Loading…
Loading…
3,425 results • Best match
Puttur CMC limit Ward 01 Interlock work on residual road bifurcating from Keerthana hotel main road Nehru nagar Asphalt road work on Raktheshwari road Railing work and drain work in Lingadagudde steps Drain work across Shevire road Drain work near Sundara Sapalyas house Drain work and Road development infront of Raktheshwari katte
Ward No. 1 CC road construction work from Nataraju House to Tirumala Main Road, Ward No. 2 Srirama Palace Road to Nataraju House and from Srirama Palace Road to Parimala House and Ward No. 7 Late Nijaguna House to Ramachandrappa House (Ganesh Layout) asphalting work
Construction of RCC Gutter and C C Road From Gullappa Asude house to Road Construction of CD Near Ambedkar Statue and Laying Concrete near Ambedkar Statue at 12 no ward 2 Short Fall Amount of Construction of drain From w no 16 and 17
Providing Services of AC-ToyotoEtios/ Swift Dezire/Mahindra Verito vehicle Model not earlier than 2020 on hire basis for the use of Assistant Executive Engineer, PMGSY Project Sub Division,KR Pet
Construction of drain at Heritage 1st cross Nazeer house road in w no 16, Construction of road at kannda school back APS Tangal house to Jamal house road in w no 17, Asphalting of road Infront of Ambedkar Bhavan road and Francis house to Arunakka house in kalludoddi, Indira gandhi layout w no 18 cmc ckm
Ward no. 1 Construction of concrete road near Vivekanagar Kagala Masta house. Ward no. 3 Siddinabavi 4th Cross road work in progress, Development of Gummanakeri Road near Sripada Shetty Houses and Uppinaganapathy Temple in Ward No. 7 Muslimgalli, Ward No. 11 Devaki Krishna Colony Interlock installation from main road to Battara Mane.
construction of CC road in ward no 1 soppugudde nadthi infront marikamba sabha bhavana and providing interlocks in police quarters nead nagara bhana road. And construction of CC road in ward no 5 parvathi lay out infront vasim house and Anganavadi ... and road works in ...
Annual Maintenance of 1)Mittikellur to Maraladinni road KM 0.00 to 6.00 2)Maski- Hutti MDR to Huvinabhavi approach road from km 0.00 to 2.80 3)Maraladinni Tanda to Mudagal-Maski SH-14 From Km 0.00 to 8.00 4)Maski - Alabanur road via Balaganur, Goudanabhavi , Javalagera road from 0.00 to 2.10 5)Maski-Hutti via Pamanakellur from Km 0.00 to 4.40 6)Ankalimath-Medikinal road via Nagalapur, Talekhan from Km 8.00 to 22.28 And 23.61 to 25.50, 26.00 to 26.60 7) Timmapur cross to Pikilihal from Km 0.00 to 9.00 8) Maski to Kunikellur via Maraldinni road from Km 0.00 to 8.00 9) Benakanal cross to Bailagudda from Km 0.00 to 9.00 10) SH-20 to Gudihal appraoch road from Km 0.00 to 4.00 ( In Selected Reaches ) 11) Muddapur Cross To Antargangi Road Via Poolbhavi, Bappur, Hanchinal, Gudugaldinni, Hampnal, Nanjaldinni, Nagarbenchi . In lingasugur taluk of Raichur district Under 3054 (Non-Plan) MDR Road Maintenance For the Year 2025-26.
cc road
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works
Annual Maintenance of MDR 1)Inamhongala to Nanagundikoppa road km 1.90 to km 5.80, 2) Dharwad Chandanmatti via Kavalgeri km 1.9 to km 9.50, 3) Link road between Amminbhavi Shivalli road to Morab Shivalli via Vanahalli km 0.00 km 2.25,km 4.15 to km 5.7, 4) Shivalli Hubli Road (Up to Taluk Border) km 0.00 to km 2.50, 5) Road from Hebballi to taluka border km 0.00 to km 2.10, km 2.6 to Km 9.00 in Dharwad Taluka of Dharwad Dist For the year 2025-26 (Reserved Category for Scheduled Tribe)
Annual Maintenance for the year 2025-26 to MDR of a)Bolavada Kyathanal-Gadisomnal-Kodaganur-gundakanal-Salavadagi km 0.0 to 14.0 & km 17.34 to 19.35 b)Belur-Navadagi-Salavadagi km 0.0 to 4.0 & km 8.65 to 10.70 c)Maskanal link Road km 0.0 to 6.0 d)Bilebavi-Gundakanal km 0.0 to 9.0 e)Lakkundi to SH60 link km 0.0 to 1.63 f)Gotakunaki Bantanur Peerapur Km 0.0 to 2.20 & 4.43 to 7.0 g)Talikoti Gadisomanal Tumbagi km 0.0 to 6.0 & 8.23 to 17.75 h)Talikoti town limit Road km 0.0 to 0.5 inTalikoti Taluk
RCC Road work from Subramani land to the Waste Disposal Plant (Kasa Vilevari Ghataka) in Billapura village.
