Loading…
Loading…
3,489 results • Best match
Replacement of old bush type coupling of 20MGD and 33MGD pump set installed at Sector-9 SPS
Deployment of staff for operation and Minor maintenance of EnM equipment at Shalimar Bagh SPS
Making interconnection between 900mm and 300mm dia mains at EPS Rithala Re-invite
SITC of 5 HP Sewage Submersible pumps for dewatering at Bharat Nagar SPS.
Renovation of base foundation of pump set no.2 and set no. 5 at sec. 23 Rohini
Removing of blockage of 500 M M delivery line of set no 5 at Kalyanpuri SPS
SITC of CCTV System at various SPS under EE SDW IX
Repairing of leakage in 700mm dismantle joint of 20MGD pump set no.2 installed at Sector-9 SPS.
Repairing Overhauling of Sluice Valves and NRVs at SPS Rohini Sector 25
Repair Renovation of MS structure and other allied works at kalyanpuri SPS
Repairing Renovation of bar screens installed at Rampura SPS Re-invite
Improvement renovation of the Electrification System at Kondli Gharoli SPS
Repairing of 3 Nos 800 AMP L T make installed at Avantika SPS.Re Invited
Renovation of Foundation for pump set no. 1 and 4 at Haiderpuri SPS Re-invite
Repairing Replacement of defective air valves installed at Header Main line in Distribution chamber and allied works at Rohini Sector- 17 SPS Re-invite
Replacement of 800A LT panel ACB AH-8D-CS series of pump set no. 3 make CandS installed at Sector-17 SPS Re-invite
Procurement of spares for 60 HP Advance make ATSs installed at Nangloi SPS.
Replacement of defective dewatering pumpset and allied works at Sector 19 Rohini
Repairing of both Bar Screen and allied works at Haiderpuri SPS.
Repairing of 315 HP AEI Make slipring motor S-2 lying at Haiderpuri SPS.
Strengthening of pump set foundation of pump set No. 1 and 4 installed at Nangloi SPS.
Lowering and Lifting of submersible pumps in wet sumps of various SPS under the division EE SDW IX
Repair Renovation of CandS Make LT panel installed at Nangloi SPS.
Repair Renovation of Bar screen installed at Nangloi SPS Re-invite
Deployment of staff for operation and Minor maintenance of Eand M equipment at Shalimar Bagh SPS. Re Invited
SITC of Radar type water level indicator at Sector -17 SPS.
Hiring of Acoustic Diesel Generator during monsoon season for Shalimar Bagh and Rampura SPSs.
Modification and Up-gradation in existing lifting system at Sector 25 SPS Rohini Re-invite
SITC of LRS for set no. 1,3 and 5 at Sec 23 SPS Rohini.
Procurement of Various consumable maintenance items under the division EE SDW IX.
Renovation of foundation for pump set No.3,4 and 5 at Rohini Sector 19 SPS.
Repair Renovation of Reva make Bar screen No.1,2 and 3 installed at Sector 19 SPS Rohini.
Removal of floating material and silt accumulated in wet sumps of Bharat Nagar SPS
Replacement of 800A LT panel ACBs with associate work of set no. (2and4) make Schneider installed at Shalimar Bagh SPS Re-invite
Refilling and repair of fire extinguisher under the division EE(SDW)IX
Repairing renovation of 4.4 MGD Pump set no. 1 Beacon weir Make installed at Rohini Sector- 17 SPS Re-invite
Installation of screen arrangement at SPS Sec 23 Rohini Re-invite
Deployment of staff for operation and Minor maintenance of E M equipment at Rampura SPS..
Renovation Repair of Johnson make 2 nos. Bar screens at SPS Sector 26, Rohini
Repairrenovation of standard capacitor make APFC panels installed at Avantika SPS.
Deployment of staff for operation and Minor maintenance of E M equipment at Shalimar Bagh SPS.
Installation of bar screen and allied works at SPS Rohini Sector 25
Supply, installation of FRP Jaal on wet sump at Bharat Nagar.
Replacement of old transformer HT power cables installed at Sector-9 SPS Re-invite
Installation of 800Amp and 2000 Amp ACBs in Main LT panel at Bharat Nagar SPS and Haiderpuri SPS Re-invite
Deployment of staff for operation and Minor maintenance of E M equipment at Nangloi SPS.
Deployment of staff for operation and minor maintenance of EnM equipments at Sector 19 SPS Rohini
Deployment of staff for operation and Minor maintenance of EnM equipments at Rampura SPS.
Repair of standard capacitors make APFC panel installed at Sector-19sps
Deployment of staff for operation and Minor maintenance of EnM equipments installed at Nangloi SPS