Loading…
Loading…
3,473 results • Best match
Removal of sludge from sludge thickener at Molar Band STP. (Re-Invite)
Renovation of Grit Removal System No. 1 at 22 MGD STP Okhla.
Improvement of lighting system at Phase I and II STP Coronation Pillar
Construction of road for 40 MGD Effluent Pump House at Okhla STP.
Strengthening of Bridge of FST No. 02 at 45 MGD STP Okhla.
Providing and laying CC pavement road of filling point at Mehrauli STP.
Improvement existing garden along with intake area at Sector 25 STP Rohini.
Day to day repair and maintenance of staff quarters at Okhla STP.
Maintenance of Existing Garden PST and FST area at Pappan Kala STP.
Construction of system for collecting septage from private tankers at Mehrauli STP.
Renovation of Final Settling Tank No. 2 at 16 MGD STP, Okhla.
Running/ Operation of Pump Sets at Harkesh Nagar Drain at Okhla STP.
Complete Maintenance of Trees compensatory plantation against Rithala STP at Bawana WTP.
Renovation/ Strengthening of Intake regulating sluice gate at 45 MGD STP Okhla.
Development of filling point for sale of treated effluent from Chilla STP
Construction of boundary wall along Najafgarh drain near 40 MGD Keshopur STP.
Making Trial Bores for installation of Tube Wells inside Okhla STP Complex.
Construction of security posts for newly developed water bodies at Pappankalan STP.
Providing consultancy services for upgradation of 70 MGD STP at Coronation Pillar.
Improvement of Earthing system of various unit at 45 MGD STP Okhla.
Improvement of Existing Belt along with road site at Pappan Kala STP
Renovation of Esenpro make gear boxes installed at Narela STP re invite
Clearing of wild growth at digester area at Rohini Sec. 25 STP
Lifting/Disposal of sludge from sludge drying beds at Vasant Kunj STP.
Clearing of Jungle 40 and 20 MGD Digester area of Keshopur STP
Improvement in illumination system at various sites of 12 MGD STP Okhla.
Fabrication/ Making/ Installation off Propellers for Aerators at 16 MGD STP Okhla.
Supply of M.S. Trolleys for various units at 40 MGD STP Keshopur
Renovation/Strengthening of Grit Chamber No. 2 at 45 MGD STP Okhla.
Providing And Watering effluent water for horticulture at Rithala STP Phase-I
Providing and Fixing P.P.R. irrigation net work at STP Keshopur FST area
Repairing of clarisettler with all other allied works at Molar Band STP.
Strengthening of Corse Bar Screen No. 2 at 16 MGD STP Okhla.
SITC of high mast light with accessories at 40 MGD STP Keshopur.
Strengthening of flow regulating system at inlet of 16 MGD STP Okhla.
Operation and Maintenance of 50 KLD capacity MBR Technology base STP Plant
Providing concertina coil fencing on effluent channel of Nilothi STP Phase-I.
Pre-conditioning of forestry area along with Phase-IInd Pappan Kala STP
Cleaning of Gravity Duct No.2 from Kilokari SPS to Okhla STP.
Protection/ Strengthening of steel structure, electrical/ mechanical equipments at EPH STP Okhla.
Renovation/ Repair of rolling shutters at 45 MGD STP Okhla. (Re-Invite)
Repair and Maintenance of Rain Water Harvesting at Najafgarh and Dwarka STP.
Replacement of ACBs of main LT panel at 45 MGD STP Okhla.
Supplying and applying of DJB STP water through water tanker at site.
Deployment of staff for running, operation and maintenance of Molar Band STP.
Deployment of staff for running, operation and maintenance of Molar Band STP.
Painting of various steel structures and equipments at 45 MGD STP Okhla.
Providing/Fixing of LED Lights and Fans at 45 MGD STP Okhla.
SITC of dosing system with other allied works at Molar Band STP.
Construction of two nos. security hut at ridge area of Ghitorni STP.