Loading…
Loading…
10,878 results • Best match
Periodical renewal coat 30mm thick bituminous concrete with paver Up Mohal Joh to Saloh km 000 to 2530 and km 2720 to 4000 including hot applied thermoplastic paint cat eyes and Vshape drain HP1202VR0021 under PMGSY
Periodic maintenance of Warai to Kannehar Sunehar road (HP0408VR0051) under AMP (PMGSY road) for the year 2022-23 in Distt Kangra (HP) (SH-Providing and laying Bituminous concrete pavement at Km 1/000 to 2/000)
Periodic maintenance of Kandi to Saruht Uprala road (HP0408VR0064) under AMP (PMGSY road) for the year 2022-23 in Distt Kangra (HP) (SH-Providing and laying Bituminous concrete pavement at Km 4/000 to 5/000)
Providing Periodical Maintanance of Machoti bachhunch Road road km 0 00 to 2500 SH Providing and laying Pot holes Periodical maintenance at RD 0 00 to 2500 with Single side marking retro reflective Under PMGSY Road
Job 9 Periodical maintenance of Ghandawal road to Badoli road km.2-0 to 3-00 Sub Head Patch work,30mm thick bituminous concrete, zebra crossing in km. 2-0 to 3-0 VR044 Under PMGSY
Periodic maintenance of Warai to Kannehar Sunehar road (HP0408VR0051) under AMP (PMGSY road) for the year 2022-23 in Distt Kangra (HP) (SH-Providing and laying Bituminous concrete pavement at Km 2/000 to 3/700)
Construction of Sach Fatehpur road km 0/000 to 5/560 (SH Balance work of Formation Cutting, Passing places, CD Work, Side Drain and Parapets under PMGSY, (Batch - I, 2018-19) Package No. HP-02-306
Construction of road from NH-7 to the factory unit of M/S Mediclove Pharmaceuticals at Ind. Area Kala Amb Distt. Sirmour (HP).
Construction of Road from Negi House to Existing Bouri in ward No 33 Khalini (SH Cutting RD 0 0 to 0 4450 mtr)
Construction of road from near boundary wall of GSSS Haripur Sandholi to Gurudawara Haripur Sandholi G.P. Haripur Sandholi Tehsil Baddi Distt. Solan (HP).
Construction of Road leading to Baragaon from Himuda Block No 7 11 and 12 (SH Cutting Excavation and Retaining walls) ward No 30
Construction of road to Gharati Basti (SW - Providing and laying G-II and CC Pavement at RD 0/226 to 0/360 (MMGSY)
Construction of building portion of blocks A,B,C and D including site development , retaining structures, water supply, sanitary works, rain water harvesting tank, underground water tanks, landscaping work, fencing , internal road work, i/c internal
C/o Sub Tehsil Building at Namhol in Distt. Bilaspur (SH-Approache road to building by widening of road Km.0/0 to 0/210, C/o Breast wall in C.C.1-4-8 at RD 0/015 to 0/030, 0/060 to 0/075,Edging at RD 0/0 to 0/225,C/o V-shape drain in Km. 0/0 to 0/250
Construction of link road from Dehrian to Balah km 0/0 to 3/450 Formation cutting Passing places Retaining walls Breast wall Crash barrier Cross Drainage Works GSB WBMII WBMIII Tarring works Cement concrete pavement Interlocking paver block Drain Pa
Construction of Link road from Tatehra bridge to ward No 5 and 6 upto Primary School km 000 to 1500 in GP Tatehra SH PL GSB MT between km 0300 to 0600 and edge wall at various RDs Under MMGSY
Periodical renewal on link road NH-07 to Majra road under Annual Maintenance Plan for the year 2026-27. (SH- Providing and laying 30 mm thick Bituminous Concrete using plastic waste in km 0/0 to 1/0 including profile correction )
