Loading…
Loading…
178 results • Best match
Construction of R.C.C Retaining wall with cover drain, R.C.C drain, Earth filling, brick soling Railing for car parking, re-carpeting, road marking etc. at Santikali Ashram, Amarpur, Gomati, Tripura during the year 2022-23. Gr- I
Construction of R.C.C Retaining wall with cover drain, R.C.C drain, Earth filling, brick soling Railing for car parking, re-carpeting, road marking etc. at Santikali Ashram, Amarpur, Gomati, Tripura during the year 2022-23. Gr-2
Mtc. of different roads within the jurisdiction of Jawharnagar PWD (RnB) Sub-Division during the year 2024-25/SH- Providing and fixing Retro-reflectorised Traffic Signs, Direction and Place ldentification Sign Board, Road marking strips tetro-refl
Grouting, BC and road marking works etc.
on different roads under jurisdiction of the Takarjala Sub Division PWD(RnB), Sepahijala District, Tripura during the year 2021-22
Improvement of road starting from Gurkhabasti (Nehru Park) to internal Electrification via DWS Chief Engineer Office and backside of Pragna Bhawan during the year 2022_23_SH_BM, BC, road marking , paver block and other allied works (Length is 1.074 K
Development of Agartala town roads under the jurisdiction of Central-VII Sub-Division SH Maintenance of road under Flyover from P - 31 upto Battala Market alongwith BC work, pot holes repairing, road marking etc and other allied works
Improvement of road starting from Sarkar Para to Garden High Resort road under AMC ward no_6_SH_WBM_II, WBM_III, Carpeting, seal coat, road marking, retaining wall, toe wall, road side drain and other allied works etc.(length is 850.00 Mtr).
Ordinary Repair OR on NH 08 44 during the year 2019 20 SH Providing and Installation of Crash barriers at accident prone locations in Hilly Terrain on NH 08 44 from Ch.406.00 km to 422.00 km
Periodical repair of road starts from Front gate of Tripura Legislative Assembly to Extended Part of Secretariat Building (Internal Roads), during the year 2024_25 _SH_ BC, Tack coat, Road marking strips, Road stud, Traffic Signs and other allied wo
Traffic Signs, road marking, and other road furniture.
FDR of Road from Biswaraisardar Para to Dunharong Para Link no. L042 Length 3.800 km under Takarjala Sub Division during the year 2024 25. S.H Grouting, Patch WBM-3, Carpeting, Seal coat,Road marking,pucca drain and Surface drain etc.
Strengthening of roads under Udaipur UMC area of Length 8.10 Km during the year 2021-2022 SH- Re-Carpeting , Seal coating , Grouting , road marking etc. with the savings fund of Special Assistance Project to State for Capital Expenditure 2020-21
Development of Agartala town roads under the jurisdiction of Central-VII Sub-Division SH Maintenance of road under Flyover, only Eastside from Drop Gate Fire Station upto P - 31 alongwith BC work, pot holes repairing, road marking etc and other allie
Improvement of Road start from Chandrapur to Salbagan_Khayerpur Bypass (near Shanitala) via Jamtala and laddo Chowmohoni and AMC ward no. 8 and 10_SH_ DBM, BC,road marking and other allied works (Length is 2.7plus 0.6 equals to 3.30 KM) under Scheme
Maintenance of road starting from GB to SDO chowmony road(79 tilla) to By pass road via Ballokia tilla Bath Three under AMC ward no 6 year 2021_22_SH_ Grouting , Carpeting , Seal coat, road marking, toe wall etc. (Length is 900.00 m ).
FDR Maintenance of road from Lalbahadur club to Dhaleswar Road No 18 L 1.02 Km Agartala during the year 2024 25 SH Patch Grouting, overlaying 30 mm BC and road marking etc. under the Jurisdiction of Central V, Sub Division
Road marking during the year 2022_2023_Road marking start from VIP road (started from Astabal Bridge to Lichubagan) Ch. from 0.00 km to 3.30 km and Road starts from Bholagiri Barjala road Ch. from 0.00 km to 1.00 km _S.H_ Road
Development of Agartala town roads under the jurisdiction of Central-VII Sub-Division SH Maintenance of road under Flyover, only Westside from Drop Gate Fire Station upto P - 31 alongwith BC work, pot holes repairing, road marking etc and other allie
Retro-reflective edgle line marking,road studs etc. from Ch. 0.00 km to 9.00 km
SH-Grouting, Re-carpeting , seal coat , Road marking etc.
