Loading…
Loading…
10,883 results • Best match
Widening of road C/O R/wall at Rd. 1/00 to 1/107, and B/wall at RD. 1/200 to 1/232
(ii) AMP on Link road to village Lingwin km 1/0 to 3/260 (VR038). (iii) AMP on Patta Jalari to Mann km 3/0 to 3/330 (VR0092). (iv) AMP on Lambloo Sikander road via Jhatwar km 0/0 to 1/0 (VR065). (SH P/L 30mm thick Bituminous Concrete 80mm thick
SH. Construction of approach road, site development works, fencing around proposed Divisional store Jagatkhana at Kothipura Nr. Pump house
Construction of building portion with W.S. and S.I., Septic tank, RWHT, Site development, Boundary wall and Approach Road etc.
CO 65 mtr span single lane motrabel bridge on Kathi nallah including 0900 km approach road proposed bridge site
C/O Building portion i/c W.S. S.I and rain harvesting tank septic tank ,site development Approach road etc
Construction of Building portion with W.S. and S.I. , Septic Tank, RWHT, Site development, Boundary wall and Approach Road etcetera)
Formation cutting for construction of approach road and helipad, construction of wire crated retaining wall and construction of Helipad
C/O wall in approach road, L/L interlocking paver blcok in front of building and minor repair etc
SH - Construction of Edge wall with Crash barrier for Protection of trees at RD 0/064 to 0/120 km and 0/254 to 0/310 km )
Construction of Road from Sh RM Sharma House to Ghora Chowki near Panjab House Dargah in ward No 9 Kachighati (SH Construction of Retaining wall )
Construction of road and road side drain from M/s Ozone to M/s Shivam cottage mills at Ind. Area, Kala Amb, Distt. Sirmour (HP).
Construction of road with 60mm ISI Mark paver tiles from house of Sattadhar to Ram Kumar and Lakhire House in Ward No 6, Paonta Sahib.
Construction of Road/Street in Ward No 9 from h/o Ranjeet Rana to tikkar Village Boundary R/D 0/175 to 0/336 mtr.
Construction of road from Parimahal Dr Colony to Sharma House ward No 27 Kasumpti (SH Construction of Retaining wall and M C pipe railing etc)
Construction of road from main road NH 156 towards Lakhmi Dutt house in ward no 04 Nagrota Bagwan S.H. Providing and laying precast interlocking tiles
Restoration of rain damages on Manikarn Barshaini road Km 0/00 to 15/180 (SH- Re-construction of road Removal of slips at various Rds
AR MO PSFS at Shahi Nallah Bajaura Distt Kullu HP SH Construction of road ie cement concrete paved road near House No 17 to 24
Restoration of rain damages on Kayani Lapas road Km 0/0 to 3/200 (SH- Re-construction of road Removal of slips at various Rds).
Construction of road from Nariga to Piran km. 0/00 to 1/660 (SH M/T of road between RD. 0/00 to 1/660
Construction of road in P.W.D colony wards no.6 Phase I from Hari Niwas to Bindal PWD colony. S.Head Excavation Phenolex pipe etc. Phase-I
Construction of road from Chhapol to Thaltu Behli Km. 0/00 to 1/200 (SH Formation cutting between RD 0/120 to 0/210) OTMNP
Construction of road in P.W.D colony wards no.6 Phase II from Hari Niwas to Bindal PWD colony. S.Head Excavation Phenolex pipe etc. Phase-II
Construction of 35.00 mtr. span prestressed concrete box girder bridge at RD 12/120 including approaching along with 5 years routine maintenance , ROFD, Protection of work, Metaling Tarring, construction of road side drains, Crash Barriers, Road S
Construction of 50.00 meter span single steel bridge at RD 17/180 including approaching along with 5 years routine maintenance , ROFD, Protection of work, Metaling and Tarring, construction of road side drains, Crash Barriers, Road Safety Measures
ROFD in between km. 0/0 to 0/700, C/O R/Wall at various Rd. , P/L 900mm dia RCC hume pipe culvert at Rd. 0/200 and 0/350, P/L Cement concrete Pavement at Rd. 0/400 to 0/460 and M/T in km. 0/0 to 0/400 and 0/460 to 0/700) Under OTMNP Head
Construction of Breast wall at R.D. 0/075 to 0/095
Periodical renewal on Mehat Gawana Khali Achon to Naddi road km. 0/0 to 12/0 (SH- P/L Penetration macadam (50mm.), Bituminous concrete 30mm.in km.0/0 to 4/0). (Incentive during the year 2019-20). Under PMGSY.
