Loading…
Loading…
10,881 results • Best match
Periodical maintenance by Bitumen concrete and C/O PCC U-shape drain.
C/O H-pipe culvert, P/l wearing and tarring etc.
Sub Head-Balance work for construction of both side approaches of 25.00 meter span bridge including balance road work
Providing and Laying bituminous concrete 30mm thick in Km 0/00 to 2/00, 0/00 to 3/00 0/00 to 1/710 respectively with paver finisher
Periodical Maintenance of Wangtoo Kafnoo road PMGSY Road under Annual Maintenance Plan for the year 2025-26 SH- Providing and laying 25mm thick Bituminous Concrete including profile correction by providing and laying G-III 53mm to 22.4mm aggregate
Periodic Maintenance of Upgradation of Holta to Langha road under (PMGSY Road) ( HP 0402 VR002719301 )(Under AMP 2023-24) (SH- Providing and laying 30 MM thick Bitumen concrete with Paver finisher in Km 0/00 to 1/00)
Periodical maintenance on Pandoh to Nagdhar Road Km. 0.0 to 5.0 SH Providing and laying 30 mm thick bituminous concrete single layer and hot applied thermoplastic in Km. 1.0 to 2.0 PMGSY AMP for the year 2022 23.
Periodical maintenance on Jalla to Khini road km 0/0 to 2/0 (SH- Providing and laying premix carpet 25 mm thick in km 0/0 to 1/0 under AMP for the year 2025-26) (PMGSY ROADS)
Annual Surfacing on Kogi to Seon road Km. 6/00 to 22/000 (SHProviding and Laying Tack coat and 30 mm thick Bituminous concrete in Km. 0/000 to 2/000 ).( Under Approved amp-2023-24 ) ( PMGSY Road
Periodical maintenance on Bounchari to Sudharani road Km. 0.0 to 14.0 SH Providing and laying 30 mm thick bituminous concrete single layer and hot applied thermoplastic in Km. 8.0 to 12.0 PMGSY AMP for the year 2022 23.
Annual maintenance Plan 2024-25 on Bagan Darka Bhumteer road Km. 0/00 to 7/500 SH Providing and laying G-III and 25mm thick mix seal surfacing and in Km. 4/00 to 7/500 PMGSY ROADS
Annual Surfacing on Kogi to Seon road Km. 6/00 to 22/000 (SHProviding and Laying Tack coat and 30 mm thick Bituminous concrete in Km. 2/000 to 3/765 ).( Under Approved amp-2023-24 ) ( PMGSY Road
Annual Periodical Maintenance of Poabo to Dumi road Km. 0/00 to 3/310 ( Sh Providing renewal coat with 30 mm thick Bituminous Concrete in Km. 0/00 to 2/000 ) ( UNDER APPROVED AMP-2022 -23 ) (PMGSY ROAD )
Periodical maintenance on Sansoi to Kashana road km 0/0 to 6/250 (SH- Providing and laying premix carpet 25 mm thick in km 0/0 to 3/0 under AMP for the year 2025-26) (PMGSY ROADS).
Periodical maintenance on Rahi to Dadwas road Km. 0.0 to 17.0 SH Providing and laying 30 mm thick bituminous concrete single layer and hot applied thermoplastic in Km. 0.0 to 3.0 PMGSY AMP for the year 2022 23.
