Loading…
Loading…
10,878 results • Best match
Repair of damages due to laying of MDPE Natural Gas pipe line on link road from Dehlan to Basdehra upto Punjab Boundary km.0.0 to 2.400 (SH P.L interlocking cement concrete paver blocks at RD.1.758 to 1.893(Under OFC Deposit)
Periodical Renewal coat 25mm thick Bituminous Concrete with paver on Kuthiari to Thathal road Km 000 to 2500 HP1202 VR 0104 and link road Gondpur to Jandoh Kudet Km 1000 to 1200 HP1202 VR 0098 for the year 2025 26
C/o link Road from Chharol to Lower Chharol in km 0/00 to 2/300 (SH- C/O 900 MM dia Hume pipe culverts with both side wing wall at RD 0/260, 0/415,0/840 and 0/885)
Co link road from LR Gokul Nagar to Mohalla Jaswalan ward No 5 Village Ramnagar Nakroh SH Construction of mtr 275 500 wide Jeepable road CuttingFilling and PL Interlocking Concrete Paver Block from Km 000 to 0150 Under MMSY 2025 26
R/R damages on link road to village pipli km. 0/00 to 4/510 (SH C/O R/Wall in wire crate at RD. 0/195 to 0/220, 0/435 to 0/450 and 0/465 to 0/483
A/R and M/O on link road from abrani to Souri road in km 0/0 to 2/500 (SH C/O B/wall at Km 1/420 to 1/435 and 2/023 to 2/030). 2nd Call
Construction of link road village Nai Basti in Gram Panchayat Balugaloa Km 0/000 to 0/400 in Distt Kangra (HP) MMSY Head (SH- Providing and laying Grading-III and cement concrete pavement in Km 0/000 to 0/130)
Restoration of rain damages on link road to Village Kharoh km 000 to 3500 SH CO VShape drain in km 1195 to 1240 CO Retaining wall at RD 2880 to 2895 3105 to 3150 and Interlocking Paver block Under PDNA2023
Balance work for the construction of link road from Pukhar ka Talab to Samshanghat in GP Chakwari Km 0/00 to 1/105 SH Construction of slab work at RD 0/900 to 0/995 Under Chief Minister Announcement work
Improvement of Black spot on link road from Leo Bridge to Hango Km. 0/00 to 16/00 (SH-P/F W-Metal beam crash barrier in essential reaches from Km. 6/00 to 7/00 (under road safety funds
C/O link road Bhaned ki Johari to Devraja mandir km 0/0 to 1/00 (SH C/O R/wall and V-shape Drain at various Rds between km 0/200 to 0/500) Under MNP 2020-307-1272
Periodical renewal on link road to Village Melion km. 0/0 to 1/0. (SH- Providing and laying 25mm. thick Bituminous concrete in km. 0/0 to 1/0 including profile correction ). Under Annual Maintenance Plan for the year 2025-26.
Construction of link road to village Plashla (actual name Yashwant Nagar via Plasahla Nauni road km 0/00 to 6/095 (SH Construction of 900 mm dia Hume pipe culvert along with both side wing walls at RD 0/645).
Repair and restoration work on link road to mohalla Tipperain Km 0/0 to 6/650 SH C/o U-shape drain at RD 0/585 to 1/235, Patch work at RD 3/480 to 4/485 under PDNA 2023
C/O link road to Village Doli to Jabal taloti km 0/0 to 3/500 (SH P/L 600mm dia HPC Pipe and Gr-III and premix carpet at RD 0/0 to 2/00 including correction layer G-II).
