Loading…
Loading…
1,906 results • Best match
Sub Head Formation Cutting, Protection works, Cross- Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone, Dumping Sites etc.
Construction of Passing places, Cross Drainage, side drain, Parapets, Crash Barrier,Tarring work and road signs etcetra including routine maintenance for five years).
SH C.O PCC Drain P.L WMM DGBM 50mm thick and BC 40mm thick and P.L crash barrier railing in Km 153.180 to 156.507
Providing and erecting (W) metal crash barrier in km 2/700 to 2/790 and 2/840 to 2/900) for Black Spot
Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance)
Improvement, Passing places Missing Cross Drainage, side drain Parapets Crash barrier CC Pavement, Tarring and road signs etc. including five year routine maintenance
Sub Head Formation Cutting, Protection works, Cross-Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone, Dumping Sites etc.
Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetera including five year routine maintenance)
Construction of R/wall at Rd.0/614 to 0/624 and installation of Crash barrier at Rd.0/614 to 0/640
SH Construction Breast wall at RD 0 385 to 0 438 with W Metal Crash Barrier at RD 0 415 to 0 445
Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance).
SH Providing and fixing of high intensity Engineering grade prismatic sheeting on the front side of the existing W matel beam crash barrier
P/F Crash barrier at RD 15/060 to 15/105, 18/325 to 18/370 and 18/875 to 18/920 etc.
SH Providing and fixing of high intensity Engineering grade prismatic sheeting on the front side of the existing W-matel beam crash barrier
(SH-Improvement, Passing places, Missing Cross Drainage work, side Drain, Parapet, Crash Barrier, C.C. Pavement tarring and road signs, etc. including 5 year)
SH Providing and fixing of high intensity Engineering grade prismatic sheeting on the front side of the existing W matel beam crash barrier
(SH- P/L 25 MM thick B.C laying with Paver Finisher and Road Marking strips of hot applied Thermoplastic compound (Painting line) Between Km 2/00 to 2/500)
(SH- P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 0/00 to 0/600)
(SH- P/L 25 MM thick B.C laying with Paver Finisher and Road Marking strips of hot applied Thermoplastic compound (Painting line) between Km 0/000 to 1/300)
(SH- P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 3/00 to 3/300)
(SH- P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 0/800 to 1/700)
(SH- P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 3/00 to 5/00)
(SH- P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 0/00 to 1/500)
(SH- P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 1/000 to 1/500)
Providing and laying with paver finisher , road marking strips of hot applied thermoplastic compound (Painting line ) between Km 0/00 to 2/00 i/c five years routine maintenance
Providing and laying with paver finisher , road marking strips of hot applied thermoplastic compound (Painting line ) between Km 0/00 to 1/500 i/c five years routine maintenance)
SW- P/L with paver finisher , road marking strips of hot applied thermoplastic compound (Painting line ) between Km 0/00 to 1/390 i/c five years routine maintenance)
(SW- P/L with paver finisher , road marking strips of hot applied thermoplastic compound (Painting line ) between Km 0/00 to 2/270 i/c five years routine maintenance)
SH Providing and erecting metal beam crash barriers at RD 5420 to 5520 6100 to 6200 and Construction of Retaining Wall at RD 4370 to 4390 Deposit work BASP
Annual maintenance of various roads under Chamba Sub Division No.II Providing and laying hot applied thermoplastic centre line / Edge line on various road
SH- Construction of passing places, Cross Drainage, Side drains, parapets, Crash barrier, Tarring work and road signs etcetra including routine maintenance for five year.
SH- Construction of passing places, Cross Drainage, Side drains, parapets, Crash barrier, Tarring work and road signs etcetra including routine maintenance for five year.
( Improvement, passing places, missing cross drainage, side drain, parapets,crash barrier,CC pavement , Tarring and road signs etcetera including five year routine maintenance) under
Sub Head Formation Cutting, Protection works, Cross-Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc.
(SH- P/L 25 MM thick B. C laying with Paver Finisher and Road Marking strips of hot applied Thermoplastic compound (Painting line) between Km 0/00 to 1/00)
(SH- Providing and laying 25 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 0/00 to 1/00)
(SH- Providing and laying 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 0/00 to 1/600)
(SH- Providing and laying 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 1/00 to 1/400)
P/L 25mm thick B.C. and 2.5mm thick road marking thermoplastic strip and V-Shape drain in km. 1/0 to 2/0 and 2/0 to 3/920). (HP0306VR0021)
(SH- Providing and laying 25 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 1/00 to 2/00)
(SH- Providing and laying 25 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 0/00 to 2/00)
SH- Providing and laying 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 0/00 to 1/00)
A/R and M/O VARIOUS ROAD UNDER JUBBAL SUB DIVISION UNDER JUBBAL DIVISION SH ROAD MARKING THERMOPLASTIC PAINT LINE OF VARIOUS ROAD UNDER JUBBAL SUB DIVISION UNDER JUBBAL DIVISION.
(SH- Providing and laying 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 1/00 TO 2/500)
M/T, R/wall, B/wall, Crash Barriers, Sign Board, Missing C.D. works and five year routine maintenance under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-530.
C/O Patwarkhana Plog Dunglu road km 0/0 to 7/0(SH-P/L M.T work at RD 1/950 to 2/400,C/O Edging at RD2/200 to 2/600, Crash barrier at RD 2/300 to 2/400,C/O 4.00 m span RCC slab culvert at RD 2/030 and C/O 900 dia NP2 RCC hume pipe culvert at RD 2/300
Providing road safety to L.P.R.R. road Km 97/0 to 112/167 (SH- Providing road side marking line and installing of delineators ( road way indicators, hazard markers, object markers between Km 106/0 to 112/167).
Reconstruction work of Una Jaijon road SH P/L GSB,WMM,DBM,BC C/o U-shape drain P/L thermoplastic paint sign boards
Marking of road pavement with thermoplastic material, Reconstruction of road side damaged drains, strengthening of road berms in BBMB Colony Sundernagar area (Phase -II)
Annual maintenance of various roads under Chamba Sub Division No.1 Providing and laying hot applied thermoplastic centre line / Edge line on various roads