Annual Maintenance plan for the Year 2023-2024 on Rangrik Bridge to Kibber road 0/00 to 15/500 (SH-Providing and laying Bitumen Concrete including repair of Pot Holes in Km. 0/00 to 4/00) (Under PMGSY
Performance based financial incentive 2019-20 (During the year 2020-21) for periodic maintenance etc. (PMGSY roads) on SNB to village Kharkari in Km. 4/0 to 5/0 (SH-Providing and laying 30mm thick bituminous concrete) VR-0124
Periodical renewal coat 30mm thick bituminous concrete with paver onT04 to Loharli Nichli km 0000 to 1000 HP1204VR033 T04 to Tatehra km 0000 to 1000 HP1204 VR035 and T04 to Kaloh km 000 to 4360 HP1204 VR038 under PMGSY
Construction of 64.00 metre span PSC Box girder cantilever Bridge over River Ravi at Jiura on Machhatar to Agasan road at RD 0/400 (Package No. HP 02-342) under PMGSY (Batch-II, 2018-19) in Distt. Chamba (HP)
Periodic Renewal on Chamukha Bangana road (SH.Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 10/500 to 11/00 and 12/0 to 13/0 VR007113401 and VR007113403 Under PMGSY) during the year 2020-21
Periodic Maintenance on Dinka Barai road Km 0/00 3/180 Road under AMP 2024 25 under PMGSY road SH Providing, laying and rolling of close graded premix surfacing material of 25 mm thickness 1/00 to 3/180.
Annual Maintenance Plan-I for the year 2024-25 (PMGSY road) for Dhaulakuan road 0/0 to 26/400 (SH-Providing and laying 25 mm thick mix seal surfacing including profile correction in km 14/0 to 15/0)
Periodic Renewal of PMGSY ROADS Bari Khas to Sanon Annual Maintenance Plan for the year 2023/24 SH Providing and laying 30mm single layer bituminous concrete HP0410VR007918201 km.0/00 to 1/00 and 1/00 to 1/750
Periodical maintenance on Kuklah to Baggi road km 0/0 to 8/0 (SH-Providing and laying 25 mm thick Mix seal surfacing in km 5/0 to 8/0) under AMP for the year 2024-25 (PMGSY ROADS).
Periodical renewal on Manal Kanti Mashwa road Km 0/0 to 13/650 (SH- Providing and laying 30mm thick bituminous concrete and repair of pot holes in km. 7/00 to 13/610) For the year 2023-24. PMGSY
Periodical maintenance on Satiur to Thatta road km 0/0 to 5/0 (SH- Providing and laying 25 mm thick Mix seal surfacing in km 0/0 to 5/0) under AMP for the year 2024-25 (PMGSY ROADS)
Periodical Maintenance on Kuklah Bandal to Baggi road km 0.0 to 8.0 SH- Providing and laying 30 mm thick bituminous concrete single layer and hot applied thermoplastic in km 0.0 to 8.0 PMGSY AMP for the year 2023-24.
Upgradation on L-23 Amba Da Padhar to Bringal from Km 000 to 4656 under PMGSY Package No. HP12162SH Retification and maintenance providing and laying WMM and repair of pot holes in Km 000 to 4300 Pakage No. HP12162
Annual Periodical Maintenance of Bhawana to Cheri road Km 8/00 to 12/330 Km. ( Sh Providing renewal coat with 30 mm thick Bituminous Concrete in Km. 8/00 to 11/00 ) ( UNDER APPROVED AMP-2022 -23 )(PMGSY ROAD )
Periodical maintenance on Panarsa to Sojha Rahdi road Km. 0.0 to 7.0 SH Providing and laying 30 mm thick bituminous concrete single layer and hot applied thermoplastic in Km. 5.0 to 7.0 PMGSY AMP for the year 2022 23.
Improvement of road safety on Kalka Shimla Wangtoo road NH 22 New NH 05 Km 156/507 to 236/00 SH Providing and fixing Thrie Beam Metal Crash Barriers road marking sign boards and road delineators and C/O of R/wall and B/wall in the State of HP.
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 1/120
Providing and laying tack coat and 30mm thick bituminous concrete in km. 3/0 to 5/0
RRD on link road form 17 Mile to Rampur Dobha Mohila
RRD on link road form 17 Mile to Rampur Dobha Mohila
RRD on link road form 17 Mile to Rampur Dobha Mohila
C O Missing CD on link road to Inspection Banglow Naggar