Loading…
Loading…
3,489 results • Best match
Deployment of contractual staff for round the clock and smooth operation of treated effluent filling point at Okhla STP.
Repairing of motor connection Box and other accessories installed at aeration unit of 45 MGD STP Okhla. (Re-Invite)
Providing and fixing of MS sheet of various cable trenches and other allied works at 45 MGD STP Okhla.
Construction of Under Ground Water Tank for STP treated water at CRRI Staff Colony Maharani Bagh New Delhi 110065
Renovation/Strengthening of grit chamber no. 1 with other allied works at 37 (22) MGD STP Okhla. (Re-Invite)
Strengthening of pathway and structure along with allied works of primary clarifier No.2 at 45 MGD STP Okhla.
Fabrication/Making and Fixing M.S. Jall and Stairs for safety purposes at various unit at 45 MGD STP Okhla.
Providing Consultancy Services for the work of Carrying Treated effluent from Nilothi STP to Jaunti Regulator for Irrigation purpose.
Providing and fixing of Jaal on wet sump of 40 MGD sewerage pumping station at Keshopur STP. (RE-INVITED)
SITC of FCMA soft starter for 500 HP (3.3 KV HT) slip ring motor at EPH of Okhla STP.
Engagement of un-skilled workers for cleaning of bar screens at 12, 37, 45 and 16 MGD STP Okhla.
Fabrication/Making and Fixing of junction guarding apparatus and other accessories for Gear box at 45 MGD STP Okhla
Repair of existing pipe line for STP at Sector G-2 Narela, Vishal Bagh and Sector G-8, Narela..
Improvement in cable/ power distribution system with allied works at raw sludge pump house of 12 MGD STP Okhla.
Deployment of contractual staff for round the clock and smooth operation of Treated effluent filling point at Okhla STP.
Construction of roads near inlet along by pass channel, raw pump house and digester at Nilothi STP PH-I.
Renovation/Strengthening of PST (Primary Settling Tank) No. 03 with allied works at 37 MGD STP Okhla. (Re-Invite)
Strengthening of bridge with all allied works of FST No. 1 and 2 installed at 45 MGD STP Okhla.
S/I/T/C of dewatering pump sets and other allied works at 16 and 45 MGD STP Okhla.
SITC of wooden sluice gates with allied works installed near plant entry gate duct at 16 MGD STP Okhla.
Repair/Renovation of Hindustan Door-Oliver Make FST No. 1 installed at 20 MGD STP Papankalan Ph-I Dwarka
Revival of sludge drying beds part-I including disposal of sludge from drying beds at 16 MGD STP Okhla.
Providing/ laying of aluminum cable at aerator No. 06 and 15 of aeration plant at 45 MGD STP Okhla.
Providing/ fixing of different capacity chain pulley blocks at various installations of 12 MGD and 37 MGD STP Okhla.
Deployment of contractual staff for round the clock and smooth operation of treated effluent filling point at Okhla STP
Repairing of existing 150 KLD STP plant based on MBR Technology at DDU college sector 3 Dwarka New Delhi
Supply of Treated effluent from Mehrauli STP to DLF Chhatarpur Satbari and Radhe Mohan Drive Farm House (Re-invite
Supplying, Installation, testing and Commissioning of Power Factor Correction Panel in various STP/parks/Greens under Hort. Division Dwarka.
Renovation/ strengthening of Rail path of moving bridge PST No. 2 (capacity 11 MGD) at 37 MGD STP Okhla
Repairing/Cleaning and Covering of Chambers by RCC Slabs of drying beds at Yamuna Vihar STP Ph-I , II.
Engagement of un-skilled workers for cleaning of bar screens at 12, 37, 45 and 16 MGD Okhla STP.
P L J Internal AND Peripheral sewer lines in Jafarpurur GOC under the command of proposed STP at Jafarpurur.
P L J Internal AND Peripheral sewer lines in Sarangpur GOC under the command of proposed STP at Sarangpur.
P L J Internal and Peripheral sewer lines in Galibpur GOC under the command of proposed STP at Galibpur.
Providing water supply arrangement for automated chemical dosing system and leveling of bypass channel at 16 MGD STP Okhla.
P L J Internal AND Peripheral sewer lines in Kazipur GOC under the command of proposed STP at Kazipur
Annual maintenance contract for Repairing of 600 mm Dia rising main emanating from Batla House SPS to Okhla STP
Strengthening of pathway and structure along with allied works of primary clarifier No. 2 at 45 MGD STP Okhla.
Renovation/ Strengthening of header line and sluice valves installed at Raw Sludge pump house at 16 MGD STP Okhla.
Supply of 30 MGD treated effluent to Garhi Mandu forest from 1500mm dia twin effluent from Yamuna Vihar STP
SITC of 04 MGD Sewage Pump House for supply of treated effluent from Ghitorni STP to Aya Nagar Forest
Supply and sprinkling of STP water through mechanical water sprinkler tankers in the area from NH24 to DND Flyway.
Deployment of contractual staff for round the clock and smooth operation of treated effluent filling point at Okhla STP.
Renovation/ strengthening of rack clarifier and Detroiter with other allied works at 12 MGD STP Okhla (Machine No. 2)
Repairing of Morris make 2 Ton EOT crane installed at RS Pump House of Vasant Kunj 2.2 MGD STP
Re-Construction and repair of damaged road around the sludge drying beds of 16 MGD plant at Okhla STP.
Fabrication /Making and Fixing of wire mesh for Safety Purpose of out let channel at 45 MGD STP Okhla.
Renovation/ strengthening of Mechanical bar screen with allied works installed at Molar Band STP under division EE (SDW)-II.
Engagement of un-skilled workers for cleaning of bar screens at 12, 37, 45 , and 16 MGD Okhla STP.
Deployment of contractual staff for round the clock AND smooth operation of treated effluent filling point at Okhla STP.