Loading…
Loading…
3,50,488 results • Best match
Construction of Barcholi Approach road Length 1.60 Km
Construction of Ramgarh Approach road Length 2.40 Km
const of toilet and approach road at Khood
A Resurfacing of road near residual propellant disposal area Building No 146 147 170 and Disposal Bed 1 2 and 3 SMPC Unit 01 and B Carrying out road repair with SDBC and repairs to side berms of road from STEX area to SPROB area SDSC SHAR
Widening and strengthening of road from Kalsa to Dera Bazigran (Road ID 7882) in District Kurukshetra under PD-1, Kurukshetra Widening for strengthening Strengthening of Road Widening and strengthening of Brahampuri Approach Road (Road ID 7838)
Construction of Road Work Ward No.31 Various area at Municipal Board Chhabra
Proposed construction of road work from Chhatrapati Shivaji Maharaj chouk to Gayakwad Patsanshtha
Construction of Road Work in Magaswargiya Wasti At Medshi Tq Malegaon Dist Washim
Proposed construction of Road work from Laxmi Mandir (Maptemla) to Vilas Satarkar house.
Construction of Road Work in Vrindhavan Dham Gali No.-3 Rev. Ayad. 6009
Proposed construction of Road work from Nangare house to Lokhande house at Nangaremala
Proposed construction of road Work from Prakash Shinde house to Pandurang Mejor house.
Construction Of Road Work in Village Tondhe Primary School To Adoo Nagria Village
Construction Of Road Work in Village Paindapur GramPanchayt Magda Sanju Home To Road
Proposed construction of Road work at Dhandormala from Nilesh More house to Odhapatra.
Construction of Road work from Rukade Kaman to Sagar Jewelers to Gorde Chouk.
Construction of Road work From Gorde Chouk to Ekveera mandir (School no 9)
Construction of Road work from Bhimrao Bapu Chouk to Mirajves to Sagar Jewelers
Proposed Construction of Road Work from Wadkar Shop to Basugade House (Lande Plot)
Construction of Road work from Radhika park (Atugade House) to Sangli- Islampur road
Proposed Construction of Road Work at Thote Galli, Deshmukh Galli and Aawati Galli
Construction of Road work and R.C.C. Gutter work from siddharthnagar to Ligade mala.
Proposed construction of Road work from Dadaso Kalel House to Ikbal Tamboli house.
Proposed construction of Road Work at Mahatma Gandhi Housing Society ward No 04A
Construction of Road work at Nagathane road (School No 9 to Tasgaon road)
Construction of Road work from Lodrava road to Sam-Medical College new road
Construction of road work in LIG House near naidu nagar ward no.09
Construction of road work in MIG House near Naidu nagar in MCC Limits
Construction of Road Work at Near Siddappa Koppada Land Hedigonda Village Under MGNREGA
CONSTRUCTION OF ROAD WORK AT NUKAPURA VILLAGE NEAR PARASAPPA LAND UNDER MGNREGA SCHEEM
Chinchwadi Minor Irrigation Project, Tal. Rajapur, Dist. Ratnagiri. Construction of Main Dam and Service Gate approach Road
Construction of road from J.A road to Seri Panditan, Bhalwal link road, Amb link road by way of providing and laying wet mix macadam, 50mm thick BM, 25mm thick OGPC and 30mm thick SDBC
Road strengthening work by BC from Mukesh shop to Mill Gate and the lane of Hindu Kanya Inter College on Mill Road under Municipal Council Shamli.
From CC Man Sirsi Link Road to Thakur Ji Rabdo Ki Dhani, Village Beed Hathoj.
IMPROVEMENT TO AKOSHI LINK ROAD V.R.227 CH 0/000 TO 1/500 TAL-WAI
Repair to H.L.Bridge over Kharkhara Nallah at 5th Km on Khariar Rd - Saliha -PMGSY- Road Road Pathole repair of approach road PMC and SC ,Colouring for the bridge portion 5.200 to 5.700
Renovation work along with Annual repairs in Km-1 (900) of Bharanwadih (Bhardih) link road from Km-5 of Ramvapur Belwa PMGSY road to Semra settlement.
Construction of 44337 mtrs long span over Seer Khad at Km 10800 on link road Bassi to Sarakaghat under PMGSY 3 Batch I Package No HP03171C
Construction of Padrauna Jataha Ke Km. 5 (Pachpheda Pul) se Mansa Chhapar Dumri PMGSY Tak Link Road under Rajya Sadak Nidhi during Financial Year 2017-2018
UP-GRADATION OF LINK ROAD SHRI HARGOBINDPUR ROAD, NAINEKOT, LADHUPUR, KIRI AFGANA, UPTO KAHNUWAN GOREWAH ROAD under PMGSY-3 Batch-III Package No.PB06120 in District Gurdaspur.
Re-Construction of Itahiya PMGSY Road to Samodhar Hadahawa tola Link road in Year 2023-24 District Mahrajganj Lot No 2 of 2 Maintenance 5 Year
Constt. of lane from link road drab near handpump towards the H/o vijay kumar and lane from PMGSY road to Ami chand house wno 1
Improvement Upgradation of link Road form PMGSY road to Khati Mohalla Poshkar via PDC canal by way of Macadamization under CnT Machine Mix Laid with Paver.
S.H. 26 Ke Km. 396 se Bayen Narkhoriya Katekhaira marg ke Km. 2 se Banye PMGSY Bangavan Marg se Primary School Hote huye Umarbhariya Link Road
Improvement Upgradation of link Road form PMGSY road to Khati Mohalla Poshkar via PDC canal by way of Macadamization under CnT Machine Mix Laid with Paver
A/mtc of Internal Roads in Sector 110A Gurugram Providing and laying of SWD line 400 MM for construction of Entry of 24 mtr Road in Sector 110A Gurugram
Notice Inviting On-Line offers from cosultants for updating of the GIS based District Rural Road Plan (DRRP) and Prepration of Detailed project of Roads/Bridges (D.P.R) undr PMGSY-III
M/o Road (Repair of Roads alongwith Sector-15 Metro Station infront of SPS Sector 15 and R/o Nala Wall near Petrol Pump Sector-15) on DSC Road Noida
Providing approach Road (BT) to Pudhupalam Bridge
Shifting of MSEDCLs Cables obstructed in missing link road construction work near Rabodi Nala under Uthalsar Ward Committee.