Loading…
Loading…
1,454 results • Best match
Providing Sewage Treatment Plants (STPs) at the Location of Rajahmundry (Bommuru-I (1.50MLD) and Thorredu(0.50 MLD)) (2.00 MLD), Peddapuram (Valuthimmapuram) (2.00 MLD), Amalapuram (Bodasukuru) (1.00 MLD), Mandapeta (Gollapuntha) (3.00 MLD), Pithapuram (Gorsa) (0.50 MLD), Ramachandrapuram (Kothuru-I) (0.75 MLD) and Samalkota ((Jaggamvaripeta(0.50MLD) and Uppuvari Satram(0.50MLD)) (1.00 MLD) (Total 10.25 MLD), East Godavari district of Rajahmundry Circle, APTIDCO Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project.
Investigation, Survey,Design,Supply,Construction, Installation, Testing and commissioning of 10 (Ten) Sewerage Treatment Plants of Total Capacity 14.70 MLD,Kurnool-1-3.0 MLD, Kurnool 2 - 1.0 MLD, Kurnool 3 - 0.50 MLD, Kurnool 4 - 0.50 MLD, Adoni - ... entire Sewage Treatment Plants for ...
Providing Sewage Treatment Plants (STPs) at the Location of Rajahmundry (Bommuru-I (1.50MLD) and Thorredu(0.50 MLD)) (2.00 MLD), Peddapuram (Valuthimmapuram) (2.00 MLD), Amalapuram (Bodasukuru) (1.00 MLD), Mandapeta (Gollapuntha) (3.00 MLD), Pithapuram (Gorsa) (0.50 MLD), Ramachandrapuram (Kothuru-I) (0.75 MLD) and Samalkota ((Jaggamvaripeta(0.50MLD) and Uppuvari Satram(0.50MLD)) (1.00 MLD) (Total 10.25 MLD), East Godavari district of Rajahmundry Circle, APTIDCO Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project
Providing Sewage Treatment Plants (STPs) at the locations of 1) Ichapuram 0.10 MLD 2) Palasa 0.40 MLD in Srikakulam District 3) Appikonda 0.40 MLD 4) Mulagada 0.20 MLD 5) Nadipur 0.50 MLD 6) Sangivalasa 0.30 MLD and 7) Kondakoppaka 0.20 in Visakhapatnam District (Total 2.10 MLD) of Deputy Chief Technical Officer, Visakhapatnam Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project) (3rd call).
Providing Sewage Treatment Plants (STPs) at the locations of 1) Ananthavaram (0.20 MLD), 2) Dondapadu (0.50MLD ), 3) Thulluru (0.20 MLD) 4) Madadam (0.20 MLD) 5) Inavolu (0.30 MLD) 6) Nowluru (0.30 MLD) 7) Penumaka (0.30 MLD) 8) Nidamarru (0.30 MLD) (Total 2.30 MLD) Guntur District of Deputy Chief Technical Officer, Guntur Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project)
Providing Sewage Treatment Plants (STPs) at the locations of 1) Atchau Lova I (1.00 MLD) 2). Atchau Lova 2 (1.00 MLD) 3). Sirasapalli (0.30MLD) of GVMC ULB ).Yelamanchili (0.20 MLD)of Yelamanchili ULB 5) Narsipatnam I (0.60 MLD) 6) Narsipatnam 2 (0.30 MLD) of Narsipatnam ULB in Visakhapatnam District (Total 3.40 MLD) of Deputy Chief Technical Officer, Visakhapatnam Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project).
