Loading…
Loading…
3,489 results • Best match
Retrofitting Repair allied work of OCB for set no 02 for 33MGD pump set and set no.02 and 03 of 20MGD pump set make GEC 6.6KV, HT panel installed at Sector 9 SPS Rithala.
Procurement of 7.5 HP and 5 HP dewatering submersible pumps under EE SDW IX
Repair of Standard capacitors make APFC Panel installed at Bharat Nagar SPS (Re-Invited).
Deployment of staff for operation and Minor maintenance of EandM equipments at Raja Vihar SPS
Deployment of staff for operation Minor maintenance of E M equipment at Sector 17 SPS.
Repair of Standard capacitors make APFC panels installed at Avantika SPS.
Improvement of Old dewatering system at Kondli Gharoli SPS and Dallupura SPS
Renovation by Earthing system of electrical equipment installed in the SPSs under EE SDWIX
Improvement of internal lighting system at Sector 23 Rohini SPS
Deployment of staff for operation and Minor maintenance of EnM equipments at Rithala SPS
Repairing of both 315 HP Motor No.6 and 245 HP Motor No.4 slip ring motors lying at Haiderpuri SPS.
Renovation and Repair of oriental make 2 nos penstock gates installed in both inlet channels at SPS Sector -26 Rohini .
SITC of Non return valve 800 mm dia for 33MGD pump set no.03 installed sector 9 SPS.
Renovation of Standard Capacitors make APFC panel installed at Sector-9 SPS Re-invite
Deployment of staff for operation and Minor maintenance of EnM equipments installed at Sector 17 SPS
Renovation of internal lighting system at Haiderpuri SPS
SITC of CandS make 2000Amp LT panel ACB at Bharat Nagar SPS
SITC of 45KW Kirloskar make motor of pump set no.4 at Nangloi SPS. RE-Invited
Deployment of staff for operation and Minor maintenance of EnM equipments at Nangloi SPS
Replacement of 1100mm dia rising main emanating from Bharat Nagar SPS near on the footpath with the boundary wall of college.
Repairing of Bar Screen and allied works at Bharat Nagar SPS Re-invite
Replacement of defective dewatering system installed at Haiderpuri SPS Re-invite
Replacement of MS reducer pipe of pump set no.3 installed at Rohini Sector-17 SPS
Deployment of staff for operation and Minor maintenance of EnM equipments installed at Sec 19 Rohini SPS
Deployment of staff for operation and Minor maintenance of EnM equipments at Barwala SPS.
Renovation of delivery system by opening of chocking of the delivery line at set no.1,4 and7 at Bharat Nagar SPS
SITC of digital water level indicator at site Sector 35 SPS Rohini.
Retrofitting Repair and allied work of OCB of set no 01 and 03 of 33MGD pump set and set no.1 of 20MGD make GEC 6.6KV HT panel installed at Sector 9 SPS Rithala
Renovation of Standard Capacitors make APFC panel installed at Sector 19 SPS Rohini
Deployment of staff for operation and Minor maintenance of EnM equipments at Rampura SPS
Renovation of Old UGR system and allied works in booster pumping house at Staff qtr Rithala
Renovation repair of foundation of 33MGD pump set no.1 at Rithala SPS.
Strengthening of supports, ladders and platforms for sluice valves at SPS Sector 25 Rohini Re-invite
Renovation of 4 Nos. 800Amp L and T make ACB installed in LT Panel at Bharat Nagar SPS.
Supply and installation of various sign boards at SPS Sector-26 Rohini
SITC of Internal Lighting system of new constructed staff rooms at Avantika SPS under the division EE SDWIX.
Replacement of 700MM NRV for Pumpset No.6 at Haiderpuri SPS
Deployment of staff for operation and Minor maintenance of EnM equipments at Shalimar Bagh SPS
Deployment of staff for operation and Minor maintenance of E M equipment at Rohini Sector -19 SPS.
Renovation repair of high mast light pole no.1 2 installed at Sector 9 SPS.
Purchasing of sewage submersible pump for Rampura SPS
Replacement of 1600A LT panel ACB with associate work of make L and T installed at Shalimar Bagh SPS.
Renovation of External Lighting system installed at Bharat Nagar SPS Re-invite
Repair of 3.3KV 300KW 978rpm BHEL make motor of set no.3 installed at Rohini Sector 23 SPS
Renovation repair of sluice valve of set no. 3 and set no. 6 installed at Sector 23 Rohini
P/L of New D.I. Line and M/O HDPE pipeline for STP treated water from DJB STP(B-4 Vasant Kunj) to Vasant Udhyan park Vasant Vihar, sec A pkt. B and C, Smriti Van, Pkt. B-5 and 6 and cactus garden at Vasant Kunj
Repair / Renovation of LnT make Electrical Control Panel System for PSTs and FSTs at 40 MGD STP Nilothi Phase-I
Construction of Nilothi Main road and road from Nilothi Village to Nilothi STP in Village Nilothi in Mundka AC 08.
Supply and Sprinkling of STP water through mechanical water sprinkler tankers in the area under jurisdiction of HD-8, DDA.
Restoration/Raising of boundary wall i/c providing fixing of coil fencing over wall along nala side at Mehrauli STP.