Loading…
Loading…
19,186 results • Best match
Empanelment of Engineering Consultants for Providing Consultancy Services (Architectural, Structural, Design calculations, Etc.) for Various Building/ Bridges/ Road Works of RNB Division Baramulla.
1/ Construction of road from PHE Station to NH-IA at Kalu Chak 2/ Construction of road from Fawara Chowk to Lower Chowadhi near H/o Sh. Mubarakh Singh and Lane No. 26-B under C and T 2022-23
Refer to BOQ
Construction of GSB/Khak Bajri filling for internal/approach Roads (Development of Housing colony at watapora Bandipora)
Restoration of roads under the Restoration of roads under the jurisdiction of PMGSY Division Budhal on emergency basis Package no JK12-135,329,333,215,703,501
Construction of Road From Jindrah to Cee Gala by way of laying of WBM Gr-II and hume pipe
Please Refer BOQ
Repair of road at Lower GTB Nagar, Malik Market Jammu (Under Execution of work for Permanent Restoration under UT Capex Road Sector of Capex Budget 2025-26)
Constt of lane From link road to house of suresh kumar at W.NO.4 Panchayat -Bomal BLOCK - AKHNOOR under Grant PRI (Distt.Capex Budget) for the year 2024-25 Block Level 2nd call.
Constt. Of L/D at moh.Gatta from Link road to h/o Mohd.Yousaf w.no.01 PYT Meen Sarkar Block Bari Brahmana District Samba. under Scheme PRI Capex for the year 2021-22
Construction of lane/drain at aijal malal w.no. 7 from link road to devsthan, panchayat kaleeth, block khour under the scheme DDC plan, capex budget for the year 2023-24 (Block Level)
Upgradation of Link road Mohalla Mahiran in Km 2nd to Tola Mumtaz road by way of Providing Laying WBM Gr- II ,900 mm dia Hume Pipe Culvert and Construction of Kacha Drain
CONSTRUCTION OF LANE/DRAIN FROM LINK ROAD TO HOUSE OF RAKESH AND GEETA RAM AND OTHERS PYT MALPUR BLOCK BHALWAL UNDER PRI CAPEX FOR THE YEAR 2024-25(2nd call block level)
LANE AND DRAIN FROM THE LINK ROAD KAIRAWALI TO THE HOUSE OF RAVI KUMAR IN KAIRAWALI Pyt Chak salarian Block Ramgarh District Samba under Scheme DDC CAPEX for the year 2023-24
CONSTT OF P/W AND EARTH FILLING TO LINK ROAD TO MIDDLE SCHOOL AT SARWA W.NO. 10 Pyt Chak Salarian Block Ramgarh District Samba under Scheme PRI for the year 2023-24
Up gradation of road by way of Providing applying 2.5 mm thick retroflective thermoiplastic paint on road from Kassalian link road Km 1st to Km 3rd Under State Plan Projectaization Languishing LUP0815
Constt. Of tile work from link road to h/o Tara singh, at w.no.6 and constt. Of lane to h/o Naresh Kumar at w.no 3 Pyt. Rassoh Block Keerian Gandyal
Providing and laying 75 mm thick Wet Mix Macadam , 25mm thick OGPC with seal coat and walling on link road to Baba Narsingh Ji Sathan at Patrara (near House of Shanker Dass).
Constt and repair of C path at Village Markoli from link road to H/o late Sh. Major Singh Sarpanch W.no 5 PYT. Taloor PRI Block Sumb under PRI plan 2022-23
Improvement / up-gradation of link road from Radha Krishan Temple, Kotli Mian Fateh via Govt. High School upto Bohri connecting Bishnah-Kotli Mian Fateh road (Under Capex Budget Road Sector) (3rd Call)
Upgradation of Link road Mohalla Qazian to Masjid Chaktroo by way of Providing Laying of WBM Grade III 75 mm thick and 25mm thick OGPC thick in Km 1st RD 0-500.
CONSTRUCTION OF LANE/TILE WORK NEAR H/O RAMESH SINGH TO LINK ROAD W.NO 9, PANCHAYAT PALLANWALA LOWER BLOCK KHOUR UNDER THE SCHEME PRI PLAN , CAPEX BUDGET FOR THE YEAR 2022-23
Construction Of lane from link road to House of Murari lal,Karam chand and others and protection of House of Sh.Devinder at Nichla Pyt.Ratwana block Ghagwal under Scheme PRI Year 2024-25
const. of lane drain link road to ho dhannatter singh manhas wno 7 in panchayat gigerial block khour under the scheme DDC plan capex budget for the year 2024-25 3rd Call
Constt. Of lane from link road to onward near H/o. Sagar Chand Channi Jassu W.No.2 Pyt Sadoh Block Samba Under the scheme Capex Budget PRI for the year 2023-24
Construction of Link road Qasba Jabbrian Near H/O Mohd Yaqoob Awan,Mandi in Km 1st by way of Crated Wall ,Edge Wall Providing and Laying of 150mm thick WBM Grade-II.