Providing Sewage Treatment Plants (STPs) at the locations of 1) Vellaturu road II (0.70 MLD) in Vinukonda ULB in Guntur District, 2) Chakirala III (0.50 MLD) in Kanigiri ULB, 3) Modempalli III (0.60 MLD) in Giddaluru ULB 4) Singarakonda III (0.50 MLD) in Addanki ULB in Prakasam District (Total 2.30 MLD) of Deputy Chief Technical Officer, Guntur Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project)
Providing Sewage Treatment Plants (STPs) at the locations of 1)Jakkampudi I (A) ( 0.90 MLD) in Vijayawada ULB, 2) Jakkampudi II (B) ( 0.60 MLD) in Vijayawada ULB, 3)Jakkampudi III (C) ( 0.90 MLD) in Vijayawada ULB, 4)Jakkampudi IV (D) ( 0.90 MLD) in Vijayawada ULB (Total 3.30 MLD) in Krishna District of Deputy Chief Technical Officer, Guntur Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project)
Providing Sewage Treatment Plants (STPs) at the locations of 1) Ichapuram (Ichapuram) 0.10 MLD, 2) Palasa (Palasa) 0.40 MLD in Srikakulam District 3) GVMC (Appikonda) 0.40 MLD, 4) GVMC- (Lankelapalem) 0.20 MLD, 5) GVMC (Mulagada) 0.20 MLD, 6) GVMC (Nadipur) 0.50 MLD in Visakhapatnam (Total 1.80 MLD) of Deputy Chief Technical Officer, Visakhapatnam Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project)
Providing Sewage Treatment Plants (STPs) at the locations of 1)Suddagedda 0.10 MLD, 2) Bhanolithota 0.30 MLD 3) Bhanolithota 0.20 MLD 4)Pedagantyada 0.30 MLD, 5) Kondakoppaka 0.20 MLD, 6)Sirasapalli 0.30 MLD, 7)Padhmanabha Nagar 0.40 MLD, 8)Kommadhi II 0.20 MLD in Visakhapatnam District (Total 2.00 MLD) of Deputy Chief Technical Officer, Visakhapatnam Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project)
Providing Sewage Treatment Plants (STPs) at the locations of 1) Ichapuram 0.10 MLD 2)Palasa 0.40 MLD in Srikakulam District 3)Appikonda 0.40 MLD 4) Mulagada 0.20 MLD 5) Nadipur 0.50 MLD 6) Sangivalasa 0.30 MLD and 7) Kondakoppaka 0.20 in Visakhapatnam District (Total 2.10 MLD) of Deputy Chief Technical Officer, Visakhapatnam Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project) (3rd call)
Providing Sewage Treatment Plants (STPs) at the locations of 1) Ananthavaram (0.20 MLD) 2) Dondapadu (0.50MLD) 3) Thulluru (0.20 MLD) 4) Madadam (0.20 MLD) 5) Inavolu (0.30 MLD) 6) Nowluru (0.30 MLD) 7) Penumaka (0.30 MLD) 8) Nidamarru (0.30 MLD) (Total 2.30 MLD) Guntur District of Deputy Chief Technical Officer, Guntur Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project).
Providing Sewage Treatment Plants (STPs) at the locations of 1) Ichapuram 0.10 MLD 2) Palasa 0.40 MLD in Srikakulam District 3) Appikonda 0.40 MLD 4) Mulagada 0.20 MLD 5) Nadipur 0.50 MLD 6) Sangivalasa 0.30 MLD and 7) Kondakoppaka 0.20 in Visakhapatnam District (Total 2.10 MLD) of Deputy Chief Technical Officer, Visakhapatnam Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project) (3rd call).
Providing internal C.C Road from 10MLD STP to 20MLD STP at Ramalingeswara Nagar.
Providing internal C.C Road from 10MLD STP to 20MLD STP at Ramalingeswara Nagar.
Construction of Compound Wall for FSTP Site at Dubagunta 28th ward in Kandukur Municipality
Construction of MRF Centre at backside of FSTP in Karampudi Road of Vinukonda Municipality.
Custom Bid for Services - Hiring of Effluent Treatment Plants (ETPs) at Gopavaram GGS, Kesanapalli (W) GGS and Pasarlapudi GCS for Rajahmundry Asset for a period of 05 years Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant...
Servicing of STP Plant
Construction of CC Drain from Back Side of FSTP to Burripalem Main Road at Compost yard in 4th Ward of Tenali Municipality. Under 15FC 2020-21: Untied Grant, (2nd Instalment)
UP-GRADATION / REFURBISHING OF EXISTING 10 MLD STP TO 15 MLD STP (INCLUDING ESTABLISHMENT OF NEW 5 MLD STP) OF VISAKHAPATNAM PORT AUTHORITY (VPA)
Providing Borewell and Water supply pipeline network to FSTP andPallagiri dumping yard in Nandigama Municipality.