C/o Link road from Jandu to Harijan Basti Panned via Chhanan Kattal Chaklidhar km 0/0 to 3/100 (SH- C/o R.C.C. Hume Pipe culvert with with wall at RD 0/160 and 0/270 - 2 Nos.) (Under MNP)
Construction of link road from Gugga Temple to Veterniary Hospital via Kalia Basti Km 0/0 to 1/350 SH C/o 900mm dia Hume pipe culvert at RD 0/210 and C/o R/wall and B/wall under OTMNP
Job 3 Construction of link road Haroli Majra Haroli Bankhandi via Police Station Banuali Haroli upto Khui main road Sub Head Construction of Cement Concrete Pavement length 450mtr. and C.O Retaining wall at RD.0-255 to 0-285 Under OTMNP
C/O Link Road From Ratwa to Gehal Km. 0/0 to 3/400 (Sh P/L WBM Grading -l, Grading- II, M/T, C/o Essential parapets and road side drain in km. 2/00 to 3/00) MNP
Construction of link road Thian Bag to Gahal Road km 0/00 to 10/500 (SH C/O 900 MM Dia RCC Hume pipe culvert at RD. 1/910,3/165,3/630,7/030 ,8/555 ,9/885 and 10/270) Under MNP.
Special repair on link road to sada Shiv Mandir Km 000 to 2000 SH Co Retaining Wall V shape drain extension of hume pipe culvert and Providing and laying GSB WMM and tarring for extra widening on curves at various Rds
Job 2 Construction of link road to National Highway to Mohalla Jugadran Rajputan Km 0-0 to 2-500 Sub Head Formation cutting, Earth work filling, Cutting, Edge wall and P.L GSB in km. 0-0 to 0-500 Under OTMNP
Construction of link road to village Haryat Km 0/000 to 2/000 Under SCSP Head in Distt Kangra (HP) (SH-P/L WBM Grade-I and Cement concrete pavement road (M-30 at RD 1/000 to 1/560)
C/O link road from Goyla Panner Badoghat Goyla to Bhukhari ghat Nichli Tirli baneda Nalagarh Division Km 0/0 to 4/500 (SH P/L Gr-II, III and Premix at RD 0/0 to 1/00) Under MNP
Const of link road Chil Kawali to Mohalla Kabir Panthian and Harijan Basti in GP Ghangret km 000 to 3800 SH Const of Cement Concrete Pavement between km 0377 to 1390 and Const of Edge wall between Various RDs under SCCP
Upgradation of link road from NH05 to Shalkhar Km 0.000 to 2.390 SH RODF C.O R.wall B.wall Parapets W beam metal crash barrier V shape PCC side drain, solid cause way Metalling and Tarring including five year maintenance HP0560 Pooh
Construction of link road Pathanbar to Jhang road Km 0/000 to 1/000 in Distt Kangra (HP) MMSY Head (SH-Providing grading-III and cement concrete pavement in Km 0/150 to 0/180 and 1/990 to 2/060).
C/O link road from Kepu to Harijan Basti Arthi Km 0/0 to 3/0 SH Formation Cutting C/O R/Walla B/Walls Wire Crate walls C/O RCC Hume Pipe Culvert and Kharanja Stone Soling at various Rds
M/T on 5/7 mtr wide link road to village Mooring and Delda Km. 0/0 to 1/700 SH Providing and laying 20mm thick premix carpet with seal coat including correction layer Km 0/0 to 0/600
C/O link road from Ranchampo to Sharakpi via Thorge in G.P. Kalpa Km. 0/00 to 2/00 (SH- Providing and laying GSB for correction, G-III and premix carpet from Km. 1/500 to 2/00 and protection work)
R/R Damages on link road from Dharonk Kainchi to Sharoli via Bouri Bankufer road Km 0/00 to 5/200 C/o B/wall in wire crate at various damaged / sliding RDs between Km 2/600 to 2/700
R R Damages to link road Sangad to Hingori road km 0 0 to 1 500 SH C O B Wall in PCC 1 4 8 and stone Masonary cm 1 6 at RD 1 280 1 295 DEPOSIT WORK
Annual Maintenance Plan for the Year 2025 26 on Link road from Galu Amb to Bhumplu Da Ghat km 0 00 to 3 00 SH P L 25 mm Thick BC in Km 0 00 to 3 00 Add Kms
Construction of link road from Kharoh to Bhated via Godri Sidh from km 000 to 6360 SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and Vshape drain etc including five year maintena
Construction of link road MTN to Beh Gurian KM 0.0 to 1.200 SH Construction of formation cutting from KM 0.0 to 0.500 and Hume Pipe Culvert 900mm dia at RD 1.043 to 1.103 with wing wall under Mukhya Mantri Sadak Yojna
Repair and restoration work on link road mohalla Bharwala upto swan river Km 0/0 to 1/500 SH C/o solid causeway, R/wall and repair of pot holes in RD 0/180 to 0/380 under PDNA 2023
C/O link road from Gajwa (GSSS Sangna Satahan) to village Chunoti km. 2/550 to 9/615 (SH C/O R/Wall in wire crates at RD. 2/705 to 2/715 and 2/720 to 2/740) MNP
Construction of link road fom Bohta to Palkani km 0/00 to 5/200 under SCDP (Sub Head- Formation cutting 5/7 mtr wide road in km 1/00 to 2/00 and construction of wire crate wall dumping site
Construction of 25.00 mtrs span RCC Box Girder Bridge over Bhaloon Khad on link road from Baldhar to Bheru at RD 0/528 in Distt Kangra (Himachal Pradesh) Under SCSP (SH-Construction of Sub-Structure, Super Structure and both side approaches).
