ROFD, M/T, Missing R/Walls, B/Walls, W-Metal Beam Crash Barriers, Sign Board, CD Works and five year maintenance under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-502.
C/o ROFD, R/walls, B/walls, M/T, CD drain, Parapets, Crash barriers and logo board Km. stones and 200m stones etc. in 0/0 to 6/010 under NABARD RIDF-XXVIII.
ROFD, R/walls, B/walls Gabion walls, M/T, Cross Drainage work, Drain, Parapets, Crash Barriers and Citizen information Board, Logo Board, KM stone and 200 Metre stone and five years routine maintenance)
P/M of Dharamshala Dadh Palampur Holta Sandhol road under MDR (HP0402MDR 078) (AMP 2022-23) Phase-I (SW- Providing and laying Bituminous concrete and road marking etc. in Km 27/00 to 28/00)
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km Km 1/00 to 2/00
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km Km 16/00 to 17/00
(SH- Repair to pot holes, P/L tack coat, P/L 30mm thick B.C. and 2.5mm thick road marking thermoplastic strip from km. 19/0 to 20/0 and 20/0 to 21/0).
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km Km 2/00 to 3/00
(SH- P/L 25 MM Thick B.C laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 3/00 to 4/00 and 4/00 to 5/200)
Periodical maintenance Badehar Khuhi Pekhubela road km.0.0 to 3.600 ) (HP1205VR082) ( SH P L 30 mm thick BC with paver finisher Sides line zebra crossing and cat eyes) under State Head
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
Portion Barot to Nalhota Km 0/0 to 16/0 (SH Providing and Fixing Crash Barrier for Improvement of black spot at RD 4/195 to 4/395.)
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
Formation Cutting, Protection works, Cross- Drainage works,Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc. under PMGSY Pahse III Batch I
Formation Cutting, Protection works, Cross-Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc. under PMGYS Phase-III, Batch-II
Providing and erecting (W) metal crash barrier in km 0/480 to 0/555, 0/900 to 0/940 and 0/825 to 0/840) under Black Spot
Construction of Retaining walls, Breast walls, Wire Create Walls, 2.00 mtr. R.C.C. Slab Culvert, Road Side Drain, Parapets and Crash Barrier at R.D. 0/00 to 35/00
Providing and laying 50mm thick Dense Graded Bitumen Macadam and 30mm thick Bitumen and concrete, providing Mastic Ashphalt wearing course centre line edge line and crash Barrier etc
Earth work, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
(SH- R/Wall, B/Wall, WBM G-II, side drain, Cross drainage work, Tarring, C.C. pavement, crash barrier and road signs board i/c five year R/M)
SH C/O ROFD, Protection work, Cross Drainage work, M/T, Road side Drain, Crash Barrier, Parapets, Road furniture, Bio Engineering and Dumping site Package No.HP-06-175.
