Loading…
Loading…
3,870 results • Best match
consruction of cc drain from kanukuntla shankar house to nalluri raju house , boda dharmendra house to kotte madhu house, kotte madhukar houdr to v.sanjeev house t, nageshwar rao house to radhakrishna rao house and ramesh house to ku,mar ae house and ... and widening of road from ...
Mahabubnagar Municipality - Infrastructure Development works in ULBs with TUFIDC assistance - Upgradation of CC Road to double road lane junction Improvement, Land scaping & beautification at Kotha Gunj Bridge, Laying of CC Road from Boyanpally Godam ... Hall, Road widening laying ... Colony approach road to ...
Maintenance of Shrubbery Plantation beside Walking Track on both side (left side-1Km and Right Side-1Km Total =2Km) from Mahindra Showroom to Old age home (Nizampet Link Road) in circle-24, Kukatpally, Kukatpally Zone, GHMC during the year 2025-26
O.R To Link road Dichpally - Nizamabad at Km. 13/2 to Kondur (Via) Devi Theatre, NTR statue, post office, Railway station, Dubba, kaloor road from KM 6/0 to 15/2. in Nizamabad District for the year 2019-20(2nd call)
Laying of CC Road at Ward level nursery (Road No.4 to 5 Link Road), opp Model Market to P.No.381 and Near Sahara Compound Wall at Judges Colony in Ward.No.12 Mansoorabad of Hayath Nagar Circle-3,GHMC. (Recall)
Laying of C.C road Bus Route from Mallanna Temple to Graveyard , Bal Vihar Park to Reddy Chicken Centre Link Road at S.N. Colony in Ward No. 112 Ramachandrapuram Circle-22, SLP Zone GHMC (Reserved for SC individuals and Societies only)
Periodical Renewals to Link road Dichpally-Nizamabad road to Kaloor at Km13/2 to PWD road (via) Devi Theatre , NTR statue, Post office, Railway station to Dubba, kaloor, Kondur road from Km 10/0 to 14/0 in Nizamabad District.
Estimate for providing of Octagonal poles and line work in link-road -12 i.e from JV Hills park to Masjeedbanda road via Prabhupadha layout under HT line in Kondapur Divsion (104) in Srilingampally Circle-20 in Serilingampally Zone, GHMC Recall
Proposed road Improvement plan of Mehdipatnam main road from opp. Of Sarojini Devi Eye Hospital to PVNR Express way piller No.17, near Jaya Bushan Hospital to Retibowli junction under Mehdipatnam-70, Circle-12 (KZ), GHMC (Item No.2) 2nd Call
Package -22: Flood damage Repair for Road works (02) No's in Abdullapurmet mandal of Rangareddy District Estimated cost Rs.153.50Lakhs under MRR 2022-23 and 2023-24 Grant (3rd Call)
Package - 36 : Flood Damage Repair for Road works (04) No's. in Kulkacherla Mandal of Vikarabad District.Package Estimated cost Rs.114.00 Lakhs under MRR 2022-23 & 2023-24 grant (2nd Call)
Mahabubnagar Municipality - Srinivasa Colony park gate & arches (2Nos),Construction Welcome board arch at Bhoothpur Road,Construction Welcome board arch at Raichur Road,Construction Welcome board arch at Jadcharla Road, Construction of Bus Bays 3 Nos at new collectorate, MVS College and DIET college and Beatuification of Thurpukamann and Dasara katta at ram mandir chowrastah in Mahabubnagar Municipality under TUFIDC funds (Package-IV)
Package No.DMFT-PLR-6 - Improvements to (1) road work in Khammam Rural Mandal, Khammam district, package estimate cost Rs.132.00 Lakhs
TS01XII012 - Road from Bejjur to Somini of Bejjur mandal of Kumuram Bheem Asifabad District. Est. Cost Rs.356.05 Lakhs (Rs.336.00 Lakhs + Rs.20.05 lakhs Maint. Cost), Sanctioned under PMGSY Phase XII Batch III Grant. (1st call)
Widening of Road and Providing of Footpath under Junction Improvement at Dundigal Junction, Ward 296-Dundigal in Dundigal Circle -59, Quthbullapur Zone, CMC
Widening of road at e seva junction ,golanaka in temple Alwal ward no 192, Alwal circle- 02,Malkajgiri Zone,MMC. (Item no.2)
Laying of CC Road from H.No:23-4-767 to 23-4-790 to 23-4-792 and 23-4-768 to 23-4-757/1 approach road to Sri Sri Sri Jagadamba Renuka Ellamma temple,Ashok Maidan,Sulthanshahi in view of Bonalu Festival 2025 in Moghalpura div-33,Circle-09,CRZ,GHMC F-Y 2025-26
Laying of VDCC road at approach road to Bansilalpet stepwell and other adjacent lanes at H.No.6-7-254, Yerra Pochamma temple & H.No.6-7-227, Minority cell community office & H.No.6-7-297 Navodaya Community Hall & JNNURM building, 50/D & H.No.6-7-45/E8/C in ward 147-Bansilalpet, Under, Circle-30, Begumpet, GHMC.
