Loading…
Loading…
10,883 results • Best match
Construction and M/T on link road from vill. Kalath Dhal Paliyara in G.P. Rajana (SH 5/7 mtr. Wide formation cutting from km. 1/705 to 2/360 and 900mm dia Hume Pipe Culvert at RD. 1/890 and 2/165)
Job 5 Construction of link road to Harijan basti Malahat RD.0-0 to 2-200 Sub Head Providing and Laying 80mm thick interlocking paver block, pavement with 300mm dia plastic pipe for drainage RD.2-010 to 2-130 Under SCCP
Construction of link road Bagroo Agriculture University Chack km 000 to 2337 SH Construction of Breast wall at RD 0935 to 0960 and 0975 to 0995 and Construction of Breast wall at RD 0840 to 0846 and 0860 to 0873 RHS under MNP
R/R Damages on link Road Village Kundli Road Km 0/00 to 1/200 C/o R/wall at various damaged / sliding RDs between Km 0/00 to 0/550, and P/L Soling in Various Rds 0/00 to 1/200)
Construction and MT on link road Banne Di Hatti to Ghewat Bahed road from km 000 to 4520 SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and Vshape drain etc including five year ma
C/o link road from Kothewala bridge to Ghuttanpur Patlion Surajpur road km 0/0 to 2/515. (SH C/O embankment right side approaches and extension of 2.00 mtrs span RCC slab culvert at RD 0/450) under NABARD RIDF-XXI.
Job 3 Construction of Link road from GPS Baliwal to GSSS Baliwal GP. Baliwal Tehsil Haroli Distt. Una Sub Head P.L paver block at RD. 0-050 to 0-250 and Edge wall at RD. 0-0 to 0-050 Under MMGSY
Construction of link road from Sunkar Khad to Rampur Bharapur School Km. 0/0 to 1/570. (SH-Construction of Bed cutting, Providing and laying granular sub base, cement concrete and paver block from RD 0/510 to 1/020) under MMSY.
Repair and Restoration of Rain Damages link road Harijan Basti Tatehra Km 000 to 3200 SH PL 80 mm Thick Interlocking Concrete Paver Block between RD 0050 to 1500 and Relaying Metaling Tarring due to read crust damage PL GSB WMM and 30m
Periodical renewal coat 30mm thick bituminous concrete with paver thermoplastic center line and zebra crossing on link road T03 NH70 Jawar to Naloh km 3300 to 6320 HP1202VR0027 and Kotla to Nehri Khalsa km 000 to 10 HP1202VR0028 for the year 202324
Job 8 Restoration of rain Damages of link road to Village Upper Arniala via Bazigar Mohalla km 0-0 to 3-0 Sub Head Providing, laying WMM and BC at RD 0-0 to 0-045 and Retaining wall MC Una Deposit work
Special Repair of 86.40 Rmt Span suspension Bridge over river beas on Pandoh Shivavadhar link road Distt Mandi SUB HEAD Dismantling of old bridge components and P/F of new bridge material same as dismantled approach of the bridge for 21.80 Rmt
Annual Periodical Maintenance Plan for the year 2022-23 on link road to village Teeling Km 0/0 to 3/00 SH Providing and laying 20mm thick premix carpet with seal coat in Km 2/0 to 2/590 Road Number HP0701VR0034
Job 3 Construction of Link Road from Baba Balak Nath Mandir Badehar Jhurowal to Sasan Lamlehra road via Basti Pandit Cheelawala GP. Badehar km. 0-0 to 1-140 Sub Head Construction of Retaining wall, Providing and Laying Cement Concrete Paver block in
R R damages on link road village Dalgaon km 0 0 to 0 450 SH P L essential Kharanja stone soling portion between RD 0 350 to 0 450 and PCC 1 2 4 over road portion RD 0 000 to 0 450