CONSTRUCTION OF LINK ROAD FROM JHURNI MORE TO DHIMAN BASTI BARURA VIA BAG SUB HEAD FORMATION CUTTING IN KM 0.0 TO 0.500 900MM DIA HUNE PIPE CULVERT AT RD 0.350 AND 0.450 AND R./WALL AT RD 0.295 TO 0.330
C/o link road Bhagotla Dharer Rajnali Km 0/00 to 5/00 and Nagri to Manimahesh via Rakh Society Bhasmehar road Km 0/00 to 4/370 (SH- P/L Patch work on various RDs on both roads (MMSRRY)
NDF/2022/18, R/O (Repair Of) Restoration of Rain Damages on Link road T04 to Guglehar Km 0/0 to 4/455 (SH. C/o Edge wall from RD 3/030 to 3/105 LHS Mohal.Guglehar (DC Deposit-NDRF)
C/O link road to village Kajwa km. 0/00 to 2/165 (SH C/O 4.00 mtr span RCC slab culvert at RD. 1/745 , C/O 900mm dia RCC HPC at RD. 0/815 and 1/380) under MNP
C/o link Road from Chharol to Lower Chharol in km 0/00 to 2/300 (SH- C/O 900 MM dia Hume pipe culverts with both side wing wall at RD 0/260, 0/415,0/840 and 0/885)
Job 3 Construction of link road Nagnoli to Harizan basti via Mohalla Brahmana, Gujran Chooti khad km..0-0 to 3-345 sub Head of Formation ,GSB , wet mix and BC in km.2-910 to 3-345 Under SCCP
Recarpeting of Link road from USV/Gopal life sciences to Betts India Pvt. Ltd. via Sun Pharmaceuticals , Hill Top Industrial Area, Jharmajri (SH -C/o cross Drainage and Drain, P/L WBM and 40mm thick BC over 50mm thick DBM)
Const of link road Chowar to Bhagrah via Takoli Bharad Panga km 000 to 3500 Portion km 000 to 1000 SH Const of Balance work for Const of 3 mtr slab culvert at RD 0350 including Approaches Wing walls Under MNP
C/o link road from Main road Bindraban towards Ramesh Mehta , Rajinder and Binsam sharma other House (SW- C/o 1.00 Mtr RCC Slab Culvert at RD 0/200 and P/L G-II, G-III and M/T Works)
M/T on Link road village Khalla Kiar koti Dhiman to Village Kiarta Piplity Km. 0/0 to 5/645 (SH -P/L WBM Grading-l,Grading-ll and M/T in Km. 0/00 to 1/00)Under SCSP
Restoration on link road to village Joh Km 0 00 to 2 855 SH CO B wall at RD 1 210 to 1 240 Rwall at RD 1245 to 1 260 1 360 to 1380 2 120 to 1160 Under PDNA
Repair of link road to Mahan Avtar Ji Kamdhenu Gaushala Thaplan km 000 to 0950 SH Providing and lying 900mm dia RCC Hume pipe culvert at RD 0045 and PL GSB and MT km 000 to 0300 against DC deposit
Construction of link road from Una Basoli Road to PGI Satellite Center km.0-0 to 0-250 Sub Head P.L Granular Sub base, WMM and bituminous concrete, Interlocking Paver Blocks etc. in km. RD.0-0 to 0-170
Construction of RCC T Beam Bridge Over Bindla Khad at RD 0.630 on link road to village Bindla Km 0.0 to 2.0. Under C.M.Annoucement in Distt Sirmour HP. (SH Construction of Bridge portion including wing wall and Construction of Approaches)
Construction of link road bifurcate from Badrinagar Jamniwala Parduni road near fish farm to Taruwala NH-707 km.0/0 to 0/690(SH-Providing and laying interlocked concrete block pavement 80mm.Thick at RD 0/0 to 0/690)under MMGSY
Special repair to Link road Balna to Naraina Behli in G.P. Kelodhar. road 0/0 to 3/00) (SH- Providing and laying GII and 2.5cm. thick premix carpet surfacing , seal coat at km 0/00 to 1/00) Bakhrunda Side