Widening and strengthening of a) Venkatapur-chelpur road from km 17/0 to 29/0 b) PWD road to Venkateswerapally(via) Adavi rangapur from km 0/0 to 1/0 and C) Approach road to Ramappa temple lake road from km 0/0 to 2/0 in jayashankar Bhupalapally district Sub Work: Providing Road safety Interventions
Package No.KMM-RPM-01 BT renewal to (2) works in Raghunadhapalem Mandal, Khammam District, Package Est. Cost Rs.500.00 Lakhs 1) BT renewal to R/f Approach road to Sivaigudem, Raghunadhapalem Mandal, Est.cost Rs.20.00 Lakhs 2) BT renewal to R/f Manchukonda to Moolagudem via., Haryathanda, Badyathanda, Erlapudi, Pangidi and Mangyathanda, Raghunadhapalem Mandal, Est.Cost Rs.480.00 Lakhs
Construction of approach road to (1) ROB at km.311/6 to 312/4 on Old NH7 road for railway bridge No.773, (2) ROB at km.0/100 to 0/900 of Armoor -Bheemgal road for Railway over Bridge No.771 in Nizamabad district. Sub-work:- Providing Consultancy Services for Conducting survey for the work ROB 773.
Providing of civic amenties in view of Ramzan festival by laying of CC road approach road to Masjid-Ur-Rahman from H.No. 12-2-389/A/36 to H.no. 12-2-396/A/30/1, in Mahaveer NAgar under Asif Nagar -72 Cir No.12 Kz GHMC (Item No.5) (Reserved for ST's Reservation Only) 1st RECALL
Laying of CC Road from H.No:23-6-974 near Kasi viwswanath temple to 23-6-964 via 23-6-983/2 approach road to Bangaru maisamma temple,Rambakshbanda in view of Bonalu Festival 2025 in Moghalpura div-33,Circle-09,CRZ,GHMC (Reserved For All SC Individuals / Proprietorship Firms/Partner Ship Firms) F-Y 2025-26
Widening and Strengthening from Sagar PWD Road to Sagar PWD Road via Eliminedu, Pocharam and Mangalpally Village from (a) Single lane road to Double lane road from Km 0/0 to 15/587 and (b) Construction of Four lane carraige way approach road to TSIIC Industrical Area from Km 0/0 to 0/650 in RangaReddy Distirct.
Laying of Approach Road from 2nd Bypass road to Indira Mahila Shakthi Bhavan at Peddur in Sircilla Municipality
Laying of CC approach Road at Beerappa Temple, Thorrur Village, Thorrur Ward No-53, Adibatla Circle-15, GHMC
Formation of Internal Roads and Construction of CC Drains in Ward No:20 of Mahabubabad Municipality (THE WORK IS RESERVED FOR ST INDIVIDUAL OR SOCIEITES ONLY)
Improvement of Road Safety through rectification of identified BS TG 02 106 by Permanent improvement ROB from Km 168/325 to Km 169/420 and Improvement of T Junction at Km 169/6-8 from Km 169/420 to Km 170/250 on Nizamabad Jagdalpur section of NH63
Construction of Road and Ramp for Existing Culvert at (Doragaripally Road) Gopalawada in Ward No.02 in Mancherial Municcipality under MGF (Reserved for SC)
Laying of C.C. Road & Construction of C.C. Drain in S.C. Colony, Bokkalguda in Ward No.11, Adilabad.
Laying Of CC Road & Construction Of Drain From.Bukya.Sampath(H) to Bukya.Shanthi(H) at Gundlasingaram in W.NO.58.
Laying Of CC Road & Construction Of Drain From.Damera.Pochaiah(H) to Ponnala.Jenardan(H) at Vangapahad in W.NO.58.
Laying Of CC Road & Construction Of Drain From.E.P.No.SS12/P5 to Ambedhkar Bavan at Pegadapally in W.NO.58.