Periodical Renewal and Periodic Maintenance on Rey khas to Beh road Package No. HP-04-222 Under PMGSY Incentive Post DLP SH Providing and laying 25mm thick bituminous concrete in KM 0.0 to 4.580 including Five Year Maintenance
C/o Link road from village Sangna to Govt. Sen Sec. School Sangna Satahan km 0/00 to 4/00 (SH C/O 900 mm dia hume pipe Culvert at RD 0/910, 1/015, 1/225, 1/390 and 1/515) MNP
R/R of Damages on link Road Khanog to Jalth Km 0/00 to 2/300 C/o B/wall at Rd 0/165 to 0/185, 1/833 to 1/842 and R/wall at Rd 0/345 to 0/360
Construction and Up-gradation of link road from Mandorghat to Jamog via Bhargan KMs 0/0 to 5/040)(SH Formation cutting , B/Wall, E/Wall, side drain Metalling and Tarring, Parapets , and crash barrier in KMs 0/0 to 5/040)
Extension of link road to Rizing Kanda Km. 0/00 to 5/500 (SH-F/C from Km. 4/300 to 5/00, C/O R/wall in CC at RD. 4/435 to 4/450 and 4/735 to 4/755
Job 1 C.O link road Bangarh Panchayat to village Fatehwal Lawana Basti Mehatpur Handola road to Mehatpur Panchayat ward No.4 Sub Head C.O Retaining wall at km.0-300 to 0-313 and P.L NP-2 pipe 900mm dia Under OTMNP
Annual maintenance plan for the year 2022-2023 on link road to village Jia from NH Km. 0/0 to 1/500 SH Providing and laying Bituminous concrete in Km. 0/0 to 1/500 and C/O PCC drain Road Number HP0602VR00122221.
Construction of link road from Naggar to Karishna Mandir via Thawa up to Chachogi Km. 0/00 to 3/600 under NABARD-RIDF-XXX SH FORD, MT, Retaining wall, Breast wall, CD work, V-shape drain, Parapets, W-metal Beam Crash barrier etc.
C.O LINK ROA RAKKAR SHANTLA FROM HOUSE OF PARDHAN ANSAR CHAND VIA KOUD BASTI TO CONNECT WITH SITPAK NIHARI LINK ROAD I.C BRIDGE K 0.0 TO 3.0 SH P.L GSB WBM G-1 AND TARRING IN KM 0.0 TO 1.0 UNDER OTMNP
Co link road from LR to Abadi Sardar Puran 9 Naresh Ramesh Aman Kumar via Dhussi ward No 3 Village Tatehra SH Construction of 275 500 mtr wide Jeepable road Metalling and tarring from RD 000 to 0250 Under MMSY 2025 26
Up-gradation of link road to village Gawazang Km. 0/0 to 4/300.(SH C/o R/wall at various Rd. 0/617 to 0/627, 1/005 to 1/122 and B/wall at Rd. 1/00 to 1/020
Construction of link road to new kather from house of D.S. Chauhan to Uma Mehta from Negi house to kanta house new kather in ward no.17 SH. C.O R. wall between RD 01 to 100 to 0 to 113.Depost Work.
Job 3 Restoration of rain damaged on link road to Rakkar to Basoli km. 0-0 to 2-450 Sub Head P.L GSB, WMM, 50mm Bituminous, Macadam, 30mm thick BC and C.O Retaining wall and Drains in RD. 0-150 to 0-405
C/O link road village Kajwa km. 0/00 to 2/135 (SH P/L WBM G-I,G-II and M/T alongwith PCC road side drain in Km. 1/00 to 2/135 alongwith 1 No Culvert at RD. 1/090)
SDF 2024 604 RO Repair of Repair and Restoration of Rain Damages link road from Madan Lal Ex Pradhan Roshan Lal Di Hatti to Bumbloo km 000 to 1800 SH Construction of Retaining wall in GP Deoli Km 0635 to 0675 Under SDRF
C/o of link road to Doon to Mata Sohni Devi Temple road GP Kotlu Brahmna SH Providing and laying cement concrete pavement at Varous damage reaches at RD 1/440 to 1/597 and 1/650 to 1/777 under MMGSY
Job 6 Construction of link road Petrol Pump Bhadsali to Una Hoshirpur road to Pandoga lower to Har sainian abadi Tehsil Una Distt. Una Sub Head P.L GSB, WMM, Premix Carpet with seal coat in RD. 1-160 to 2-0 Under OTMNP
Construction of link road Rounkhar to house of Sh Ashok Kumar Sharma and other in G.P rounkhar Km 000 to 1000 SH FC ic filling between Km 000 to 0510 and Construction of 900mm hume pipe culvert at RD 0040 Under MNP
Construction of link road to Village Surhar km. 0/0 to 4/365(SH- ROFD,Cross-drainage work,Soling, M/T work,Parapets and U-shape drain in km. 0/0 to 4/365).including Five years Maintenance Plan .(Under Nabard RIDF-XXIII).