P/F crash barrier at RD 2/750 to 2/788, 2/800 to 2/834 and 4/740 to 4/778 and 13/515 to 13/680
Formation Cutting, Protection works, Cross- Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc. under PMGSY Phase-IIi, Batch-II
SH Metalling and Tarring, R/wall B/wall, PCC drain, Parapet metal beam Kilometer stone, Cat Eye and edge line marking
Periodical Maintenance on Kheel Pangna road No. HP06VR007529201, HP06VR007529202 HP06VR007529203 (SH Providing and laying 30 mm bituminous concrete, thermoplastic paint in Km. 0/00 to 3/00)
Periodic Maintenance of Nainavati to Karad road KM 0/000 to 11/795 SH- Providing annual surfacing including surface correction with WBM grading-3 and applying road marking strips in km 6/000 to 9/000
Road safety Annual Action Plan on link road Kinnu to Guret Km 000 to 8435 SHConst of Retaining wall at RD 4600 to 4620 RHS
Periodic Maintenance on Kheel Pangna road VR-0075 (SH Providing and Laying 30 mm Bituminous concrete including profile correction, Thermoplastic paint and V-Shape drain in Km 2/00 to 4/00)
ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture Dumping Structure in km 0/000 to 4/540 includinng five years routine maintenance under PMGSY-IV Batch I
Improvement of black spot on Kaffota Koti road km. 0/0 to 29/7500 (SH-C/o R/wall with crash barrier at RD 1/380 to 1/520)
Improvement, C/o Passing Places, Missing CD, Side Drain, Parapets, Crash Barrier, CC Pavement and Tarring work under PMGSY-II, Batch - I, 2019-20 Package No. HP-02-07
SH C/o V Shape drain PCC open surface drain and erecting W metal crash barrier portion at RD.42/195 to 42/360 42/425 to 42/435
Construction of Retaining walls, Breast walls, Wire Create Walls, Hume pipe Culvert, Road Side Drain, Parapets, Metalling and Tarring and Crash Barrier at R.D. 35/00 to 51/00
Periodical Maintenance on Parga to Banyas road No. HP06VR006229201, HP06VR006229202 HP06VR006229203 (SH Providing and laying 30 mm bituminous concrete, thermoplastic paint in Km. 0/00 to 3/00)
Periodical Maintenance on Koltlu Nainj road HP0806 VR004429301 to HP0836 VR 004429305 (SH- Providing and laying 30mm bituminous concrete, thermoplastic paint in Km. 0/000 to 5/000).
Periodical Renewal on Jaiher Mangarh Road Km 0/0 to 6/320 (SH- Providing G-III , Primer coat, , Tack coat , Bituminous concrete 25mm thick and thermoplastic compound etc.)
Periodic Maintenance of Dhar Shalog road KM 0/000 to 1/990 SH- Providing annual surfacing including surface correction with WBM grading-3 and providing and applying road marking strips in km 1/000 to 1/990
Periodic Maintenance of Behna Dalash road KM 0/0 to 14/00 SH- Providing annual surfacing including surface correction with WBM grading-3 and providing and applying road marking strips in km 8/000 to 10/600
Providing and Laying Tack coat, 25 mm thick Bituminous Concrete including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 42/00 to 43/00) (year 2025-26 MDR)
Providing and Laying Tack coat, 30 mm thick Bituminous concrete including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 0/0 to 2/0 (Year2023-24 Village road)
Providing and Laying Tack coat, 30 mm thick Bituminous concrete including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 75/0 to 80/0) (year 2023-24 MDR)
Providing and Laying Tack coat, 30 mm thick Bituminous concrete including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 0/0 to 2/0 (Year2023-24 PMGSY road)
Providing and Laying Tack coat, 30 mm thick Bituminous concrete including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 3/00 to 6/360) (year 2023-24 Incentive)
P/L 30mm Thick Bituminous Concrete, Thermoplastic Road Marking and Maintenance of Side Drain on Salani Devni Pipalwala Road Km 1/00 to 2/00 and Shambuwala Nehra Kun Road Km 3/840 to 7/040
Construction of retaining wall, Breast wall, road side drain, repair of culverts, wire crate protection work, providing and fixing crash barriers and cement concrete pavement road in various reaches between Km 3/000 to 14/400
ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture and Dumping Structure in km 0/0 to 3/750 including five years routine maintenance under PMGSY-IV Batch-I
ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture and Dumping Structure in km 0/0 to 8/090 including five years routine maintenance under PMGSY-IV Batch -I
ROFD, Protection works, Cross Drainage Works, Metalling and tarring, Road side drain, Crash barriers, Road furniture and Dumping Structure in km 0/0 to 8/780 including five years routine maintenance under PMGSY-IV Batch-I
ROFD metaling and tarring , R/wall,B/wall, CD works, V-shape drain and parapets road furniture crash barrier and signe board under CRF Job No hp 2018-19-147
C/O W-Metal Beam (W) Crash Barrier i/c edge Wall at RD 2/720 to 3/050 and C/o V-Shape Drain at Various RD Under PDNA