Loading…
Loading…
507 results • Best match
M9523676007, M9520676005, M9504676003, M9562670001, +5 more
Annual maintenance of Air conditioners available at general locations (not in equipment areas) in Stage-I, II & III Power house area, RTPP except CHP area, Stage-II & III Pump house & Ash Plant (PLC) areas for the year 2017-18 for the period from 05.05.2017 to 31.03.2018.
Pulivendula Municipality- Providing of Water Supply Infrastructure works i.e., Clear Water sump, Pump House, Pump sets, Clear Water Feeder mains, ELSRs 3800 KL, Distribution mains , SCADA and Performance based O&M of Water Supply Scheme & Appurtenances for 7 years inclusive of Defect Liability Period of 2 years in Pulivendula Municipality
Supply Installation Commissioning of 5 nos of Digital Water Level Recorders and telemetry including Protection box fencing and security arrangements establishment of Data Acquisition system and its maintenance for Real Time Ground Water Level monitoring with drilling of bore wells and Supply Installation Commissioning of 8 nos of Electro Magnetic Flow meters for Real time ground water discharge quantity monitoring at APMDCs Mangampet Barytes Project Kadapa District
Regular and Breakdown repair works of C&I Equipments in BOP Area of 17Nos PLC Control Systems in EM, MRT and I&C Stage-V as and when required during the period from 01.06.2024 (or) from the date of actual utilization to 31.03.2025 for the year 2024-25.
SRP20TS045
Supply installation, commission & validation PLC & HMI based system test setup for measurement of no
Providing of 13 numbers contractors workers for carrying out operation including PLC, Upkeeping of mechanical works, electrical works & instrumentation of equipment, monitoring, trouble shooting and preventive maintenance of sea water intake pump house (except ECP) of Unit-I & II of SDSTPS for a period of 12 months from 01.04.2017 to 31.03.2018.
Removal of Jungle and new plantation and water supply at Old PLC of TB Dam
Supply of Arduino Opta RS485, Supply of Opta Wifi, Supply of Arduino PLC Starter Kit
PACKAGE-II Implementation of Instrumentation, Automation and SCADA system with Retrofitting & Repairs of Pump house, WTP and Pumping network of Real time operation, monitoring and NRW audit from pumping Station to all Service reservoirs under the Commanding area of 10 MGD WTP at Krishnapuram Head Water Works, Godavari drinking water supply scheme and TSR distribution System
Operation & Maintenance of MVS Scheme to K.D.Peta and Other Habitations for the Year 2024-25 (Excluding Power Charges) in Golugonda Mandal in Anakapalli District. (Sub work):- "Providing Operation and Maintenance of Scada System of MVS to K.D.Peta and Other Habitations in Golugonda Mandal in Anakapalli District for the year 2024-25 Est cost: Rs.9.50/65.00 lakhs
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Construction Permanent Campus for Indian Institute of Technology at Merlapaka Village, Yerpedu Mandal Chittoor Dist., A.P. Phase-I (Stage-IC) Sub Head 1:- Integrated Building Management System (IBMS) (Plant Manager, HVAC, Low Side, Water Management ... Power SCADA for ...
Engaging of 1 No. Car (4+1 Seater) Diesel/Petrol /Hybrid / CNG/ Bio-Fuel /EV or any type (preference to be given to EV) on Monthly hired basis for the use of Executive Engineer/ SCADA & UG CABLES/VSP for a period of 11 MONTHS i.e., from 01.05.2026 to 31.03.2027 (11months). The vehicle is under the control of the Executive Engineer/ Operation/Visakhapatnam
Procurement of Schneider Electric make HMI Touch Screen for Fire WaterBooster and Foam Pumphouse PLC at NTPC BARH.
Supply of Essential materials for maintenance of quarters in PLC Colony, Amaravathi Colony of TB Board, TB Dam.
Procurement of Ambient Air Quality Data Services
Digging of borewells at TBP Hospital & Nethaji Park and Providing electrical boards for borewell @ old PLC 6 nos, TB Dam.
Supply of Spare Control Card, Power Card and PLC for Slewing and Travel DC Drive panels of Stacker/Reclaimer-II
Engaging 4 Nos.units Highly skilled (BE/B.Tech Qualified with computer knowledge) 4 units skilled persons (DEE qualified with computer knowledge and 1 unit unskilled work of attender (General Shift) on works contract basis through outsourcing agency ... the SCADA Control ...