Construction of new building for septic tankers staff at Harandhapuram FSTP in Nellore Municipal Corporation.
Kadapa Municipal Corporation - Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Sewage treatment Plant of 20 MLD capacity based on Open Technology with three months trail run, Providing of balance sewer lines in existing Underground Drainage network in the entire area of Zone-I & II of Kadapa Municipal Corporation and Providing 30000 House Service Connections in the entire area of Kadapa Municipal Corporation including 2 (Two) years Defect Liability Period and Post completion Operation and Maintenance of entire sewerage Treatment Plant for 10 (Ten) years including 2 (Two) years Defect Liability Period in Kadapa Municipal Corporation
Kadapa Municipal Corporation - Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Sewage treatment Plant of 20 MLD capacity based on Open Technology with three months trail run, Providing of balance sewer lines in existing Underground Drainage network in the entire area of Zone-I & II of Kadapa Municipal Corporation and Providing 30000 House Service Connections in the entire area of Kadapa Municipal Corporation including 2 (Two) years Defect Liability Period and Post completion Operation and Maintenance of entire sewerage Treatment Plant for 10 (Ten) years including 2 (Two) years Defect Liability Period in Kadapa Municipal Corporation
Kadapa Municipal Corporation - Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Sewage Treatment Plant of 20 MLD capacity based on Open Technology with three months Trail run, Providing of balance sewer lines in existing Underground Drainage net work in the entire area of Zone-I & II of Kadapa Municipal Corporation and Providing 30000 Houser Service Connection in the entire area of Kadapa Municipal Corporation including 2 (Two) years Defect Liability Period and Post Completion Operation and Maintenance of entire Sewerage Treatment Plant for 10 (Ten) years including two years Defect Liability Period in Kadapa Municipal Corporation.
Tadipatri Municipality - Repairing of 25 HP & 30 HP Motors in STP-1 and STP-2
ULTRA FILTRATION MEMBRANE FOR STP
Providing Sewage Treatment Plants (STPs) at the locations of 1) ASR Nagar ( 0.20 MLD) in GVMC ULB, 2) AtchauLova-I (1.00 MLD) 3)AtchauLova-II (1.00 MLD) in GVMC ULB 4) Narsipatnam I (0.60 MLD), 5) Narsipatnam II (0.30 MLD) in Narsipatnam ULB and 6) Yelamanchili (0.10 MLD) in Yelamanchili ULB (Total 3.30 MLD) in Visakhapatnam District of Deputy Chief Technical Officer, Visakhapatnam Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project)
Providing Sewage Treatment Plants (STPs) at the locations of 1) Vellaturu road II (0.70 MLD) in Vinukonda ULB in Guntur District, 2) Chakirala III (0.50 MLD) in Kanigiri ULB, 3) Modempalli III (0.60 MLD) in Giddaluru ULB 4) Singarakonda III (0.50 MLD) in Addanki ULB in Prakasam District (Total 2.30 MLD) of Deputy Chief Technical Officer, Guntur Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project) (3rd call)
Providing Sewage Treatment Plants (STPs) at the locations of 1) Biradawada (0.90MLD) in Naidupet-II ULB 2) Mannrupoluru (0.80MLD) of Sullurupeta II ULB 3) Chevireddypalli (0.80MLD) of Venkatagiri II ULB (4) Akkacheruvupadu II (1.60MLD) (5) Kallurupalli II(1.10MLD) (6) Kondlapudi II and III (1.20 MLD) of Nellore ULB (Total 6.40MLD) in Nellore district of Deputy Chief Technical officer, Nellore Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project)
