Loading…
Loading…
1,905 results • Best match
SH Providing and Fixing W-Metal Meam Crash Barrier at Rd. 4.285 to 4.460
(SH-ROFD, Protection of work, cross drainage work, metalling and tarring, paver Block, V-shape drain, parapets, crash barrier, road safety, kilometer Stone and dumping site RD 0/0 to 5/0) under PMGSY
Up-gradation of Holta to Tanda Holta road km 0/0to5/500 (Pkg No HP-04-420 ) under PMGSY-III (Batch-I, 2022-23) in Distt Kangra HP (SH- Imp, P/places, Missing CD, S/Drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etc i/c 5 year RM)
Improvement of Black Spot on Gumma Baghi Narkanda Road in K.M. 0/00 to 38/500, C/o, W-Metal crash barrier in K.M. 0/045 to 0/090, 0/240 to 0/320 and 32/100 to 32/250, 32/700 to 32/760 and 34/050 to 34/110
Elysium Devidhar road km. 0/00 to 12/330 (SH P/F W Metal Crash Barrier railing RD. 1/405 to 1/455, 6/225 to 6/350 and 6/540 to 7/017 Parapets RD. 0/00 to 6/225 and 6/350 to 6/540)(Under Black Spot
Restoration rain damages on Neripul Deothi Majhgaon road Km 0/00 to 12/00 (SH Providing and Laying WBM G -III,Metalling ,Tarring between km 8/00 to 9/00 ,Crash Barrier Between km 0/250 to 0/700 AND Retaining wall at Rd 10/075 to 10/096 PDNA
Restoration rain damages on Banethi Bagthan Rajgarh Chandol road Km 48/00 to 87/0 (SH Construction of Retaining wall between km 73/350 to 73/370, Breast wall between km 73/650 to 73/670,U shape Drain between km 73/335 to 74/00 and crash barrier un
Improvement and Strengthening of Thalout Thachi Somagd Road Km 0/000 to 34/000 (Section Thalout Panjain to Thachi Km 0/000 to 25/000 ) (Job No.CRF-HP-2018-19-161)( SH ROFD/FC M/T CD Works R/wall B/Wall PCC V Shape Drain Parapets Crash Barrier Ro
Improvement of Una Rampur Haroli Jaijon road from Rampur Chowk to Jal Shakti Vibhag Rest House, named as Vikas Path km. 1/700 to 5/700 SH C/O Retaining walls, RCC and Metal crash Barrier, P/L Cobble stones and 80mm thick NTC Paver in footpath, P/F Ca
Providing and applying 2.5mm thick road marking strips using thermoplastic materials in KSC road in km. 145/00 to 149/00, Sanjualli Dhalli Bye Pass road in km 0/00 to 3/775, MRR via Chotta Shimla in km. 149/00 to 156/640 and MRR via Lakkar Bazar in
C/O R.O.F.D Protection work, Cross drainage work, Road side Drain, metaling and Tarring, paver Blocks, Crash Barrier, Road safety work and Dumping Structure in km. 0/00 to 12/885). )(under Nabard RIDF-XXXI
SH Construction of Retaining wall at RD 1/880 to 1/900 with crash barrier
SH C/o Retaining wall at RD 4/951 to 4/973 with Crash Barrier
SH Providing and fixing w-metal Dubble Beam Crash Barrier at Rd. 2.900 to 3.020
SH C/o Retaining wall at RD 5/935 to 5/947 with Crash Barrier
SH C/O R/wall at RD 4/456 to 4/676 with crash Barrier
SH Providing and fixing W-Metal Dubble Beam Crash Barrier at Rd. 57.150 to 57.270
SH C/o Retaining wall at RD 4/930 to 4/951 with Crash Barrier
SH Construction of Retaining wall with Crash Barrier at km 0 180 to 0 204
SH C/O R/wall at RD 4/635 to 4/656 with crash Barrier
SH Providing and fixing W-Metal Dubble Beam crash Barrier at Rd. 2.900 to 3.020
SH Providing and fixing W-Metal Dubble Beam crash Barrier at Rd. 0.150 to 0.270
SH Providing and fixing W-Metal Dubble Beam Crash barrier at Rd. 57.780 to 57.900
Providing and fixing crash barrier at R.D. 56/885 to 57/085 Under IPH Deposit
SH C/O R/wall at Rd 1/840 to 1/850 with Crash Barrier
SH Construction of Retaining wall at RD 5/425 to 5/445 with crash barrier
Providing and fixing crash barrier in between Km 0/00 to 0/250) Deposit work