Asphalting at ward no 09 B M Shree road Kanaka extension junction to Prathima house Construction of RCC drain at ward no 10 Basaveshwara street and Amanni road inbetween conservancy road and near Marrigadduge circle to behind Sringeri Sharada Bhavan ... Mat road Construction of ... house road Construction of ... Aralimarada road Construction of ...
Improvement to road from Rakshidi to Mavinakolu village Kumbaradi to Chikkatota and Kumbaradi to Temple in Baramakki village Matadiene village Malali village Halebelur Siddapura Basaveshwara Temple road asphalting and drainage construction work ... CC road work in ...
Maintenance of Bridge
Road and drain
Construction of CC Road
ROAD AND DRAIN
ROAD AND RCC DRAIN
ROAD AND RCC DRAINS
Development of road to Tatanda Roshan house in New Extension Thimmaiah Layout, from CM Gangadhar house to Cheriyatanda house in Kirti Layout, from Maletir Mittu house to Bachira Dali house, from Subramani s hiuse passing road in Thimmaiah Layout, ... and construction of road to ...
Construction of cc road and drain in ward no 01 and 02 at Kodla village, construction of cc road and drain in sc colony at Hulgol village, construction of road to Hulgol kall road in sc colony at handarki village and Construction of cc road and drain in sompalli village in Sedam Taluka under KKRDB for the year 2025-26.
Hubballi Division: SW-I) GDG-HG Section: Construction of Limited Height Subway in lieu of LC No.13 Km 26/100-200 in between BLR-MLP Station respectively by BOX pushing method. SW-II) GDG-HG: Construction of Road under bridge in lieu of LC 125 at KM 277/5-6 in between TVL-HG station respectively.(Maintenance period-12 Months)
Improvements to Road, Construction of Cement Concrete Road, Drain and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road, Drain and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road, Drain and Cross Drainage works.
CC Road construction work from Ward No. 4 Gejjemaraiahs house to the main road, from Ward No. 5 Mohans house to Nagarajus house and from Narayana Swamys house to Ranganath/Siddarangaiahs house, and in Ward No. 9 from Lingarajus house to Basavanna Temple near Hospet Circle of Magadi municipality
Providing Laying and Construction Of UGD Pipe Line and road development work in Ward No 05 22nd Cross Road, Construction Of CC Drain and Covering Slab in Hoysala Nagara Police Quaters Nagaraj House Front and Development Of Park in ward No 25 Panchamukhi Circle in Hassan CC Limits
Ward No. 5 Shakti Shamil Road Construction of CC drain from Mahantesh Mane to Eknatheshwari Temple Road and construction of deck near Yelavatti Mane.Ward No. 6 Madiwala Deck construction near Prabhus house and CC drainage from Hotel Hanumanthappas house to Prabhus house and CC drainage construction behind Jyoti Talkies
Improvements to Road & Construction of Drain SH-171 Maharashtra Border Hinchagera in Indi Taluka of Vijaypur Dist. to Google Barriage in Raichur Dist. Km 172.00 to 177.90 (Vijaypur Main Road to Nelogi Selected Reaches) in Jewargi Taluka under 5054 Appendix-E SH Renewal for the year 2024-25
Construction of concrete drain and installation of slab near Swadisht hotel right and left side road in Bannanje ward, Construction of concrete sanjeeva poojary house to charli house road, Construction of concreteputtur mahalingeshwara temple road and 14th cross arunodaya house to gururaj house road in subramanya nagara ward
Package-(9) (1)Road Construction from Marulasiddappa house to Tippeshanna house in ward no.18 Ashraya badavane in Tarikere town. (2) Road asphalting and construction of CC drain of Dhavanraj house and construction of remaining portion of CC drain near Dharanesh house in ward no.18 in Tarikere town.
Construction of concrete near kadiyali temple shet house to tulasi teacher house road, Construction of retaining wall opposite kamala bai hotel road in Kadiyali ward Construction of hump opposite volakadu government higher primary and high school road and Construction of concrete culvert opposite infra distributor road in Kinnimulki ward
Package 4 Ward No.19 near Marutinagar concretization, Ward no. CONCRETE roadCONSTRUCTION FROM 06 PINGE MAIN ROAD TO SAYYADA MANJIL HOUSE,Ward no15 Construction of concrete road from Mahadevasthan main road to Pradip Kadamba house Ward no17 Concrete ... Concrete road construction from ...
Construction Of drainage work from Mudaka house to Hugara house, drainage construction work from Bendre house in Vakil Chawl to Prakash Patil house, paver road construction work from Godekindi house in Vakil Chawl to Kulkarni house, and the installation of mini high mast lights In Ward No 13.
Development work of Mavinakere Park under Raichur Municipal Corporation (road work, foot-path interlocking fence work and installation of decorative electric poles and electric lights, childrens play equipment, high mast light, chain link fencing work and other works on the bank of the lake, installation of benches, installation of gates and welcome arch work and coloring of existing statues.
RCC Drain repair and RDwork from Billapura village main road to Krishnappa house, under the jurisdiction of Billapura Gram Panchayat, Anekal Taluk
Repair works to compound wall
Reconstruction
ROAD
cc road
Improvements to Road, Construction of Cement Concrete Road, Asphalt Road and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road, Asphlat Road and Cross Drainage works