Loading…
Loading…
10,881 results • Best match
(Sub Head- Construction of 900mm dia RCC hume pipe culvert at Km. 0/440, 0/455 and retaining wall at Km. 0/464 to 0/479 under PDNA 2023).
P/L 4.00 mtrs. Span culvert at Rd. 2/755 Under SCSP Head
P/L CC pavement.
Formation Cutting in Km. 0/0 to 0/750).
C/O R/Wall at Km 3/150 to 3/163, 3/260 to 3/268, 3/268 to 3/274 and 3/299 to 3/305 and C/O Parapits.)
F/C, RCC Hume pipe culvert, Soling etc.
Providing and laying Tarring work in Km 0/0 to 1/000) (Under SCDP)
P/L Cement concrete Pavement at 0/00 (Dheera Bazaar)
Construction of 900 mm dia Hume pipe culvert Providing and Laying Kharanja Soling
Construction of V shape drain including edge wall in CC 1 3 6 (various reaches) and cement concrete 1 2 4 in solied causeway at RD 0/955 to 0/958) Deposit work
Wearing, WBM G-ii, metalling and tarring.
C/o Retaining wall in Km 1/610 to 1/625 (L/S) Km 1/610 to 1/618 (R/S) and P/L CC work in Km 1/595 to 1/610
ROFD in km. 0/0 to 0/500, C/o R/wall at Rd. 0/255 to 0/315, P/L 900mm dia RCC hume pipe culvert at Rd. 0/280 and P/L GSB in km. 0/0 to 0/500
C/o 1.00 mtr span culvert at RD 0/150 and U-shape drain at RD 0/060 to 0/120
C/O 6.00mtr. span RCC slab culvert at RD 0/300 (Deposit work).
Providing and laying soling and M/T in km 0/100 to 1/00 and Providing and laying interlocking concrete block pavement at RD 0/0 to 0/100 ) Under SCSP Head
to Harizan Basti Lahar km 0/0 to 0/500
Metalling, tarring, V-shape drain, RCC hume pipe culvert.
(SH- Construction of R/Wall at RD 0/0 to 0/030 and cement concrete pavement Km 0/0 to 0/100 (Under SCSP)
C/O solid causeway at RD o/510 to 0/560 and 0/930 to 0/980 missing CD
C/O CC pavement at RD 0/500 to 0/900 400 mtr.
C/O R/Wall, B/Wall hume pipe culvert metalling and tarring.
C/O ROFD, R/walls, B/walls, CD, C/O Cement treated sub base/base, Metaling tarring, Panel Cement concrete pavement, side drain and sign boards in Km 0/00 to 3/500
SH-Providing and laying 25mm thick mix seal surfacing type-A in Km 0/0 to 1/840
R/Wall, Humepipe culvert WBM G-II.
C/O RCC H-pipe culvert and R/Wall.
C/O R/Wall, 900mm dia H-pipe culvert.
Cement Concrete Pavement and Side drain) (Under SCSP
Laying of 90 to 45 mm stone Agg. G-1.
Hume pipe culvert soling and wearing.
P/L C.C.Pavement from RD 0/100 to 0/400, P/L Soling Wearing M/T with seal Coat from RD. 0/000 to 0/100 and 0/400 to 1/000
P/L soling C/O H pipe culvert, B/wall etc.
Providing and laying cement concrete pavement
P/L Cement concrete at Rd. 0/0 to 0/09 Vshape drain at Rd. 0/0 to 0/093)
Providing and laying stone soling and cement concrete pavement
Construction of edge wall and Cement concrete pavement 1.00 mtr. span culvert and V-shape drain
P/L soling wearing and tarring
C/O H-pipe culvert with both side wing walls.
P/L M/T in Km. 0/0 to 1/0) Under OTMNP Head