Laying Of CC Road & Construction Of Drain From.Bukya.Aruna(H) to Gugulothu.Venkanna (H) at Gundlasingaram in W.NO.58.
Laying of CC Road & Construction of 450 x 450mm CC Drain at Old Nagaram in D.No:35
Laying Of CC Road & Construction Of Drain From.Rajeshwari.Kiranam to SC Grave Yard at Pegadapally in W.NO.58.
Laying of CC Road, Construction of Drains & Community hall in Division 4,5,54, GWMC , Warangal (Pacakage No.2)
Laying of CC Road & Construction of Central Median From Gandhi Statue to Ambedkar Statue in Parigi Municipality.
Laving of CC Road, Construction of Drain & Community hall in Division 5,6,8,9, GWMC , Warangal (Pacakage No.3)
Laving of CC Road, Construction of Drain & Community Hall in Division 58,59,60, GWMC , Warangal (Pacakage No.14)
Laying of CC road & Construction of CC Culvert at Ram Mandir back side in ward no. 15
Infrastructure Development works in ULBs - Construction of CC Drain from Patel Complex to Hanuman Temple via Market Road and from Shadnagar road to Ayyapa Swamy Temple and internal road drains & Construction of CC road from Siddappa Hotel to Thunkulgadda Bridge in Parigi Municipality under TUFIDC Assistance
Restoration of C.C. Road Sai Baba Temple to Masjid Turning, H.No.3-145 to H.No.3-139, H.No.3-183 to Manjeera Degree College and Other internal road at Gowtham Nagar in Ward No. 113 Patancheru Circle-22, SLP Zone GHMC (Item No.2) (2nd call)
Package no.TS01XII010 - Road from T01-Road from Karjevelly to Motlaguda in Bejjur mandal of Komurambheem Asifabad District, Est. Cost Rs.628.58 Lakhs (Rs.593.00 Lakhs + Rs.35.58 lakhs Maint. Cost), Sanctioned under PMGSY Phase XII Grant. (1st call)
Package no.TS01XII07 - Road from L022-Etiguda to Thalai. Est. Cost Rs.217.31 Lakhs (Rs.205.00 Lakhs + Rs.12.31 Lakhs Mtc. Cost), in Bejjur Mandal of KB Asifabad District, Sanctioned under PMGSY Phase XII Batch III Grant. (1st call)
Package No.TS01XIILB02 - Construction of Bridge at 8/800 on Road from Laxmipur to Baddampally of Vemanpalle Mandal of Mancheraial District. Est. Cost Rs.873.44 Lakhs (Rs.824.00 Lakhs + Rs.49.44 Lakhs Mtc cost), Sanctioned under PMGSY XII Grant.
Construction of CC Drain from Shafatullah house to panshop,kondamma hotel to milkcenter at old city chowrastha , Yousuf bhai house to ex mp Lateefsahab house clock tower, construction of chambers at housing board and CC Road from Ravi master house to ... road internal roads , ...
Main Work:-Forming and laying GSB,WMM and Providing Black Topping for Balance Internal Roads in Phase-II at IP-Sultanpur,Ameenpur(M),Sangareddy District. Sub Work: Construction of office at IP Sultanpur with supply and fixing of pre-fabricated shed of 40X30ft with 50mm thick Aercon panels for wall and non-asbestos sheet roof supported with shed columns,truss and purlins with height 20feet at IP-Sultanpur, Ameenpur(M),Sangareddy District.
Combined tender for i) Providing renewal coat of BT with BC for roads from RTC depot to Jangedu Jn of KTK-1 Incline, internal roads of Subash colony and Krishna colony plots area main road, ii) Widening of CC/BT road for vehicle tracking system near coal bunker and 40T weigh bridge at KTK-1 Incline, iii) Asphalting of road for 30T Magazine at KTK-1 Incline, Bhupalpalli, Jayashankar Bhupalpalli Dist., Telangana State.
DMF-YLD-VIII 1) C/o R/Wall to internal roads in Motlagudem, Est. Cost Rs.47.00 lakhs 2) C/o R/Wall to MI Tank at Motlagudem, Est. Cost Rs.50.00 lakhs 3) BT to R/F R&B road to Motlagudem, Est. Cost Rs.70.00 lakhs 4) C/o CC roads in Motlagudem, Est. Cost Rs.48.00 lakhs, package estimate cost Rs.215.00 lakhs, Yellandu Mandal, Bhadradri-Kothagudem District, P.R.Circle, Khammam