P/L 30mm thick B.C. 2.5mm thick road marking thermoplastic strip in km. 0/0 to 4/0 ) HP0302MDR071 . (Under PMGSY ). (ii) Kasiri Mahadev Duhak Chhattruru road km. 0/0 to 6/0. (SH P/L 30mm thick B.C. 2.5mm thick road marking thermoplastic strip and V
Providing and laying Bituminous Concrete 25mm thick and thermoplastic road marking strip at RD 0/00 to 1/00 (HP0306VR00192)
Providing and laying bituminous concrete 30mm thick at various RD providing paved shoulders and thermoplastic road marking strip) Under OTMNP
C/O Balance work of Bvitumenous Macadam,Steel Crash barriers,Edge lines,Delinators and Road Dividers etx at various RDs
Retroreflective painting / Road marking and construction of drain from office road junction point to field hostel at Karian colony of CPS-III
Selection of Agency for Designing, Development Implementation of Road Safety A Culture Campaign which includes Managerial Support to ensure coordinated awareness campaign in all Districts, Designing and Development of Information, Education C
Providing and fixing W metal crash beam crash barrier at RD 7/840 to 7/863.50
Construction of Retaining Wall, Crash Barrier, RCC stairs and U-Shape drain at RD 24/330
C/O Passing place, missing C.D., side drain , parapets, crash barrier, CC pavement and Tarring work
P/L bituminous concrete 25mm thick and thermoplastic road marking strip at RD 0/00 to 0/366 Salasi Khad leg.)
Providing and Fixing W-Metal Beam Crash Barriers at Km 28/100. 28/800,29300, 29/600, 30/000 and 30/350)
Balance work of road from Nore to Wazir Bowali Km. 0/00 to 37/00. (SH C/o R/walls, B/walls and W-beam railing at various RDs in Km. 0/00 to 37/00).
Re-construction and improvement of pedestrian path and W. Beam Metal crash Barrier Railings on MRR via Chotta Shimla RDs, 150/480 to 150/585, 150/630 to 150/765, 151/020 to 151/120, 151/570 to 151/675, 151/750 to 151/925 and 156//405 to 156/480
Job 3 Repair and Restoration of Panjawar Bathri road Gondpur turf Jai Chand road Km. 0-0 to 1-600 (Sub Head P.L GSB, WMM, DBM, BC , P,L paver block, C.O drain P.F cat eye , delinator etc at Gondpur Turf Jaichand Chowk)-Deposit work
Metaling Tarring on Chamyana to Surala road km. 0/00 to 6/00 (SH C/O R/wall at RD. 1/450 to 1/460 and Hume pipe culvert at RD. 4/705, 5/165 toe wall and P/F erecting of WBM crash barrier in km. 3/780 to 4/00(Under SCCP
Improvement of black spots on Kaloha Pragpur Dhaliara Dada Siba Sansarpur Terrace road SH Providing and fixing crash barrier at 38/265 to 38/285 45/190 to 45/290 and 45/300 to 45/375 45/400 to 45/500 45/671 to 45/682 45/710 to 45/725 and 47/017 to
Improvement of Black spot on Navgaon Beri road Km. 4/350 to 30/0 (SH- C/o Retaining wall at RD 14/195 to 14/225, 14/245 to 14/255 and 14/270 to 14/300, providing and fixing crash barrier in Km. 14/040 to 14/100 and 14/185 to 14/300).
(SH-ROFD, Protection of work, Cross drainage work, metalling and tarring panel concrete, V-shape drain, parapets, crash barrier, road safety, kilometer Stoen and dumping site RD 0/0 to 29/025) under PMGSY-III (HP-09-709)
Construction of Retaining wall with Toe wall and Crash Barrier at Rd. 24/332 to 24/350
C/O R/Wall P/L GSB WMM BM BC interlocking pavement and crash barrier). (Under PDNA).
Balance work for construction of retaining wall, breast wall and W-Metal Beam Crash Barriers in Km 36/0 to 43/705
Providing and fixing Metal Beam Crash Barriers at km. 1/00 to 1/030) Under Black spot for the year 2025-26.
SH ROFD, Protection work, CD works, Metalling, V an U - shape drain, parapets, crash barrier, road safety, kilometer stone, irrigation crossing and dumping site at RD 0/0 to 13/970 (including five year maintenance) under PMGSY-III Batch-