Loading…
Loading…
3,478 results • Best match
Deslugding of sludge drying beds and adjacent roads at Najafgarh STP. (Re-invite)
Renovation and face lifting of Admin block at Yamuna Vihar STP. (Re-Invite)
Repairing, raising and strengthening of existing damaged stone boundary wall at Keshopur STP.
Replacement of faulty LT cables at Phase I and II STP Coronation Pillar
Repairing of Turn table of FST No. 02 at 16 MGD STP Okhla.
Removal of sludge from 12 Nos. drying beds at Sec-25 STP Rohini.
Renovation of Grit Chamber No. 1 at 16 MGD STP Okhla. (Re-invite)
Renovation of CI sluice gate of bypass channel of Okhla STP. (Re-Invite)
Strengthening and raising of boundary wall along DDA forest land at Ghitorni STP.
Construction of RWH and replacement of old damaged drainage line at Ghitorni STP.
SITC of online system for blower operating arrangement at 20 MGD STP Keshopur
Repairing, Strengthening and raising of boundary wall at various locations at Pappankalan STP
Maintenance of Existing Garden 40 MGD PST and FST area at Keshopur STP
SITC of LT panel boards for various unit at 37 MGD STP Okhla.
Protection/ Strengthening of Steel Structure, Electrical/ Mechanical Equipments at 12 MGD STP Okhla.
Structural painting and white washing of various units of Sec-25 STP Rohini.
Supply of hydraulic operator trolley for Phase I and II STP Coronation Pillar
Renovation of mechanical bar screen No. 01 installed at 16 MGD STP Okhla.
Protection strengthening of electrical and mechanical equipment by painting at 45 STP Okhla.
Complete Maintenance of Trees compensatory plantation at Bawana against STP Kondli Phase-I.
Engagement of Staff for operation and maintenance at Vasant Kunj 2.2 MGD STP
Renovation of PST No 2 at Ph I and II STP Coronation Pillar
Cleaning/ desilting of wet sump of Kalyanpuri SPS in command of Kondli STP.
Development of garden at Rohini Sec-25 STP near east site boundary wall
Cleaning of STP Water Tank at Lada Sarai and Qutab Golf Course, DDA.
Repairing of Course bar Screen and other allied work at16 MGD STP Okhla.
Deployment of staff for running operation and minor maintenance of Molar Band STP.
SITC of newly bore t/wells inside Kapashera STP under AE(EnM)-III.
Renovation and face lifting of ACE(P)-III office block at Okhla STP.
Acrylic painting of water storage tank and balance ACP work at Ghitorini STP.
Renovation and face lifting of EE(SDW)-II office building at Okhla STP.
Operation and Routine maintenance of STP Firefighting System Fire Alarm and PA System.
Fabrication/ supply and fixing of sign boards for various sides at STP Okhla .
Desludging of 15Nos. of sludge drying beds and roads at 20MGD Keshopur STP.
(SH Operation and Maintenance of 50 KLD capacity MBR Technology base STP Plant)
Cleaning/ desilting of wet sump of Jagriti SPS in command of Kondli STP.
Renovation/ strengthening of CI sluice gates at various chamber of Molar Band STP.
Repair Renovation of Geo Miller make mechanical bar screen installed at Narela STP
Cleaning of sludge drying beds and maintenance of filter media at Ghitorni STP.
Renovation of Course Bar Screen No. 1 Installed at 16 MGD STP Okhla.
Comprehensive Operation and Maintenance of STP of capacity 10 KLD at Line-7.
SITC of High Tower CCTV surveillance system with allied works at STP Okhla.
Running Maintenance and Operation of STP, RO and Swimming Pool at NSSC Jasola.
Repainting of Mehrauli STP and SPS and AndrewsGanj SPS under EE (SDW)-XI
Deployment of staff for operation and minor maintenance of 40 MGD STP Keshopur.
Deployment of staff for operation of Effluent Filling Point inside Vasant Kunj STP
Providing and Stacking of Plants and Shrubs under DD(H) West KeshoPur STP
P/L water line in toilet block and security hut at Ghitorni STP.
De-sludging of 12 Nos. drying beds at 15MGD STP Sector-25 Rohini.
Operation and Routine maintenance of STP, Firefighting System, Fire Alarm and PA System.