Construction of link road from Mubarikpur Bharwain road to SC Basti Bhungiyan Ward No3 In GP Ghewat Behar 000 to 1000 SH Construction of Formation Cutting, Filling, Retaining wall at RD 0040 to 0052 LHs and Construction of 3mtr RCC Slab culvert at
Job 3 Construction of link road Nagnoli to Harizan basti (via Mohalla Brahmana, Gujran Chooti khad Tehsil Haroli Distt. Una km..0-0 to 3-345 Sub Head P.L Embankment, GSB, WMM and Tarring in km. 2-548 to 3-055 Under SCCP
Construction of link road Khad Samethan Neem Wala Baba Mandir to Harijan Basti Chokata Km. 0/0 to 3/0 (SH- Formation cutting, Retaining wall in Km. 0/0 to 1/0 and 3.00 meter span R.C.C. slab culvert at RD 0/160)
Restoration of rain damages on link road from main road (NH-503 Extension) to House of Fakir Singh ward No.01 village Upper Dehlan km.0.0 to 0.750 (SH Providing and fixing paver blocks at RD.0.210 to 0.365.50) (under PDNA Deposit)
Job 9 R.O and Restoration work of rain damages on link road to Village Kungrat via Kalera 0-0 to 1-800 P.L C.C Pavement and wire crate on down stream for protection of existing causeway at RD. 0-800 to 0-840
Improvement and metalling of Doli to Village Talloti upto bubral to link road Luns km 0/0 to 2/500 (SH P/L Gr-I, Gr-II and P.C 20mm thick with seal coat in km 0/0 to 0/3220. Under MMGSY
Restoration of rain damages on various roads under Udaipur Sub Division (Triloknath Section) (SH Hiring of J.C.B/Excavator cum loader for removal of Snow/Landslide on link road Triloknath Temple to Hinsa, Shakoli, Bardang and Lobber Km. 0/00 to 7/00)
Job 8 Periodical maintenance on Link road to Village Ispur Km. 0-0 to 1-/0 HP1203VR047 and Panjawar Bathri road to Ispur Pathak Mohalla Kayalia road Km. 1-0 to 1-900 HP1203VR083. Sub Head P.L 30mm thick BC Under State Head.
Job 15 A.R and M.O Link road Jakhera to Bangarh Gameshah road km. 0-0 to 1-500 Sub Head C.O Breast wall in km. 0-630 to 0-644 and C.O U-shape drain in RD. 0-645 to 0-670
Restoration of Rain damages on link road Chopati towards the house of Sh. Giki Goyal, Akshay Katoch and others Ward No. 4 Km 0/00 to 0/250 (SW- Providing and laying wearing, Bituminous Concrete Km 0/00 to 0/188 (IPH Deposit)
Repair and Restoration of Rain Damages on link road Gagret Daulatpur road to Adarsh Colony Mohalla Lohara Kumharan Trali and Mohalla Gugga Panga in village Mawa Kohlan Km 000 to 2600 SH PL 300mm dia RCC Hume pipe with chamber for drainage of
C/o link road Shantla Bhadwar road upto Village Sai (SH C/o Retaining wall P/l Interlocking concrete block in between Km. 0/0 to 0/330 and P/l CC pavement at RD. 1/380 to 1/510) under MMSY.
A/R and M/O link road village Unger Kando km. 0/00 to 8/705 (SH C/O R/Wall in wire crate from km. 2/880 to 2/890, 3/310 to 3/320 and 3/660 to 3/680)
Construction of link road from Cow shed of Sh. Surjeet Singh to House of Sh. Vishan Dass in Tika Rangehar ( Lahar), teh. Baroh in Distt. Kangra HP Deposit work (SH Providing and laying cement concrete at RD 0/00 to 0/55).
RRD of Rain Damages on Link road Village Diyara Km 0/0 to 1/300 .(C/o Retaining wall ,Breast wall and V-Shape Drain and Providing and Laying Cement Concrete Pavement at Various RDs between KM 0/0 to 1/300.
