Loading…
Loading…
3,50,071 results • Best match
Construction of Road and Pathway from internal road to Gurudas Parwar, Molu Parwar, Daulat Parwar house at Parwarwada in W.No.6 in V.P. Querim Ponda Taluka.
C/o RCC Retaining wall, Road Repair and Protection Work in approach road of Culvert of Kurara Manki Road at km 45
Construction of Trolley Shed and Internal road work at mandi yard Kailaras Distt. Morena IInd Call
Internal road work at Sports Pavillion, Marine Lines and Fort Campus, University of Mumbai, Churchgate, Mumbai
Providing and laying paver block on the internal road work Paradip DGPS station and Lighthouse, Odisha
Construction of Boundary Wall and Internal Road Work for Judicial Officers Residences at C-49, Jodhpur
Maintenance of Rural Roads-Pot Holes From Thuvarankurichy - Nallur Road -Eraniyapatti Road KM 0/0-2/400 (R-98) Maintenance of Rural Roads-Pot Holes From Karadipatti Road KM 0/0-1/000 (R-58) Maintenance of Rural Roads-Pot Holes From Thuvarankurichy -N
Maintenance of Rural Roads-Pot Holes From Amanakkampatti To Kavalkaranpatti KM 0/0-2/400 (R-13), Maintenance of Rural Roads-Pot Holes From Kodumbapatti To Sedipattarai Road KM 0/0-1/000 (R-309), Maintenance of Rural Roads-Pot Holes From NH 45B Road
MMNPPNA_23_24_159 (i) Improvement of Road from NT Road to Satsang School.( Disang Dong Road) (Ch. 0.00 m to 215.00m), (ii) Construction of road from Kamalakanta Khetra to Mujjamil Haque Link Road (Ch. 0.00 m to 320.00m), (iii) Construction of Se
Construction Of Kondhai Yehala Approach Road VR-148 Length 2.900 KM in Part 1/440 to 2/900 Tq. Pusad Dist. Yavatmal
1.Maintenance of Rural Roads-Pot Holes from GST road - Seedeveimangalam road 0/0 -3/4 (R 36) 2.Maintenance of Rural Roads-Pot Holes from Varadharajapuram - Edumalai -Perahambi Road 0/0-2/0(R-173)Rural Roads in Mannachanallur Block of Tiruchirappall
Remettling and Carpeting Internal Road Work of Shivalik Apartment Sector 4 I G Nagar Jaipur
Construction of Road from P.W.D Road Talapara to Karmahi PMGSY Road (L-2.390 Km.)
Construction of road from PMGSY Dassal Upper Gujran to Dassal Gali via Jattan Mohalla
Construction of road with PCC from PMGSY road to Masud house at Sahapur Sansad
Construction of Road from Gomadighi Pmgsy to Tikramgachh Haat Via Belchori under ISLAMPUR Block
Construction of Road from PMGSY Road Kotalpokhar-Pakur Simana Road to Mehdipur (L-1.680Km.)
Construction of Road from PMGSY Road Naitand to Naitand via RCD Road (L-1.700Km.)
CONSTRUCTION OF ROAD FROM CHUTIA BALIGARH PMGSY ROAD TO PANCHYAT BHWAN (L-3.800 KM.)
Construction of Road from Kotar Pmgsy to Kabarsthan Via Eid Gaha under Itahar Block
Construction of Road from Raghunathpur Main Road to Jadupur PMGSY Road (L-1.050 Km)
Construction of road with PCC from PMGSY road to Nanil house at Patharbari Sansad
Construction of Ghambir mughlan Khul damaged by PMGSY Division Rajouri during construction of road.
Construction of Road Protection wall from Dakshin Sajiyara PMGSY Road to Kanu Roy House
Construction of road Missing Link Between Madoon to Connect PMGSY road ChalalBagla 3rd call
ASRAMAKOLLY CHEPPILA ROAD WIDENING RETARRING
ROAD WIDENING WORK AT PIPRAI
Mongam kuyilamkunnu naduthalakuthu road widening
Improvement For Kumbefal Approach Road VR-11 At Ch. 0/000 to 2/00 HOT MIX Tq Khamgaon Dist-Buldana
Improvement For Dastapur Approach Road VR-52 At Ch. 0/000 to 0/600 HOT MIX Tq Khamgaon Dist-Buldana
IMPROVEMENT TO YESAPUR APPROACH ROAD VR 23 CH FROM 0/0 TO 1/00 TA LONAR DISTT.BULDANA WITH HOT MIX
CONST. OF LAGHU SETU AND APPROACH ROAD ON CHHACHHA ALIPUR KHEDA TO SINDHIYA CHOURAHA VIA ALIPURKHEDA ROAD TO AZADNAGAR ROAD
SPECIAL REPAIRS TO ODR 26 TO AKALPE APPROACH ROAD VR128 CH 0/00 TO 1/00 TAL-MAHABLESHWAR DIST-SATARA
SPECIAL REPAIRS TO ODR 26 TO LAMAJ APPROACH ROAD VR130 CH.0/00 TO 1/500 TAL-MAHABLESHWAR DIST-SATARA
IMPROVEMENT TO PALSODA APPROACH ROAD (VR 7)TA. NANDURA , DIST.BULDANA.CH. 1/200 KM TO 3/600 KM WITH HOT MIX
Improvement of Old Karla Approach Road VR-158 Length 0.600 KM Part KM 0/00 to 0/600 Tq. Pusad
DEULGAON KAWASA APPROACH ROAD VR- 71 TO JOINED MDR -7 KM 0/00 TO 0/300 TQ-AKOT DIST-AKOLA
IMPROVEMENT TO PALSODA APPROACH ROAD (VR 9)TA. NANDURA , DIST.BULDANA.CH. 0/000 KM TO 2/000 KM WITH HOT MIX.
Construction of rural road from GMS Shantinagar to Kanailal Biswas house at Shantinagar Ward No.02 under Swarajgram section SD-II, CD, APWD, Diglipur
Cement Concrete Work after Road Widening at Scheme No. 54 E.K. and E.H Sector Necessary Places and nearby Approach road in Ward No. 29 under Zone No. 07 Second Call
A/MTC of Internal Roads in Sec-8, Safidon for the year 2025-2026.
Imp Approach road gadgaon vr 37 km 0/500 to 2/500 tq and dist Nanded
Annual maintenance of internal roads in sector 20PIII Sirsa Filling of pot holes with stone metal GradeII as per BM specification and providing laying of 20 mm thick premix carpet for patch work on the roads in Sector20PIII Sirsa
Re-Construction of Bridge and Widening of Road work at 11.00 km in Brahmaavar-Jannadi-Bidkalkatte- Souda- Siddapura State Highway Road Kundapura Constituency
Periodical Repair of Plan Road Approach Road Gharyala in Distt. Tarn Taran under Head 5054 RB 10 Road Works PCI 1 Phase 1
REPAIR OF ROAD FROM PMGSY TO HO DASHARATH BISWAS AT ELANGI UNDER BOOTH NO.161 - Elangi Primary School
REPAIR OF ROAD FROM PMGSY TO HO GOBINDA MONDAL AT ELANGI UNDER BOOTH NO.161 - Elangi Primary School
Special Repair of Semgarha Chauraha to Lalpur Khadra PMGSY Link Road km-1, 2 Year 2024-25 in District Shravasti.
Maintenance and Repairing of Link Road From Bhdauli PMGSY Road to Bambiya on Banda Fatehpur Road Under MAndi Samiti Banda
C/O link road Chauli to Bhagroh from Km. 0.000 to 3.100 under PMGSY-IV (Package No. HP-12- 208 ).