Loading…
Loading…
19,046 results • Best match
Upgradation and improvement of road surface NHO Engineer at Fazul Haq Colony B.
Widening of road from Nh-144A Akhnoor Highway Muhti to Akalpur village Length-3.50Kms. 2.3 1.2Kms. District Jammu Under NABARD Phase-I
Concretation of from Link road to Baldev singh house W.no. 6 Concretation of from Link road to Baldev singh house W.no. 6
Development of Industrial Estate by way of Widening of Existing Main Road Construction of Approach Road PCC Drain RCC Retaining Wall and Approach Wall and Bridges with 3 yrs maintenance of Bituminous Works at Rakh Rara Swankha Samba
CONSTRUCTION OF ROAD FROM PMGSY ROAD SELI KHAD TO JALDI UNDER STATE CAPEX BUDGET FOR THE YEAR 2022-23. SCOPE OF WORK B/WALL WITH PACCA DRAIN 1NO. 0.90 DIA HP CULVERT.
Construction of road from PMGSY road to Masjid Al-Noor Mulnar New Theed Harwan at Mulnar Theed by way of providing and laying GSB WBM G2nd and R/wall at different spots.
Macadamization of internal road at Village Kalyana(L 2.00 Km) (2nd Call)
Blacktopping of internal road black topping and drain at Makwal camp Village
Re-carpeting of internal road in officer enclave at STC BSF Udhampur
REPAIR / RESTORATION OF INTERNAL ROAD AT CHENANI BAGLA OFFICE COMPLEX CEO OFFICE
Construction of internal road with side drain at MRF centre Kherepora Kokernag
Recarpeting /patch work of internal road at BCS Rambagh Campus Srinagar JandK
Construction of road by way of providing and laying of WBM Grade-II and III, 20mm thick OGPC including construction of Pucca Drain on link road to Krail village (Length 250 Mtrs) (Under ARD)
Magarkote to Block Boundary Ukhral Road PMGSY III Package No JK193002 Length 5.133 and Hewagan to Danmasta road Package No JK04457 Length 9.20Km Total Length 14.33 Kms.
Construction and Maintenance of Road from L035-(Link Road) Kainthgali To Bariote Road KM 16th to Shergali via Dubkabag Pkg No. JK14-4502, PMGSY-IV, Batch-I of 2026-27, Block-Moungri, District Udhampur(Using Waste Plastics 10.000 Kms)Length 10.000 Kms
Balance work for construction of road from Approach road Ujhan Bridge by way of Providing and laying WBM GR II 75 mm thick each and WBM Gr III 100 mm thick WMM 25 mm thick OGPC over 50 mm thick BM(under NABARD).
Upgradation of internal roads of ward no. 47 by way of laying WBM in patches and 25MM thick premix carpet in ward no.47 Jammu.
Macadamization of Internal roads of Kashmir Government Polytechnic Gogjibagh by way of bituminous macadam and 25 mm thick Semi dense bituminous macadam with seal coat.
Improvement of Internal roads (Constt of Culvert and Edge walls along road from CFC to Ditch at Jar Abtal PYT MALSHAH BLOCK RAMGARH DISTRICT SAMBA
Restoration Maintenance of roads under the jurisdiction of PWD RNB Division Thathri 1. Thathri Badanoo link Road L 6.28 kms 2.Jangalwar kahila link Road L1.00 km 3 Baba Budi Das link Road L2.50 km 4. Upper Thathri lower thathri lin
Removal of Potholes on link road to Govt. High School Bhatyari and Link road to village Bhatyari via Shamshan ghat and Link road from Bishnah Ram Bagh to Varidh Ashram Kundeshwar (Under Action Plan 2023-24 for Potholes Free Roads Programme)
Construction of link road from Purkhoo to shamshan ghat including link road near tile factory Barat mohalla and allied links protection work of road from shamshan ghat to mohalla Bakashi including link road purkhoo to Barat mohalla and allied links a
CONSTRUCTION OF LINK ROAD FROM IRRIGATION KUL TO HOUSE OF KAKU RAM JHIRI CONSTRUCTION OF LINK ROAD FROM HOUSE OF SARPANCH GARHI TO HOUSE OF SHAM LAL INCLUDING LINK ROAD FROM MARH STADIUM TO LADORE AND SHAMSHANGHAT GARHI TO TOKERIYAN
1/ Link road to Babliana from Canal to Atta Chaki and road adjoining Panchayat Ghar Babliana. 2/ Link road to Village Shergarh from Jeevan Nagar Murallian road via Peer Baba. 3/ Construction of link road to Dharap from Jeevan Nagar
Auoti Massri to Karlie via Thilroo Jagrote link road (L 6.00 Kms), Motorable Bridge Malnai to Hr. Sec. School Beeraru (L 0.20 Kms), Chakrabati to Barasoo link road (L 4.10 Kms) and Malnai to Chakrabati link road (L 10.00 Kms)
As per NIT/BOQ
Gathi Gurakha road Km 4th to Village Himote via Lalha link road (L 2.250 Kms) and Chattra to Gathi Gurakha link road (L 5.00 Kms)
Costruction of lane drain from link road to H/o Iqbal Singh w. no. 1 and lane from link road to h/o Om Parkash
Restoration of roads under the Jurisdiction of PMGSY Division Kathua G5
Restoration of roads under the Jurisdiction of PMGSY Division Kathua G7
Permanent Restoration of PMGSY Road Guzzer to Gurinal
Permanent Restoration of PMGSY Road Phalgwara to Khawara
L/D from banjir moh. To PMGSY road
Restoration of road PMGSY Dalera to Mukhayala Ziart
Const. of road from PMGSY to gagee mohalla
Pacca lane from PMGSY road to FCI Store
Constt of Road PMGSY Road Mangiot to Seyal
Pacca lane from PMGSY road to FCI Store
T/Road Siyari Road to PMGSY Road Chityali
Permanent Restoration of roads from PMGSY Division Ramnagar
CONST OF FOOTPATH MASJID USMAN TO PMGSY ROAD
PMGSY road Janglwar Sarsi Km 12th to Satwas
Repair of Road Pulli to Gurdwara Sabh
Upgradation of Hajinar link Road by way of cross drainage
Constt. Of Link Road from main Road to HO Mushtaq
Macadamization of link road from Sarore Adda to Chouhan Mohalla.
Construction of link road to Rakh Arnia (Under Capex Budget)
Upgrade of T Road link road khorinar to panch mohalla
mprovement of Karwanda to Burn Brahmana link road District Jammu