Macadamization of following roads 1) Internal links of village kot Maira (Manually). 2) Link road Padli to Thakur Darwar (Manually). (under Action plan of City and Town Programme 2024-25.) (Ist Call)
Constt. Of lane/drain from link road to Moh. Jitto ram, Dhyan singh at bomal at village bomal in pyt Bomal block Akhnoor Under Head Distt Capex ( 2023-24) PRI(Pyt Level)
Construction of Lane from Link Road to main Road at w no 1,Pyt Kanyala, Block Dansal. under component PRI Grants District Capex Budget for the year of 2024-25 (Panchayat Level)
Construction of Drains from link Road Chowk to Piyush Abrol Shop No 03 Peer Mitha on Both Sides of Road Jammu (Under JSCL). Contract No. SDJ/W/57/ 2022-23 4th Call
Macadamization of Link road TSO Mohal lal and Raja Mandlik W.No. 1 and allied links of Pyt Guraha Jagir (Manually). (under Action plan of City and Town Programme 2024-25.) ( 2nd Call)
Construction of lane from Mela link road to Ram Lal s/o Puran Chand House and the street of house of Om Dutt(lecturer) with interlocking tile work ward no, 03 Dhalli
Balance work of lane from link road to h/o Jamble Singh and Punjab Singh W.No 4 Chabba, Pyt. Aithem, Block Nagrota Under scheme CAPEX (PRI componentt) For the year 2024-25 .
Macadamization of link road in Shivalik Enclave Ratnu Chak W.No. 68 near the H/o Col. Varinder Kumar Sharma and allied links (Under City and Town Programme for the year 2023-24)
Improvement / up-gradation of road by way of providing and laying of 25mm thick OGPC and WBM Grade-III 75mm thick on link road to village Chakra (Under Non Plan) (2nd Call)
Balance work for Construction of link road from HSD ji Road Km 12th to Hasti Zig NH 244 Km 99th via Drab Fagwar, Takna, Zadwan, Khuj Mohalla Mandri and Butpora Phase Ist
Permanent Restoration of by way of Providing and Laying of T-Wire Crates on Road from Food Craft institute to Ravi Dass Temple including Link Road NH to Govt. Hr. School Bera,
Construction of link road to Parkash Chand house and others ward no. 6 and Construction of lane to Naresh Kumar house and others ward no. 7 pyt Lakhri Block Nagrota Gujroo PRI
Constt of Lane from link road to NHO Dhani Ram at wno 06 Pyt Chak Bhagwana Block Bhalwal Brahmana, Distt. Jammu Under PRIs component district capex for the year of 2025-26.
Constt. of Center Drain from H/o Vijay Sharma to Link Road w.no.7 Pyt Meen Sarkar Block Bari Brahmana under the scheme CD nd pyt sec. for the Year 2024-25
Upgradation of Sanai Link road Treatment of Patches and Pot Holes by way of Providing Laying WBM Grade-II, WBM III 25 mm thick Open Graded Premix Carpet . Aggregate Length 500 Mtr
Day to day maintt. of road from Panjtirthi to Sidhra Bridge and Panjtirthi to DC Office Circular road including link road to Balram Ji Temple road towards Panjtirthi Chowk for the year
Construction of Deep central drain and providing and laying WBM-G-I 100 mm thick, G-II 75 mm thick in km 1st RD ((50-300) on Tondwah Nai-Basti link road.
Improvement of link road to Kheora Rajouri Power House road including drains in km 1sr RD 0 to 300 link to Haji Noor Hussain Km 1st RD 450 650 Under City Town
Improvement / Upgradation of road by way of Providing and Laying 50mm thick BM and 25mm thick Premix Carpet on Panjgrian to Chanti Tatora link road (UNDER CITY AND TOWN ROADS) 2022-23.
Const. of road by way of protection wall from link road to Shamshanghat at Korotana Khurd pyt Suchetgarh Block Suchetgarh District Capex Budget PRI Component for the FY 2023-24 (Block Level)
Constt of Retaining wall along the lane from link road to ho avtar singh and jagdish singh at panjtoot Panchyat Panjtoot Block SAMWAN under ABDP CAPEX BUDGET for the Year 2024-25
Single metalling on link road Mohalla Sagar Singh, Sanjay Singh Dalip Singh W No 7, Panchayat Sungal Lower B Block Akhnoor under PRI Capex Budget for the year 2025-26 (Block Level)
Construction of lane / Drain from link road to h/o Janak Raj , Surgo Devi and others at w.no. 1 , from h/o Kamal Singh to Jaswant Singh , Ranjit Singh at w.no. 2