Job 5 Periodical maintenance on link road Panjawar Bathri to Subowana Baliwal road km.1-00 to 2-00 and 3-00 to 5-00 Sub Head Patch work , 30 mm thick BC and zebra crossing VR073 under State Head
Upgradation of Link road from Barring to Tibok, Othang and Yangthang Km. 0/00 to 9/215 under NABARD-RIDF-XXX SH ROFD, MT, Retaining wall, Breast wall, CD work, V-shape drain, Parapets, Wire Crate and Sign Board etc.
C/O link road Manjholi Lakhanpur Jhiran km 0/0 to 8/760 (SH C/O sub structure, super structure of RCC Box Cell bridge (7.424x5.00mtr four cell unit) total span 32.00 mtr at RD 6/240) and M/T work
Construction of balance work of link road from Kathar to Khadvi up to Shohan in km 0/00 to 8/475 SH- Construction of RR masonry R/wall at RD 0/915 to 0/934 and 3/225 to 3/245
Construction of link road to village Naura including bridge over Baner Khad to joint Thanpuri Km 0/000 to 1/870 in District Kangra, (H.P.). (SH-Balance work of Retaining wall at various Rds between Km 0/000 to 1/000.)
Construction of link road from Dini Kumb Dhanara road km 0.0 to 5.040 Under NABARD RIDF XXIX SH Construction of 5.7mtr. wide formation cutting and Retaining walls Brest walls and crash barrier cross drainage Providing and laying GSB Wet Mix Macadam
CONSTRUCTION OF LINK ROAD FROM FROPM VILLAGE SARAD DOGRI TO LOWER SARAD DOGRI ROAD KM 0.0 TO 2.500 SUB HEAD EARTYH FILLING GSB WQBM G-112 G-111 AND 30-MM THICVK BITUMINOUS CONCRETE KM 0.500 TO 1.200 UNDER OTMNP
R/R damages on link road from Koksar bridge to Koksar Village Km. 0/00 to 2/00. (SH- C/o R/wall at Rd. 0/650 to 0/680, 1/075 to 1/090 and 1/115 to 1/130)
R/O R/D on link road from Simble Nallah to Dalahar SH C/O PCC R/Wall at Rd 0/560 to 0/580 and B/Wall at Rd 0/640 to 0/655 and 0/720 to 0/735
Annual Maintenance Plan for the year 2022-23 On link road Sach to Rest House road Km 0/0 to 0/500 SH Providing and Laying 20mm thick premix carpet in Km 0/00 to 0/500 Road Number HP0205VR0053073
Job 9 Periodical maintenance of Gondpur turf Jaichand to Haleran road km.0-0 to 0-500 Sub Head Patch work , 30mm thick bituminous concrete,zebra crossing in km. 0-0 to 0-500 VR137 , Link road Chetran Umrali via Laluwal