Loading…
Loading…
2,217 results • Best match
Repair and mtc of foundation / water body, providing and fixing of mosaic tile and cement concrete at STP, Sector 28, Panchkula Extension complete in all respect and all other works contingent thereto (A/mtc of STP Sector 28, Panchkula Extension)
Const of 5 MLD STP at Narnaul Dewatering by jetting machine with tractor diesel and driver and construction of new manhole near Plot No 1740 Part I Sec 1 Narnaul and clearing jungle vegetation and levellilng of earth at STP Narnaul
Annual maintenance Sewerage Scheme Rewari Town operation and maintenance of 2 No. STPs/ MPS 16.00 MLD STP based on SBR Technology and 8.00 MLD STP based on MBBR Technology (Attached Growth Process) complete with addition of nitrification and De-nitri
Amtc. of 7.5 MLD STP Village Vaidwala Road, Sirsa. Providing and installation of CCTV camera with all accessories at 7.5 MLD STP Village Vaidwala Road, Sirsa, complete in all respect and all other works contingent thereto including one year mtc. and
Providing, laying, jointing and commissioning of rising main 600mm dia. from IPS Panchayat Bhawan to existing master sewer line of mirzapur STP and from IPS Sector-9 to existing master sewer line of mirzapur STP complete in all respect including Re
SPECIAL REPAIR TO STP AT AFS RAJPURA, BAKNAUR AND KALPI UNDER GE (AF) AMBALA
Repairing and rewinding of 75 HP non clog sewerage submersible motor complete with material and labor charges at 15 MLD STP Zone-III, Hisar and all other works contingent thereto
Repairing and rewinding of 40 HP Non clog sewerage submersible motor complete with material and labor charges at 15 MLD STP Zone-III, Hisar and all other works contingent thereto
Providing and fixing of new non clog submersible sewage motor pump 15BHP and NRV at Sector7 STP Ambala complete in all respect and all other works contingent
Repairing of leakage of HDPE STP water pipe line and hydrants connection under the area of Horticulture Zone
Providing and laying of NP2/NP3 Pipes for drainage water from Agwanpur fatak to STP IN MC Ganaur
Strengthening of Main YAP Sewer Line from Chautala road to Siwah STP by MWSL Technology under MC Panipat
Restoration and rejuvenation of Palra village pond Near Micro STP Ward no 17 under Zone I, MCG. Recall
construction of IPB Street from STP Pump to Khairpur Police chocki wali gali, Ward no-4, MC Sirsa
Providing and fixing of Super Gas Feeder for Chlorine System at 18 MLD STP in Sector 20 Panchkula
PF of Tank Covers at STP and TTP in Sec 20 Panchkula and all other works contingent thereto
Treated water from STP Naharpur Kasan to village Khoh Phadi in ward No.13 under MC Manesar- Retender
Annual Running Operation and Maintenance Contract of 660 KLD STP Plant 01 No at GC CRPF Sonipat Haryana
Raising of walls of existing drain from 8 MLD STP (Shiv Colony) to Barota Drain, under M.C. Karnal.
Hiring of JCB Tractor with Trolley for STP Land Levellling work in Khandsa village ward no. 24, Gurugram.
Installation of New dry Submersible Motor Pump in STP Sec 20 Panchkula and all other works contingent thereto
Special repair and up gradation of 0.25 MLD Capacity STP based on FAB Technology in NGM at Pipli
Construction of 2 nos RCC tank near DLF Society for STP in village in Zone 6 Under MCM
Providing and laying of 1800mm master sewer line along Agra Canal from Khedi Pul to STP Mirzapur (Recall)
Annual Running Operation and Maintenance Contract of 660 KLD STP Plant 01 No at GC CRPF Sonepat Haryana
Providing and laying of interlocking tile on approach road of STP Mohammadpur in ward 17 under MC Gurugram.
