Loading…
Loading…
17,300 results • Best match
CONSTRUCTION OF DIGHAUL TO SEMARIYA APPROACH ROAD ( LENGTH 1.0 KM) AND NH-135 (PANCHAYAT BHAWAN) TO SARAI SENGER BASTI VIA HANUMAN MANDIR APPROACH ROAD ( LENGTH 1.50 KM) TOTAL LENGTH 2.5 KM SUB DIVISION MANGAWAN
COSNSTRUCTION OF BLOCK RAIPURKARCHULIYAN VILLAGE PNDI APPROACH ROAD (RAMASHRAY KUSHWAHA HOUSE TO KEMALA KEWAT HOUSE) LENGTH 2.50 KM, BLOCK RAIPURKARCHULIYAN VILLAGE BADWAR TAMRA ROAD TO KASINATH PATEL HOUSE VIA, BADWAR KOLAN TOLA APPROACH ROAD
Strengthening of Road From Hathighat to Naharkheda Road Length 1.810 Km
CONSTRUCTION OF ROAD AND DRAIN AT KHASRA NO 7-891, 7-827 WARD 50 ZONE 10 second call
Construction of Roads under CM INFRA PHASE 4 In Shajapur ULB
Construction of Roads under CM INFRA PHASE 4 In NALKHEDA ULB
Construction of Roads under CM INFRA PHASE 4 In NALKHEDA ULB
Construction of Roads under CM INFRA PHASE 4 In NALKHEDA ULB
SR, MOW and Repair of Nagdwari approach road, repair of sheds, repair of railling, minor repair of buildings at Pachmarhi. 1st Call, PAC Rs. 19.45 Lacs on Road Bridge SOR 25.03.2022, Building SOR 01.01.2024 (Ammendment upto date), Completion period
PROPOSED BOUNDARY WALL AND APPROACH ROAD AT GIRLS HOSTEL AT PT KHUSHILAL SHARMA GOVERNMENT AUTONOMOUS AYURVEDA COLLEGE AND INSTITUTE AT KALIASOT ROAD BHOPAL
REPAIR/RESURFACING OF ROAD INCLUDING OTHER CONNECTED WORKS IN ADM AREA AND DEPOT AREA AT 15 FAD JINDRAH UNDER UNDER GE (ARMY) DHAR ROAD UDHAMPUR
Construction of approach road in choti balkhandan mata mandir Pahariya under road subdivision Damoh 450M
ASAHPHALTING STRENGTHENING OF ROAD KALI BASTI LAL MASJID IN WARD NO.09 ZONE NO.05
Construction of CC Road (Strengthening) from Bhadbhada Main Road to Imali Chouraha Under Kayakalp Abhiyan in Nasrullaganj
WIDENING OF ROAD INTO FOUR LANE FROM DARGAH SHARIF TO BHOPAL TIRAHA IN RAISEN TOWN PORTION LENGTH 3.500 KM
REPAIR OF ROAD WORK FROM KM 44/200 TO 44/400 ON NH 135 B SIRMOUR DABHOURA ROAD ( BARDAHA GHAT PORTION ) UNDER NH SUB DN REWA
REPAIR OF ROAD WORK FRO KM 42/800 TO 42/1000 ON NH-135 B SIRMOUR DABHOURA ROAD ( BARDAHA GHAT PORTION ) UNDER NH SUB DN REWA
Const. Of Sirwad Nahar Puliya to Thana Chouraha to Indori Chowk and upto Kuthariya ,Widening of Road and Construction of Road Devolopment work, Length 2.70 Km. PAC Rs. 677.09 lacs First Call on Road and Bridge SOR 25.03.22 work period 240 days
Repair of damaged portion of Hoshangabad byepass road, Raisalpur approach road, Nimsadiya approach road under Sub Dn. Hoshangabad. 2nd Call, PAC Rs. 19.77 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 120 days.
Special Repair work of Bharroli Approach Road Damaged Portion in Km 1/2 and Construction of 2 Row ( 1000mm dia NP-4) at Koharwas Approach Road in Km 1/2 under Sub Division Ashoknagar MP
B.T. Renewal Work on Kota Naka Approach Road Under AR Maintenance Work in Kolaras Length 1.80 KM and B.T. Renewal Work on Manipura Approach Road Length 800 M Total Length 2.60 KM Distt. Shivpuri (M.P.)