Construction of link road from Naitla Brikhmani to Khohar Harizan Basti tathyar village Gawalthi Sarkwahan Kaflon and Dhanwas KM 0/00 to 3/00 (SH Providing and Laying correction layer G-III, Primer coat, Tack coat, Seal coat and premix carpet at RD
Job 1 Construction of link road Harijan basti Jalgran to Mohalla Harizan upto Jagdev singh House Muhalla Sareda km.0-0 to 1-240 Sub Head FC, Retaining wall, Breast wall and GSB at RD..0-405 to 1-005 Under SCCP
Link road to Kheri Lanacheta road Village Pipli Km.0/0 to 4/510 (SH P/L Kharanja stone soling, V- Shape drain in km. 0/940 to 1/00 and C/O HPC at RD. 0/940) under black spot (HRTC POINT)
Improvement of black spot on link road to Village Labrang Km. 0/00 to 2/500 (SH-Providing and fixing W-metal Crash barrier at RD. 0/00 to 0/500, 1/040 to 1/160 and 2/00 to 2/070
Construction of link road from Kachinghatti to Nag Km 0/000 to 1/720 SH Formation cutting 5/7 mtr wide road between Km 1/045 to 1/720 and C/O Wire crate Retaining wall at RD 0/050 to 0/086
Job 5 Construction of link road to Mohalla Harizan upto Jagtar House Mohalla Sarera upto Tobba via Shsmhanghat Jalgran km.0-0 to 1-240 Sub Head Providing and Laying Breast wall, Cement Concrete Pavement RD.0-910 to 1-080 Under MMGSY
Periodic Maintenance of link road to Ambika Mata temple at Nirmand KM 0/000 to 1/450 SH- Providing annual surfacing including surface correction with WBM grading-3 and providing and applying road marking strips in km 0/000 to 1/450
Job 7 Construction of Link road to Village Khad Mohalla Sonkhalian, Tehsil Haroli Distt. Una km 0-0 to 3-0 Sub Head C.O CC in RD 2-700 to 3-0 and C.O Toe wall 2-820 to 2-850 Under OTMNP
C/O link road Mohalla Khutta to Sant Baba Dhanguwal km 0/00 to 1/300 SH P/L GSB,WMM, BC at RD 0/680 to 0/880 and C/O 900mm dia hume pipe culvert RD 0/800 under MMSY
R/R Damages on khola Link road in K.M. 0/00 to 3/500, C/o, R/Wall in PCC and wire crate at R.D. in K.M. 2/045 to 2/057, 2/060 to 2/075, 2/075 to 2/085
Job 1 Construction of Link Road Lawana Basti Ispur to Dera Baba Bharthri Damiyan G.P. Ispur Tehsil Haroli Distt. Una km. 0-0 to 4-200 Sub Head P.L WMM, BC, in RD.1-800 to 3-015 and drain Under OTMNP
C/O link road Nalagarh Bharatgarh road in Village Dabhota (Nasrali) GP Dabhota (SH C/O 3.00 mtr span RCC Slab Culvert at Km 0/110 P/L Gr-II Gr-III B.T in km 0/0 to 1/00) Under SCCP
C/o link road from Lambi Pukhar Khad to Nainbehi via Janorcha Basti, Chouhan Basti, Gujjar Basti Tehsil Dehra District Kangra H.P SH Construction of Embankment, Cement concrete pavement RD 1.160 to 1.200, C.o Crate wall at RD 1.200 to 1.270 LHS and
C/O link road Nalagarh Bawasani in km 0/0 to 16/00 (SH ROFD, wire crate in R/wall at RD 10/015 to 10/075, B/wall at RD 11/500 to 11/515, 900mm dia HPC at RD 10/005).
Balance work for the Construction of link road to Ribba Kanda Km. 0/00 to 11/725 under NABARD RIDF-XIII/STATE (SH-Balance formation cutting, R/wall, B/wall, X-drainage work with slab culvert, Parapets, Katcha drain, sign board, Kilometer stone
Construction of link road from Churath nallah to Lower Khaltudhar Km 0/000 to 0/600 Km 0/000 to 2/500 SH Construction of P C C Retaining wall at RD 0/442 to 0/454 and 0/480 to 0/492