E Tender for Operation and Maintenance of Sewerage treatment plant STP at Kalpana Chawla Government Medical College Karnal
Estimate for Filling of soil at 12 MLD STP site at Khudda Khurd in MC Ambala Sadar. Recall
Providing and laying of 1200mm RCC NP3 from existing IPS to STP in village Naharpur Kasan, zone-4 under Municipal Corporation Manesar
Operation and maintenance of 10 MLD STP and 20 MLD MPS based on SBR technology and repair of all other machinery installed structure constructed including electric connection, hotline, VCB Geo switch, HT metering panel with watch and ward 24 hours a
Operation and maintenance of 10 MLD STP and 20 MLD MPS based on SBR technology and repair of all other machinery installed structure constructed including electric connection, hotline, VCB, Geo switch, HT metering panel with watch and ward 24 hours a
Supply of earth and Clearing of jungle, uprooting of rank vegetation, grass, shifting of malba etc. from STP in Sector-25, U/E, Rohtak and all other works contingent thereto
Repairing and rewinding of 40 HP Non clog submersible motor including dismantling, opening and refitting complete with material and labor charges at 15 MLD STP Zone-III Village Dabra, Hisar
SOP Upgradation of exist. 3 MLD STP, laying of 450 mm id HDPE pipe rising main from STP to drain8 and balance sewer lines, Replacement of damaged sewer lines in Harphool singh colony, Salhawas road near fly over, Sainik Colony , Bhardwaj colony
Operation and Maintenance of 2 No. STPs/ MPS 16.00 MLD STP (based on SBR technology) and 8.00 MLD STP based on MBBR Technology (attached growth process) complete with addition of nitrification and de-nitrification) at Nasia Ji Road at Rewari Town (fo
A mtc. of 10 MLD STP Majra Road, Fatehabad. Providing and installation of CCTV camera with all accessories at 10 MLD STP Majra Road, Fatehabad, complete in all respect and all other works contingent thereto including one year mtc. and defect liabilit
SPL REPAIR OF RDS FROM STP LIFT WELL NO 4 JN TO BAFFLE RANGE AND RD LEADING TO STP FROM JADUNATH VIHAR RD NEAR OF BANSI PARK AND SPL REPAIR / WIDENING OF RD IN SECTOR D AT HISAR MIL STN UNDER GE HISAR
Operation and maintenance of 10 MLD STP and 20 MLD MPS based on SBR technology at Gohana Road, Jind and all other works contingent thereto. For a period of 1.9.2020 to 31.3.2021 7 months
Mtc of grassy lawn, hedge, plants at STP and all other works contingent thereto
Construction of RCC Open Channel of size 1 50 X 1 50 Mtr at STP Dhanwapur Gurugram with Design mix M30 grade complete in all respect and all other works contingent thereto including defect liability period of 12 months.
Special repair installation of 30 KLD STP cum ETP at ESIC Hospital, Bhiwani, Haryana (Civil Plus Electrical) Subwork/Packages: Construction Work
Construction of 1 pump chamber, 1 collecting tank at STP, Laying of 10550 m long HDPE pipe rising main from STP to Krishnawati River. Supply, erection, testing and commissioning of 5 non clog sewage Horizontal centrifugal split casing pumping sets an
O and M of 4.5 MLD capacity MPS at STP Taoru i.e. O and M sewage submersible pump, mtc. of inlet/ screen chamber/ colleting tank etc. and rising main upto inlet of STP and all other works contingent thereto for one year
Laying of Sewerage Line for disposal of Rampura Village Sewerage to Lakhdola STP Under MC Manesar Limit. Recall I
1181 - Providing and Fixing of Pannel Board, change over and other allied works at STP Rathdhana under MC Sonipat.
DNIT for Operation and Maintenance of 120 MLD capacity STP, MPS based on sequential batch reactor at Behrampur Gurugram
Construction of Street H/o Pardeep Dhull near STP, ward no 31 MC Jind.(Only for L/C Societies)
Operation and maintenance of anaerobic 30 KLD STP at Chakkarpur Village, Sec.-44, Sec-31, DC Residence MCG Gurugram
PREVENTIVE MAINTENANCE OF STP INSTALLATION AT BOH IN SECTOR B INCLUDING ALL CONNECTED ITEMS UNDER GE UTILITY AMBALA CANTT
Laying of STP water lines for watering in South city-II parks under Ward 15 Municipal Corporation, Gurugram Recall