Carrying out the Operation & Maintenance Mechanical Electrical and C&I PLC Operations and Up keeping works of complete Coal Handling Plant of SDSTPS StageII for the period from 01 11 2023 to 31 03 2024 including T and P and Consumables as per tender specification Excluding GST or from the date of actual commencement of work to 31 03 2024
Carrying out the Operation & Maintenance Mechanical Electrical and C&I PLC Operations and Up keeping works of complete Coal Handling Plant of SDSTPS StageII for the period from 01 11 2023 to 31 03 2024 including T and P and Consumables as per tender specification Excluding GST or from the date of actual commencement of work to 31 03 2024
Engaging of 4 Units of Highly qualified (BE/B.Tech-EEE Qualified with computer knowledge) 4 units of skilled works (DEE qualified with computer knowledge) and 1 unit unskilled work of attender (General shift) on work contract basis through ... the SCADA Control ...
Supply, Installation and testing of Electromagnetic Flow meters with GPS Data logers and Actuator based control valves with SCADA complete software and Hard ware for both inlet and outlet pipes for 75 HP HLPS feeder main connected ELSR's, N.R Nagar feeder main connected ELSR's and old bus stand feeder main connected ELSR's to remote monitoring at Command Control Room, Ashok Nagar Head Water Works. (Maintenance period one year) (2nd call)
Manning of the SCADA (Supervisory Control and Data Acquisition System) Control Center round the clock on 24x7 Hrs basis in Visakhapatnam City by engaging 4 Units of Highly skilled works (BE/B.Tech- EEE Qualified with computer knowledge) 4 units of skilled works (DEEE Qualified with computer knowledge) and 1 unit unskilled work of attender (General Shift) on works contract basis for the period from 01.06.2018 to 31.03.2019 in Operation Circle, Visakhapatnam
Engaging of 4 Units of Highly skilled works (BE-B.Tech-EEE Qualified with computer knowledge) 4 units of skilled works (DEE qualified with computer knowledge) and 1 unit unskilled work of Attender (General Shift) on work contract basis through ... the SCADA Control ...
Supply, Installation and testing of Electromagnetic Flow meters with GPS Data logers and Actuator based control valves with SCADA complete software and Hard ware for both inlet and outlet pipes for B. Peta feeder main connected ELSR's, B. Camp feeder main connected ELSR's and 40 HP (9.00 MGD) feeder main connected ELSR's to remote monitoring at Command Control Room, Ashok Nagar Head Water Works. (Maintenance period one year). (3rd Call)
Replacement of damaged vitrified tile flooring at SP2B in SLP and Replacement of damaged Roof Sheets with New Sheets at SRC and Proposed repair cum renovation works at Telemetry Substation, ASLV DG room, substation, SDSC SHAR.
Engaging of 4 nos. Highly Skilled Persons (BE/BTech-EEE qualified with Computer Knowledge), 4 nos. Skilled Persons (DEEE qualified with Computer Knowledge) and 1 no. unskilled Person for Attender (general Shift) on works contract basis through ... the SCADA (Supervisory ...
Engaging of 4 Nos. Technical Assistant (Highly Skilled) works (BE/BTech-EEE qualified with Computer Knowledge), 4 Nos. Technical Assistant (Skilled) (DEEE qualified with Computer Knowledge) and 1 No. work of Attender (Unskilled) on works contract ... the SCADA (Supervisory ...
Engaging of 4 nos. Highly Skilled Persons (BE/BTech-EEE qualified with Computer Knowledge), 4 nos. Skilled Persons (DEEE qualified with Computer Knowledge) and 1 no. unskilled Person for Attender (general Shift) on works contract basis through ... the SCADA (Supervisory ...
