Loading…
Loading…
1,906 results • Best match
Providing and Laying Grade-III, tack coat, Bituminous concrete 25mm thick and road marking with hot applied thermoplastic compound in Km.1-0 to 3-0
SH ROFD, Protection work, CD works, GSB, WBM, CMBM, bituminous cold mix CC pavement, V-shape drain and Katcha drain, parapets, crash barrier, road safety, kilometer stone, irrigation crossing and dumping site at RD,0/0 to 6/195 (i/c five year maint.
C/O Passing places, Missing CD, side drain , parapets,crash barriers, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
ROFD Protection work CD works M/T V shape side drain crash barriers logo sign board Kilometer stone and Routine maintenance for five year after completion
Balance work for Removal of formation deficiencies, construction of cross drainage works, W-Metal Beam Crash Barriers and parapets in Km 30/0 to 33/0
RODF, Protection works, CD, Works, M/T, Parapets, V-shape drain Crash Barriers, Sign Board and dumping sites) under Job No. CRIF-HP-2024-25/190
Providing Laying and Metalling Tarring 0/00 to 1/00 and Crash Barriers at RD 0/450 to 0/500 and 0/780 to 0/880)
P/L Metalling and Tarring in extended portion, CD works, Protection works, V-Shaped Drain and Crash barriers etc in km. 0/00 to 2/200).
SH C/O R/wall at Rd 2/670 to 2/685 and 1/520 to 1/539 with Crash Barrier
Formation cutting 5/7 mtrs wide in Km 0/0 to 0/495, Crash Barrier, R/Wall and M/T etc
SH Providing and ercting W metal crash barrier in the portion from RD5/735 to RD5/820 163 Nos black spots
P/F crash barrier at Rd 1/200 to 1/230, 0/100 to 1/130, 3/020 to 3/040
ROFD 5/7 mtrs. Wide road ,CD, soling ,M/T Drain, Parapets crash barrier in km. 27/0 to 51/660
SH C/O R/wall at Rd 1/910 to 1/920 and 2/670 to 2/685 with Crash Barrier
Construction of R/wall, B/wall C.D. work and Crash barrier etc in km 0/0 to 4/930 balance work
Improvement, Passing Places, Missing Cross Drainage, Side Drain, Parapets, Crash Barrier, CC Pavement, Interlocking Paver block, Tarring and Road Signs etcetra)
C/o crash barrier W-Metal beam with R/wall at R.D. 13/120 to 13/135) under Demand No.32
SH F/C, M/T, R/walls, B/walls, CD works, Drain, Crash Barrier and Parapets, etc. Package No.HP-06-169.
SH F/C, M/T, R/walls, B/walls, CD works, Drain, Crash Barrier and Parapets etc. Package No.HP-06-170.
(SH- P/L tack coat, P/L 30mm thick B.C. and 2.5mm thick road marking thermoplastic strip from km. 0/0 to 1/0.(HP0301VR0037).(Under PMGSY).
(SH- P/L tack coat, P/L 30mm thick B.C. and 2.5mm thick road marking thermoplastic strip from km. 0/0 to 1/400.(HP0301VR0035).(Under PMGSY).
Sub Head ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture Dumping Structure in km 0/000 to 3/425
Providing road Signs and road safety furniture on various roads in Shimla Town Himachal Pradesh Transport infrastructure Development Fund
M/T on Link road Panog to Ajroli road Km 0/ to 3/00(SH- Providing and laying premix carpet, Providing, fixing Kilometer stone and road marking edge line )
Protection works, Cross Drainage Works, Mettalling and tarring , Parapet, V Shape Drain, crash barrier, Road Furniture RD 0/00 to 8/00
Repair and maintenance of steel railing, painting of steel truss bridge along with Providing and fixing crash barrier at R.D. 37/285
C/o crash barrier W-Metal beam i/c Edge wall at R.D. 0/700 to 0/900) under Demand No.10
Formation Cutting, Protection works, Cross-Drainage works, Mettaling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc
P/F crash barrier at Rd 5/00 to 5/055 C/O R/wall at Rd 5/060 to 5/086.50
Formation Cutting, Protection works, Cross-Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc)
Sub Head Formation Cutting, Protection works, Cross-Drainage works, Metalling Tarring, Road side Drains, Crash Barrier, Parapets, Km stone Dumping Sites etc.
Formation Cutting, Protection works, Cross-Drainage works,Mettaling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc
SH Providing and Fixing crash barrier at Sunder Nagar to Jachh road Kateru to Ghiri in RD 25/00 tom 32/00
Removal of Formation deficiency in essential reaches in Km. 31/0 to 48/0 and Crash Barrier 46/0 to 46/120
Sub Head Formation Cutting, Protection works, Cross-Drainage works, Metalling andTarring, Road side Drains, Crash Barrier, Parapets, Km stone, Dumping Sites etc.
(SW-P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between 16/00 to 17/400)
P and L 30mm thick B.C. and 2.5mm thick and road marking thermoplastic strip in km. 5/270 to 6/00 and 8/00 to 8/710). (HP0302VR0006)
(SH- P/L 25 MM Thick BC laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 0/00 to 1/00)
(SH- P/L 25 MM thick B.C laying with Paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) between Km 1/00 to 2/00)
(SH- P/L 25 MM thick B.C laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) between Km 0/00 to 1/00)
(SH Providing and laying 30mm thick bitumen concrete, PCC drain, missing km. stone and 2.5mm thick road marking thermoplastic strip in km. 2/0 to 3/0). HP0306VR0024.
Annual repair and maintenance of various roads in Town section under Mandi Division No.II (SH Providing and applying 2.5mm thick road marking strips for roads, crossing and Bus stops etcetera.
Road Safety measure at JNSG road km 95.00 to 103.300 SH Providing of Table Top speed breakers at various Rds.
Improvement of Junction at Km 63/660 at Nehranpukhar for road safety NH-503 in the State of Himachal Pradesh
C/o R/wall in km. 4/415 to 4/450 and Providing erecting crash barrier in km. 4/440 to 4/520
Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance)
Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance)
Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance)
Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance)
Sub Head Formation Cutting, Protection works, Cross-Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone, Dumping Sites etc.