Construction of link Road from Chilogn Bag Tilwagi Chowki Margwal Km. 0/0 to 8/0 (SH- C/o Earth work, cross Drainage work, unlined drain, soling crash barrier and dumping structure in Km. 0/0 to 8/0 (Under NABARD RIDF-XXXII
Job 1 Restoration and repair on link road to Harijan Basti Dehlan km. 0-0 to 0-850, Tehsil and District Una H.P Sub Head Demolishing Cement Concrete P.L NP-2 RCC Pipes, C.O U-shape drain and C.C. Pavement etc. Deposit work
Periodical maintenance Link road from Una bridge to vill.Arniala via Moh. Bazigran to Shiv Mandir to vill.Ajnoli km.0.0 to 2.500) (HP1205VR0139) ( SH P L 30 mm thick BC with paver finisher Sides line zebra crossing and cat eyes) under State Head
RRD rain damages on Link road to Lohara Ward No. 5 GP Baliana Km. 0/0 to 1/0 (SH C/o Protection wall from RD 0/129 to 0/149.50, 0/155 to 0/175 and 0/270 to 0/285)
Construction of link road from Haripur Dosarka to Bhillo Nag Mandir including Sanyala under GP Sherlohara in Km. 0.00 to 1.700 SH ROFD, P.L GSB, and C.O CCP from RD. 0.500 to 1.200 and R.wall, V-shape drain and Edge wall Under MMGSY
C/O link road to harijan basti Bathu ward No 9 GP Bathu SH C/O 2 No causeway at RD 0/515 to /0555 and 0/720 to 0/760 and C/O edge wall at Rd 0/770 to 0/798
Job 6 Construction of Link road from Pritam ki Nehali to Moh. Loharan Chak Khad Village Khad ,Tehsil Haroli Distt. Una Sub Head P.L Earth filling in RD. 0-0 to 0-200 and C.O 900mm dia Hume pipe culverts Under MMGSY
SDF 202 37RO Repair Of Repair and Restoration of rain damages on link road Jole to Kaint via Bhrooran Amroh Dhrun Kulhroo Sanjot road Km 000 to 14255 SH Const of Retaining Wall at Km 3175 to 3200 GP Jole Deposit Work
R/R damages on link road to village Dharmana km 0/0 to 9/160(SH C/O wire crate in R/wall at Km 7/960 to 8/010, C/O Toe wall at existing pipe culvert at RD 7/997).
Job 6 Link road Gurodwara Tahlisahib from Samnal Baliwal road km.0-0 to 0-500 Sub Head Providing and Laying Hume Pipe culvert 900mm dia RD.0-290 and GSB and BC in km.0-0 to 0-500 Under MMGSY
Job 10 Construction of Link road to Village Bhatiara to Jongpur Tehsil Haroli Distt. Una Sub Head Formation cutting, Embankment, GSB in km 0-150 to 0-650 and C-O 900mm dia Hume pipe culvert at RD. 0-550 Under OTMNP
Construction of link road Chowar to Jawar via Radoh Kanyari Rajpura Nari including two Nos Bridges from km 00 to 10075 SH Formation cutting including Retaining walls, cross drainage work GSB MT Drain CC pavement road signage from km 8570 to 10075
Improvement and strengthening of link road from Lower Samnal to Pubowal Chowk via Baliwal Km 0/0 to 11/470 SH Imp. R/wall, CD,GSB,WMM, Tarring work, side drain, CC pavement and road side furniture etc. under Deposit Industry Deptt
Periodical Renewal Coat for the year 2026 27 to 4710 1 Link road T02 to Tundkhari SH Providing and laying 30mm thick Bituminous Concrete laying with paver finisher in between Km 200 300 and to 5540 HP1204VR005752303 309 Village road 2 Lin
C O link road Roai gad Odhidhar HB Khashadhar km 0 00 to 1 300 SH C O B Wall in R R stone masonary and wire crate in B Wall KM RD 0 555 to 0 585 0 555 to 0 580
Balance work of link road from Leo Bridge to Hango village Km 0.000 to 16.000 Portion Km 7.000 to 16.000 SH M T R.wall B.wall PCC drain Parapets logo sign board and five year maintenance after completion under Package No.HP0508 Slice B
Balance work of link road from Leo Bridge to Hango village Km 0.000 to 16.000 Portion Km 0.000 to 7.000 SH M T R.wall B.wall PCC drain Parapets logo sign board and five year maintenance after completion under Package No.HP0508 Slice A
R/R damages on link road to Village Kot in km 0/0 to 3/500 (SH C/O B/wall at RD 0/260 to 0/310 and wire crate in R/wall at RD 0/260 to 0/275). 2nd call
Improvement of link Road Padara Kashkar Pagana Km 0/00 to 1/525 C/o R/wall at RD 1/210 to 1/234 and P/L Kharanja stone soling in Km 0/320 to 0/460 and 0/575 to 0/705
Construction of 40.00 mtr. span prestressed concrete box girder bridge at RD 13/300 including approaching along with 5 years routine maintenance ROFD, Protection of work, Metaling and Tarring, construction of road side drains, Crash Barriers, Road