Supply and fitment of PLC CAN Module suitable to Electro Pnuematic and Hydraulic make Wheel press - 500 T, Specifications:- 250 kbps Bud rate. Operating voltage : 24 V DC, No of ports : 02 No's, Port type: VGA port, No of DIP Switches, No of Inputs : 16 No's, No of Digital Inputs : 16 No's, No of Outputs : 13 No's, Interfacing module: EPH make PCDSC card , Make:- EPH or ADITECH or Advantech or Equivalent
SITC 1250A RATED INCOMER FOR VFD PANEL, SITC 2X55 KW VFD WITH PANEL, SITC 1X315KW VFD WITH SOFT STARTER, SITC PLC PANEL FOR VFD SYSTEM
Upgrad. of LV drive for DHT ID/FD fan, Upgrad. of PLC in DHT ID/FD fan VFD, Upgrad. of HMI in DHT ID/FD fan VFD
Custom Bid for Services - Perdiem charges on normal working days, Custom Bid for Services - Perdiem charged on Holidays, Custom Bid for Services - Overtime charges on Normal working days, Custom Bid for Services - Overtime charges on Holidays, Custom ... Aadvance PLC -Normal, ... Aadvance PLC Holiday, ... Aadvance PLC -Normal, ... Aadvance PLC - ...
Engaging of 10 Nos., i.e., 4 Nos., Technical Assistants (Highly Skilled) (BE/BTech-EEE qualified with Computer Knowledge), 4 units of Technical Assistants (Skilled) (DEE qualified with Computer Knowledge) and 1 unit unskilled work of Attender ... the SCADA (Supervisory ...
Rerouting of 11 KV line in PLC passing over houses to front side of ICE Plant, strengthening of LT line in PLC area for all existing 250 KVA Transformers, Numbering of HT and LT poles and painting of code numbers to DTS under dam jurisdiction and providing new GOS center and reconditioning of existing GOS pertaining to the Lines section, Operation sub Division, TBHES,TB Dam
Regular and Breakdown repair works of C&I Equipments in BOP area of PLC Control systems of EM,MRT,I&C as and when required during the period from 01.04.2026 to 31.03.2027
Design,supply,installation,testing and commissioning of Tank Farm Management System Package comprising of Tank Farm Management System, Safety PLC System, Hydrocarbon Vapours Detection System etc along with associated works at VISHAKHAPATNAM TERMINAL
Supply, Configuration and Integration of 5,00,000 Nos. of 3-Ph, (10A-60A, Class 1.0) whole current Smart Energy Meters as per IS 16444 part-1 along with required software (HES/MDAS/MDMS), with necessary hardware and Software integration with APCPDCL ... (.i.e. SCADA , ...
Supply, Configuration and Integration of 11,00,000 Nos. of 3ph, (10A-60A, Class 1.0) whole current Smart Energy Meters as per IS 16444 part-1/3ph, (10A-60A, Class 1.0) along with required software (HES/MDAS/MDMS), with necessary hardware and Software ... (.i.e. SCADA , ...
CHARGE AIR TEMP CONTRO FOR ENG SRL 1130484 MODEL 8L40/60B(EM3080B-E11-99411-0298-4), PLC ANALOG INPUT MODULE 07A/91(EM3080B-11-99119-0108), CHARGE AIR TEMP CONTRO FOR ENG SRL 1130483 MODEL 8L40/60B(EM3080B-E11-99411-0298-3)
Supply, Installation, Configuration and Integration of 5,00,000 Nos of 3PH, (10A-60A, Class 1.0) whole current Smart Energy Meters as per IS 16444 part-1/3PH, (10A-60A, Class 1.0) whole current Energy Meters as per IS 13779 with Local Communication ... i.e. SCADA , ...
Engaging of 1 No CAR 4 plus 1 seater to Executive Engineer SCADA and UG Cable Visakhapatnam for a period of 11 MONTHS from may 2026 to March 2027 The vehicle is under the control of the Executive Engineer Operation Visakhapatnam with a model of 2021 and above for a Period of 11 months from may 2026 to March 2027
Supply, Configuration and Integration of 11,00,000 Nos of 3Phase, 10A-60A, Class 1.0 whole current Smart Energy Meters as per IS 16444 part-1/3phase, 10A-60A, Class 1.0 whole current Energy Meters as per IS 13779 with Local Communication as ... like SCADA , ...
Supply, Configuration and Integration of 11,00,000 Nos. of 3Ph, (10A- 60A, Class 1.0) whole current Smart Energy Meters as per IS 16444 part-1/3Ph, (10A-60A, Class 1.0) with required software (HES, MDMS/ MDAS), with necessary hardware and Software ... (.i.e. SCADA , ...