Restoration of rain damages on link road Mihara to Unda road km 0/00 to 1/300 SH Construction of R/wall, Patch work and drain in between 0/200 to 0/500 at various Rd Under PDNA Year 2023
Construction of link road from Gangtoli to kumarli via Kollu More jokla SC Basti Bhikyat km. 0/0 to 5/555(SH-Construction of formation cutting 5/7 mtrs wide road in km. 0/0 to 1/570) under SCSP
Construction of link road from Nauni to Tirmidhar Km. 0/00 to 2/330. (SH- Formation deficiency of road from 0/00 to 0/825 and formation cutting 5/7 mtr wide road in Km. 1/135 to 1/240)
Repair and restoration work on link road Pandoga Ispur road to Kiarian Km 0/0 to 2/900 SH P/L CC Pavement, Causeway, crate work and cut off wall at RD 1/562 to 1/605 under PDNA 2023
Periodical Renewal coat 30mm thick bituminous concrete with paver on link road Talmehra to Rajpura road Km 000 to 1000 HP1201 VR 067 and LR from Ambehra Dheeraj to Harot Km 3000 to 400 HP1201 VR 056 for the year 202627
Construction of link road from Ambehra Harot to Mohalla Sunarian Brahmana km 000 to 0780 SH CO 900mm dia RCC Hume pipe culvert at RD 0558 PL GSB MT CC pavement and drain between km 000 to 0585 under MNP
R.R damages on various roads under Karchham Division Sub Division HP.PWD Bhabanagar .Sub Head. Hiring of Excavator cum loader in working condition for removal of snow.Slips.Glaciers from Shong to Brua road Km 1.500 to 5.800 Link road to Village Kanai
Construction of link road from Nauni to Tirmidhar Km. 0/00 to 2/330. (SH- Formation deficiency of road from 0/00 to 0/825 and formation cutting 5/7 mtr wide road in Km. 1/135 to 1/240
C/o link road to village Sarani (SH- Formation cutting in Km. 0/615 to 0/735 and C/o Retaining wall at RD 0/630 to 0/650 (Left side) 0/635 to 0/645 (Right side) DC Deposit
Job 8 Periodical maintenance of link road from Gowshala Bathri to Main Bazar Bathri km. 0-0 to 0-950 Sub Head Patch work, 30mm thick bituminius concrete,zebra crossing in km. 0-0 to 0-950 VR166 Under State Head ,
CO and MT of Link road from Bhalola bridge to Mohalla Bannewala Ghandawal km 0000 to 0500 SH PL 20mm thick Premix Carpet with seal coat in km 0000 to 0150 and Both side edge wall in km 0000 to 0120
Repair and Restoration of Rain Damages Link Road Chintpurni Amlehar Road via Dhalwari 8500 to 12000 SH Co Retaining wall RD 8800 to 8900 and 10100 to 10300 and V Shape Drain work RD 8500 to 9800 Under PDNA 2023
Job 14 Restoration of rain damages of Link road from Ghaluwal to Village Badehra Teh.. Haroli Distt. Una km. 0-0 to 5-135 Sub Head C.O U shape drain and Paver block at RD. 2-800 to 2-870
Periodical Renewal on i Link road from Talara to Railway Station road Km. 0.0 to 1.0 ii Nerna to Panjasra road Km. 0.0 to 1.200 under AMP 2025 26 for Village Road SH providing and laying 25mm thick bituminous concrete 2.200KM
R R Damages on Link road To Village Gheota km 0 00 to 2 00 SH B Wall at Rd 0 830 to 0 880 0 570 to 0 595 0 595 to 0 675 0 745 to 0 810
Restoration of rain damages on Link road Govt High School Suhin to Mandholi SH CO Retaining walls on Karluhi to Mandholi road at RD 2010 to 2025 2050 to 2063,2100 to 2105and Vshape drain in Km 2000 to 2130 under PDNA2023
C/O link road to PHC Tangling Km 0/00 to 1/630 (Sub Head- P/L G-I, G-II, G-III and 20mm thick premix carpet with seal coat at RD 0/00 to 0/390) Under BADP