Providing Sewage Treatment Plants (STPs) at the locations of 1)Tanuku-(Bala Balaji 0.30, 2)Tanuku (Indiramma Colony II) 0.20 MLD 3)Jangareddygudem (Markendeyapuram II) 0.40 MLD, 4) Nidadavolu (Tirugudem II) 0.50 MLD, 5) Kovvuru (Pedathallapunta II) 0.30 MLD, 6) Eluru (Ponangi road) 2.50 MLD and 7) Eluru (Kotturu road II) 0.20 MLD in West Godavari District Total 4.40 MLD of DCTO, Rajamahendravaram Circle, APTIDCO Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project)
Providing Sewage Treatment Plants (STPs) at the Location of Rajahmundry (Bommuru-I (1.50MLD) and Thorredu(0.50 MLD)) (2.00 MLD), Peddapuram (Valuthimmapuram) (2.00 MLD), Amalapuram (Bodasukuru) (1.00 MLD), Mandapeta (Gollapuntha) (3.00 MLD), Pithapuram (Gorsa) (0.50 MLD), Ramachandrapuram (Kothuru-I) (0.75 MLD) and Samalkota ((Jaggamvaripeta(0.50MLD) and Uppuvari Satram(0.50MLD)) (1.00 MLD) (Total 10.25 MLD), East Godavari district of Rajahmundry Circle, APTIDCO Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project. (3rd Call)
STP 0.75 HP 125 INCH, STP 1.5 HP 125 INCH, STP 1.5 HP 150 INCH Bidder Turnover (Last 3 Years) 759 Lakh (s) Experience Criteria 3 Year (s)
Operations and Maintenance of 100 kLD STP, 275 KLD STP, 325 KLD STP, 55 kLD WTP and 600 kLD WTP Plants at IIT Tirupati, Venkatagiri - Yerpedu Road, Yerpedu (M), Tirupati (Dt)
Repairs and Annual Maintenance of 1 MLD STP at Boayapalem, 2 MLD Marikavalsa OLD & NEW STP s, 2 MLD STP at YSR nagar, 3 MLD STP at Vamaby Colony, in Zone-II of GVMC for the period of 12 Months.
Providing CC Road at STP Entrance.
SERVICING OF STP on TCI PRABHU
CONSTRUCTION OF FSTP AT YALLVARI STREET BURIAL GROUND, NEAR ABC CENTRE SOUTH SIDE IN 19TH DIVISION JAGANNAICPUR
Repairs to 20KLD FSTP plant at Compost Yard in 4th ward of Tenali Municipality under General fund
Operation and maintenance laboratory for analysis of sewage sample of 38 MLD STP, 25 MLD STP and 13 MLD STP at Laxmi Talkies, Appughar & Mudasarlova for the year 2017-18.
Construction of Compound wall to Auto Nagar 10 MLD STP (Eastside) and Providing Fencing for Auto Nagar STP (Westside).
Investigation, Design & construction of Physical Infrastructure and Social Infrastructure in EWS layouts at Mangalagiri, Narasaraopeta ULBs in Guntur District, Kandukuru ULB in Prakasam district, Physical Infrastructure at Ananthavaram, Dondapadu, ... (2) Sewage Treatment Plants (STPs) ...
Providing Sewage Treatment Plants (STPs) at the locations of 1)S.W. Hostel II (0.90 MLD) in Srikalahasthi II ULB, 2) Murukumbattu II (1.30MLD) in Chittoor ULB and 3) Nandimangalam II (0.20 MLD) in Puttur ULB 4)Ethuru II (0.70 MLD) in Punganur ULB 5) Venkappakota II (0.90 MLD) in Madanapalli ULB, Rajiv Nagar I(1.00 MLD) in Srikalahasthi I ULB (Total 5.00 MLD) Chittoor district of Deputy Chief Technical officer, Nellore Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project)
Providing Sewage Treatment Plants (STPs) at the locations of 1)Sonia nagar (0.50 MLD) in Vizianagaram ULB 2)Nellimarla (0.30 MLD) in Nellimarla ULB 3)Bobbili (0.80 MLD) in Bobbili ULB 4) Saluru (0.60 MLD) in Saluru ULB 5) Parvathipuram (0.40 MLD) in Parvathipuram in Vizianagaram District and 6) Kancharam (0.20 MLD) in Rajam 7) Byrsastrullapet (0.30 MLD) in Amadalavalsa in Srikakulam District (Total 3.10 MLD) of Deputy Chief Technical Officer, Visakhapatnam Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project)