Loading…
Loading…
3,50,488 results • Best match
Road widening infront of weigh bridge near packing plant
Road widening at Bonde layout in Pr. No. 20
ROAD WIDENING OF SHANTI NAGAR GAIL INDIA TO NEELGANGA
Road Widening from C.Camp Circle in Ward No.23
Road Widening work at Sadhbhawnanagar and nearby area Sriganganagar
Road widening and repair works at Mathura Refinery Nagar
321/25-Maruthinchira Pathayakallu Road widening -In Marakkara Gp
ROAD WIDENING FROM KENAPARA ENTRANCE GATE TO LOHSARA TIRAHA
Construction of CC Road Widening at Gaytri Mandir Tiraha.
ROAD WIDENING NEAR TO MAIN CANTEEN AT LPSC VALIAMALA
Puthucode GP 2020-2021-Arangattukadavu road widening and retarring
Road widening at different places of ward no.38
Road Widening work at various places Sadhbhawnanagar Sri Ganganagar
Road Widening work from Hanuman Naka to Hari Phatak
Preparation of DPR through outsourcing for Road Works under PMGSY-III, Batch-II of 2023-24 in the District of Uttar Dinajpur.
1) Construction of approach road at Godyachapada to Vaishakhare, 2) Construction of approach road at Savatyachapada to Ekalahare, 3) Construction of approach road at Mohawadi (Vaishakhare) in Taluka-Murbad, District-Thane. (Under 5054 Tribal Work)
STAGE CONTRACT FOR Rainda link road, Gatha Gwari link road, Udrana Gwari link road, Fish Pound to Shiv Mandir link road, Old Bridge Chakka road, Fish Pound to Shamshan Ghat link road
Renewal of Amriti Uttari link road, Amrti Dakshini link road, Ram chandar Prajapati ke ghar se Pure Mannuram link road,Dhanapur link road ka shesh Bhag, and Tala Railway Feedar link road
Sevanpur Link Road, Lodhan Tola(Sevanpur) Link Road, Khiron Bazar to Monu Shukla ke ghar tak Link Road, Fatte Saheed Baba Get to Majar tak Link Road and Pure Avsheri Link Road
Annual Maintenance Plan for the year 2020-21 for Rural roads (Non PMGSY State road) on Ghawandal to Sh. Naina Devi Ji Bus Stand road Km. 0/0 to 1/600 (VR0192) (SH- Providing and laying 30mm thick bituminous concrete).
A/R and M/O various PWD roads under Sub-Division SER-11 of Division SER-1 during 2022-23. SH Repair of road and footpath at various places damaged on Internal Roads at Sri Niwas Puri_Recall
Repair of Internal roads (Patch work) at various location in Sector-8 at IMT Manesar.
Construction of temporary coal transportation road from seam-III to seam-II , approach road to mine sump, strengthening of road from seam-IV to seam-III and diversion road near Rakash village junction at Jagannath colliery under JA(Monsoon activity).
Providing Street Light On Existing At Internal Roads Providing Solar panel For School Providing Led Street Light On Existing At Internal Roads At kamangaon Tq Bhokar Under 14th Finance Commission yojna 2020-21
Strengthening of Road From T.Sedapatti Burial ground in T.Rajagobalanpatti Panchayat under MLACDs 2025-2026
Construction of Remaining Approach Road near 7th IRB Bn., ISTC, Kapurthala.
Construction of Approach Road for Golapganj 33/11 Kv Sub-Station
Guidance Enhancement Works in Rural Roads Sanctioned under NABARD- RIDF-XXXI-2025-26 in Tiruppur District
Rehabilitation of Rural Roads MDR, ODR and VR Under RJ-08-05 RIDF-25/2019-20
Renewal work with general repairs on rural Roads in the year 2020-21. (SL. No. 2)
Renewal work with general repair on rural roads in the year 2020-21. (SL N. 2)
Patch work of rural roads under construction block PWD Balrampur Development Block Gaindas Bujurg 2023-24
Patch work of rural roads under construction block PWD Balrampur Development Block Gaindas Bujurg 2024 25
Renewal work with general repair of rural roads in the year 2021-22. (SL No -2)
Renewal work with general repair of rural roads in the year 2021-22. (SL No -3)
Rural Roads Maintenance - 2025-26 - Erode Block - Vannankattuvalasu to Pudupalayam road KM 0/0-0/200
Renewal work with general repair of rural roads in the year 2021-22. (SL No -5)
Rate Contract for Patch Repair work on MDR and Rural Roads in Sub Dn. I Mertacity
Guidance Enhancement Works in Rural Roads Sanctioned under NABARD- RIDF-XXXI-2025-26 in Tiruppur District
Renewal work with general repair on rural roads in the year 2020-21. (SL N. 1)
Patch repair work on ODR roads under Lagislative Assembly of Agra South and Agra Rural Roads
Pot holes and patch repair work on rural roads located under the development block Kada area
Rate Contract for Patch Repair work on MDR and Rural Roads in Sub Dn. Riyan Badi
UR to rural roads under the jurisdiction of R&B Section, Khammam Urban in Khammam District
Renewal work with general repair on rural roads in the year 2020-21. (SL N. 3)
Construction of various Rural Roads in District Jodhpur. Package No.RJ-21-01/303 works/2023-24
Maintenance of MDRs and Rural Roads in (R&B) Section, Gannavaram for the year 2018-19 .
Maintenance of Rural Roads in (R&B) Section, Ravulapalem for the year 2018-19 (Package-2).
Maintenance of MDRs and Rural Roads in R&B Section Chintoor for the year 2020 21
Maintenance of Rural Roads in (R&B) Section Ganapavaram for the year 2018-2019 P-2