SH-Grouting, Re-carpeting , seal coat , Road marking etc.
Patch Metalling, PMC, sand seal coat, road marking etc
Mtc. of road within Kanchanpur PWD R and B Division during the year 2020 2021 Total Length 5.00 Km SH Providing and placing road safety items including road furniture.
Improvement of Amarpur RD Block Road from Gate no-1 to Gate no-2 (L-0.450 km) under Amarpur RD Block during the year 2025-26.SH- Widening, GSB,WBM-II, WBM-III, PMC(Paver machine) and road marking and furniture etc
Maintenance of Agartala town road during the year 2022 23 Road Portion from J N Bari Road to Old BSNL Office Gali Road under the jurisdiction of Central III sub Division SH Pot hole repair, ReCarpeting, Road Marking etc. L 150.00 m
S.H- Grouting, re-carpeting, seal coat and road marking etc.
SH-Grouting, re-carpeting,seal coat and road marking etc.
FDR_ Maintenance of road during the year 2024_25_ Maintenance of Road from VIP Road to Qtr. of SP West via Badminton Court and New Capital Complex Park under AMC Ward No.5 _SH. WBM, Grouting , Carpeting, Seal coat, Road Marking and other allied works
WBM, grouting re-carpeting stone seal coat and road marking work
SH - GSB, WBM Gr-III, Carpetting, seal coat, road marking etc.
Metalling, grouting, PMC, road marking etc. during the year 2025-26
Metaling, grouting, PMC, Road Marking etc. during the year 2026-27.
Metaling, grouting, PMC, Road Marking etc. during the year 2026-27
Metaling, grouting, PMC, Road Marking etc. during the year 2026-27
Maintenance of PWD road within the jurisdiction of Amarpur PWD( RandB), Division during the year 2023-24 SH- Providing and Installation of Place Identification Signboard and road safety Traffic Signboard etc. (2nd Call)
Imp of road frm D.K. rd to K.K. rd via Zela parisad office L 1.95 Km Portion from 0.00 to 1.70 Km under Part-XI Impl. of SNA SPARSH Mode) of the SH GSB, WBM 2,WBM 3, seal coating, rd side drain, road signage etc. comp. Job No.TPCOM183 2025 26
Road Marking as Zebra Crossing and STOP in 19 nos. junctions in Agartala City
Sub-Division, Baikhora South Tripura during the year 2021-22.
Grouting, re carpeting, tack coat,Seal coat, Jungle cutting, unlined drains, cc drain, road marking
Estimate on implementation of Road Safety Audit report as per recommendation of CRRI, New Delhi for the work of 20.00 km stretch from Lichubagan Tri-junction to Mohanpur Intersection of NH-108-B in the State of Tripura.
WBM-2 WBM-3, Carpeting, Seal coat, Brick Masonry drain,Road Marking and surface drain etc.
SH- Re-carpeting in/c grouting, CC drain, Road marking and signs, wearing course etc.(2nd call).
Grouting,re carpeting, tack coat,Seal coat, Jungle cutting, unlined drains,pucca drain,toe wall,road marking
SH-Grouting,Recarpeting, Seal coat, Road side pucca drain, 1 (one) CD, road marking and signs etc.
SH- Grouting, bituminous concrete, paver block, surface drain, road marking and road reflector etc. and road refl
Bituminous concrete, metalling, GSB, laying of paver and construction of RCC road side cover drain including road markings and sign boards during the year 2025-26. (Under RIDF-XXXI of NABARD).
B.B road (Near power house) road to Hospital road (L-0.30 Km) /SH- Flat Brick Soling, Brick Edging, WBM-III, Carpeting, CD Culverts, Paver Block, Road Markings, and Roadside Drainage etc.
SH Patch Grouting Carpeting with sand seal coat Brush Seal coat Road Marking Strips and other allied works
SH Patch Grouting Carpeting with sand seal coat Brush Seal coat Road Marking Strips and other allied works