CONSTRUCTION OF 1. JIRAPUR TO CHAUSATH YOGINI MATA TEMPLE ROAD L. 1.40 KM 2. CHAUSATH YOGINI TEMPLE TO BEDA VILLAGE APPROACH ROAD L. 0.90 KM 3. SIDHESHWAR MAHADEV TEMPLE JUGGA APPROACH ROAD L. 0.30 K.M
CONSTRUCTION OF CEMENT CONCRETE ROAD WORK AT NARAYAN NAGAR W73Z16
CONSTRUCTION WORK OF ROAD WORK 1. KANAKAD TO MANNAKUAN APPROACH ROAD LENGTH 1.70 KM 2. KATTHIWADA C.S.A. NAGAR TO CHHOTA KHUTAJA KORIYAPAN MAIN ROAD LENGTH 3.20 KM 3. ROLIGAON MAL FALIYA TO BARJHAR CHHOTA KHUTAJA ROAD
ROAD WIDENING FROM GADI ADDA SQUARE TO VIA DHANCHA BHAVAN RANKESHWAR MAHADEV MANDIR MR 4 ROAD
Construction of W.B.M Road From Road Widening From Hirrwah School To Stadium At Ward no 43
ROAD WIDENING WORK FROM MAKODIYA AAM NAKA AGAR ROAD TO KANIPURA ROAD VIA VIRAT NAGAR (UJJAIN)
CONSTRUCTION OF CC ROAD WIDENING DIVIDER AND CENTRAL LIGHT WORK AT MUKTIDHAM TO OLD AB ROAD
ROAD WIDENING AND DIVIDER CONSTRUCTION WORK FROM TIVNI MOD TO BANSAL BASTI IN WARD NO 03
Road Widening and construction of drain from rewa bag turn to pathankua in w.no.35 dewas
Construction of Road Work Jagepur Gadola Barada Amlighat Inclding Pole Shifting Work Length 4.80 Km I/c Electric Work 2nd call
Construction of Road Cross and C.C. Road Work at Asad Bhai House Congress Nagar in Ward No.14, Zone No.05
Construction of Gadariya Kheda PMGSY to Samanapur Muhas PMGSY Road Length 1.50 Km. Under Sub Division Narsinghpur.
Construction of internal road and Misc. civil works at ONGC store , Damoh , Madhya Pradesh
BT Renewal work on Umarkot Approach Road Length 0.60 km. Under PWD Sub Division Petlawad
Construction Work for Repair and Maintanance of approach Road At Mandi Yard Dalauda Distt. Mandsaur
CONSTRUCTION OF BHAMARA TO MAUHARA APPROACH ROAD LENGTH 1.60 KM. SUB DIVISION NO.3 REWA
B.T. Renewal work on Civil Line Approach Road Length 0.800 Km. Under Sub Division Satna
nirman karya gram neemach to arrordri approach road length 3.00 k.m. i/c pole shifting
C.C. APPROACH Road for rest house and Godown at APMC Chakghat dist. Rewa (16.51 lacs)
Construction of Slab Culvert 2 Span of 6 Metre on Dhamanar Nai Abadi Approach Road
CONSTRUCTION OF NASTIGAWAN TO KANTI KANCHANPUR ROAD (DEOKHAR TO KONI APPROACH ROAD) LENGTH 4.00 KM.
Construction of cement concrete road from shamshan ghat to gaushala approach road under kayakalp abhiyan
Bituminous In old CC Approach Road In Grain and sabji mandi prangan Ratlam (Second Call)
Construction of Cement concrete Approach Road on Adarsh Eklavya Residantial School at Mordundia Block Ranapur
Construction of Cement concrete Approach Road on Adarsh Eklavya Residantial School at Chainpura Block Meghnagar
Special Repair work Approach road and Culvert in Km 3/8 of Aroliya Kurawar road
Construction of Pipliya Jodha to Dhodhar Approach Road Length 3.90 Km Including External Electrification Work.
B.T. Renewal of SH-31 Dhar Nagda Road to Collectorate Approach Road length 385 Meter
Construction of CC Road in Ward 09 Approach Road to Muktidham at Kheda. (Vidhayak Nidhi)