Link road to Village Kharsi in G.P. Gharot km.0/0 to 2/700 (SH-C/o 6.00 mtr. Span R.C.C. Slab Culvert at km.1/500(Under SCSP)
RR Damage to RCD km 000 to 92695SH Hiring of tipper for carriage of muck stone in km 71 750 to 92695 and other various link road in kawar Sub Division
CO Link road from Sainj to Chudol Korai 0.0 to 2.0 SH CO Breast wall at RD 0.405 to 0.445 and Retaining wall in wire crate at RD 0.410 to 0.430
Special repair to industrial area link road Km. 0/00 to 0/340 (SH-P/L soling and cement concrete pavement and back filling from Km 0/030 to 0/150)
Construction of link road to village Naura Including bridge over Baner to Join Thanpuri Km 0/000 to 1/870 in Distt Kangra (HP) (SH-Balance work of Jassour side abutment).
Construction of link road from Deorikhad to Burjikhad Km. 0/00 to 2/500 under MMGSY. (SH- Formation cutting 5/7 mtrs wide road in Km. 0/175 to 2/130).
Widening and strengthening of link road Subowana via Baliwal Km 0/0 to 10/370 SH Preparation of detailed project report, Falling weight deflectormetre, Axle load and ATCC CBR value test
C/O link road from Powari to Kangarang km. 0/00 to 3/600 (SH- F/C with wire crate R/wall at Rd. 0/850 to 1/00) Under Deposit
CO and MT of link road DSP Mohalla Kuthera Kherla km 000 to 1500 in GP Kuthera Kherla SH CO 10 meter span RCC slab culvert at RD 0300 under MNP
A/R nd M/O link road from NH-03(Jia) to Shankergarh km 0/00 to 1/00 (SH-Construction of Retaining wall between RD 0/155 to 0/175
C/o Link road from Salyana to Jalakha road in K.M. 0/00 to 1/00, F/C in 5/7 mtr. wide road in K.M. 0/00 to 0/105
Construction of link road to village Manjher Km. 0/0 to 0/765 (SH- C/o Formation cutting, Retaining wall and cross drainage work in Km. 0/0 to 0/765)
R R Damage on link road to Sheel Saungi road via Chota Sheel km 0 00 to 2 00 SH C o R wall at Rd 1 405 to 1 420
Metalling and Tarring of link road to Village Shiaso Km. 0/00 to 5/200 (SH- Providing and laying Grading-III and premix carpet from Km. 0/00 to 4/690
R/R damages on Link road from Leo Bridge to Hango Km. 0/00 to 16/00 (SH- C/O B/wall in CC at RD 2/110 to 2/130
R.R. damages on link road to village Batseri Km 0.00 to 2.680 .Sub Head.Hiring of Excavator cum loader in working condition for removal of snow.Slips.debris etc between Km 0.00 to 2.300.
Periodical Renewal on Link road from Sapri to Hundrian under AMP 2025 26 for Village Road SH providing and laying 25mm thick bituminous concrete in Km. 0.00 to 0.930 0.930 Km.
A/R nd M/O Link road from NH-03(Jia) to Shankergarh km 0/00 to 1/00(SH- Construction of Retaining wall between RD 0/120 to 0/132.50
R/R Damages on Barog link Road Km 0/00 to 0/700 C/o B/wall in wire crate Various damaged/Sliding Rds between Km 0/00 to 0/03
C/O Link road from Three Pole to Tashigang Km. 0/00 tp 3/700 (SH- C/O R/wall in R/R masonry at RD. 3/285 to 3/327
CO link road from Bassi Bhareri Tattar road Prem Chand house to village Bhukkar via Kakkar Gehra Barthu SH C.O ROFD GSB CD work and R Wall at various RDs Deposit
C O Link road to village LArot via bangle km 0 00 to 0 840 SH C o R wall in R R Masonery at RD 0 705 to 0 748
Construction of link road to Harijan Basti Athmah km 000 to 2000 SH Construction of 4 meter RCC Box Cell culvert at RD 0090 and RCC Nallaha km 0100 to 0200
C/o of link road to SC Basti Mundkhar GP Paplah SH Providing and laying Cement concrete pavement between various damage reaces in km 0/00 to 0/600 under MMGSY.
C/o link road from Parour Khas to Dharot road Km 0/00 to 2/750 (SH- P/L Patch work on various Rds from 0/00 to 2/750 (MMSRRY)
R/R Damages on link Road to Kanlog Km 0/00 to 9/00 C/o R/wall at Rd 0/543 to 0/564 and 0/655 to 0/675
Restoration of rain damages on link road Karluhi to Mandholi km 000 to 5500 SH Repair of Pot holes in km 0700 to 0800 VShape drain at Various RDs Under PDNA2023
R/R Damages on Link Road Village Dhar Tarna road Km.0/00 to 9/300(SH Hiring of JCB for removal of Slip from Km. 0/00 to 9/300)
Repair and maintenance of link road Shitla Mata Nihang Tikka Degree College road KM 0/000 to 5/000 (SW- P/L G-III and Patch work at various RDs (MMSRRY)
C/o Link road Kufta Andvi to H.B. Joney in K.M. 0/00 to 1/00, F/C in 5/7 mtr. wide road at R.D. 0/00 to 0/225