Loading…
Loading…
3,472 results • Best match
Modification of rooms into Lab at Mehrauli STP
Construction of boundary wall at Dakshin Puri STP
Construction of septage collection tank at Mehrauli STP
SH_Annual running, operation and maintenance of all the E and M services such as internal electrification work of all common area, street light, lighting and tube wells in parking area, lifts, clear water supply system, sewage treatment plant, fire f
STP CABLE LAYING (INCLUDING INSTALLATION)
Operation and Maintenance of STP
Operation and Maintenance of STP
Operation and Maintenance of STP
Stamp Pad - Faber Castell STP
STP 0.75 HP 125 INCH, STP 1.5 HP 125 INCH, STP 1.5 HP 150 INCH Bidder Turnover (Last 3 Years) 759 Lakh (s) Experience Criteria 3 Year (s)
Removal of floating material on daily basis from Mehrauli STP
Disposal of desilted earth/ malba/garbage/house waste from Escape Drain No.1 between RD 400m to RD 980m (Right Side) to EDMC dumping ground at Village Singhola (Khampur/Tikri) near DJB sewage treatment plant on NH-1 near Singhu Border site.
Disposal of desilted earth malba garbagehouse waste from Escape Drain No.1 between RD 0m to RD 352m (Right Side) to EDMC dumping ground at Village Singhola (Khampur/ Tikri) near DJB sewage treatment plant on NH-1 near Singhu Border of silt site
Renovation Repairing Geo Miller make PST No 1 at Narela STP
Improvement of sludge drying beds at Ghitorni STP(Re-invite)-1
Supplying and Replacement of STP cable from substation to STP room Panel at Dilli Haat INA, Delhi
NIT No. 2(2026-27)/EE(C)Dr-III
NA Cat-6 STP for CCTV
IHT Cat-6 STP for CCTV
NA Cat-6 STP for CCTV
Desilting of channels towards 30 MGD STP and 16 MGD STP at Okhla
N.I.T. No. 01(2025-26) EE(C)DR-VI
SITC of new Tubewells along with all EandM equipment at inside konsli stp.
Construction, strengthening and raising of boundary wall at various locations at Pappankalan STP
Disposal of desilted earth/ malba/garbage/house waste from Escape Drain No.1 between RD 0m to RD 980m (Right Side) to EDMC dumping ground at Village Singhola (Khampur/Tikri) near DJB sewage treatment plant on NH-1 near Singhu Border of silt site
Provision of OH Conveyor and STP Automation at IOCL LPG Bottling Plant Gurgaon and Karnal
Portable Fire Extinguishers (V2) ISI Marked to IS 15683 (Q2), Co2 Based Wheeled Fire Extinguishers (V2) ISI Marked to IS 16018 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6707256 Dated : 23-09-2025 Bid Document 1/13, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Co2 Based Wheeled Fire Extinguishers (V2) ISI Marked to IS 16018 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Repair/Renovation of Mechanical Bar Screen No 1 and 2 installed at Narela STP
Providing 10 MGD treated effluent from Rithala STP to the lake proposed at Rohini STP by Providing Laying 800mm dia. M.S. pipe and allied works.
Operation and Maintenance of 30 KLD STP Plant at Dwarka/L-9, 10 KLD STP Plant at Nangli, 10 KLD STP Plant at Dhansa Bus stand, 10 KLD STP Plant and 10 KLD ETP Plant at Najafgarh Depot of line-9 for 3 years period.
NETWORK CABLES Cat-6 STP for CCTV
Operation and Comprehensive maintenance of STP of
Construction of damaged boundary wall at Ghitorni STP under EE(Civil) Plant SDW S/E.
Repair and maintenance of damaged slabs of ducts from Modi Mill to Okhla STP main gate
Repair/replacement of components and operation and maintenance of existing 30 cum/hr WTP, 220 KLD STP and 50 KLD STP at Shastri park Staff Quarters and 80 KLD STP and 50 KLD WTP at Transit Accommodation Hostel and 100 KLD STP at DMRA Boys Hostel.
NIT No.03(2026-27)/EE(C)DR-XII
Creation of Lake at Najafgarh STP under E.E. (WB)-I