Loading…
Loading…
1,752 results • Best match
The work of Insulation of STP and repairing of jarjar STP due to Kanvar Yatra in area of EDD-Garh
Replacement of Damaged STP and PCC Pole
Replacement of Damage STP and PCC Pole
Refabrication/ Resupply/ Rehabilitation/ Existing of MS Coarse screen and MS platform work of inlet Painting work of substation Chlorination system and Repair and servicing of DG set Replacement of Aerator Gear at 80 MLD STP Dinapur Varanasi
Operation, watch and ward of 1No 3.75 MLD STP, 1 No Sewage pumping station and 5 Nos Tube wells pumping plant along with all connected electrical and mechanical equipment at HAL water supply and sewage scheme Lucknow
Survey, Soil Investigation, Design, Construction, Testing and Commissioning of 50 KLD Feacal Sludge Co Treatment Plant at Existing 16 MLD Jhunsi STP Campus District Prayagraj including all Civil and EM Works required for Successful completion of wo
Annual Operation/Comprehensive Annual Maintenance or both for various services like fire fighting, EI installation, Lifts, UPS, HVAC/VRF system, DG Sets, Water Supply Services, ETP cum STP Services, CCTV etc. alongwith all kinds of Civil Maintenance
REPAIR AND MAINT OF STP PLANTS AND DG SETS AT SANJOG CHHETRI VIHAR, NIRBHAY VIHAR, GAUR ENCLAVE, HAVELOCK LINE AND RAJEEV SANDHU VIHAR IN THE AREA OF AGE E/M EXT (WS) UNDER GE E/M LUCKNOW
SITC of Dewatering Pump, Invertor with Battery, Cleaning of outlet chamber for Primary Clarifier No. 2, Laying of new PVC pipe line from rotameter outlet to CCT Tank and other work at 80 MLD Dinapur STP, Varanasi.
Electrical work for Carrying out leftover Miscellaneous work Between STP-SPC , BVN-BUW, Doubling project in the section of SSE/STP, BVN over LJN - Div, Segregation of 30% & 70 % light on platforms at different Railway station over LJN- DIV, Provision of electric power depot office at BUW station, Improvement of passenger amenities as per need of passenger at Shidauli & Aataria and provision of stabling lines at MBP, Facade worke of station building and other associated miscellaneous works in circulating area at LMP station .
Electrical work for Carrying out leftover Miscellaneous work Between STP-SPC , BVN-BUW, Doubling project in the section of SSE/STP, BVN over LJN - Div, Segregation of 30% & 70 % light on platforms at different Railway station over LJN- DIV, Provision of electric power depot office at BUW station, Improvement of passenger amenities as per need of passenger at Shidauli & Aataria and provision of stabling lines at MBP, Facade worke of station building and other associated miscellaneous works in circulating area at LMP station .
Carrying out various works for shielding and covering of A type, B type, C type Panels, STP and RS Joist Poles at different places in the area of EUDD II, Mathura under the jurisdiction of SE, EUDC, Mathura
Carrying out various works for shielding and covering of A type, B type, C type Panels and STP, RS Joist Poles at different places in the area of EUDD III, Mathura under the jurisdiction of SE, EUDC, Mathura
Rusted AND Broken STP pole, Joist poles and make them straight by welding the iron angle and making pole plinth with the help of cement, coarse sand and stone gritt in the area of EDSD-I (Town), Hardoi.
For Supply and errection of Silicon Insulation tape on various STP located at crowdy area of the city to avoid leakge and shock in different areas under UEDC-I Varanasi System Augmentation /System strengthening work Plan 2023-24
Annual Maintenance Contract of 15 Nos of Johnson Make Lift installed on FOB (G+1) at GKP (6 Nos), GD (02 No) , LJN (03 Nos), ASH (02 Nos) & STP (02 Nos) Railway stations through OEM for 05 Years.
SPECIAL REPAIR / REPLACEMENT OF STP AT BI LINE 350 KLD ALLIED WORKS ELECTRIC WIRING OF BLDG NO. BI14 BI15 OF 641 SATA BTY AND PROVN OF 8 X AC 1.5 TON CAPACITY WITH STABILIZER AT NEW CANTT PRAYAGRAJ
Running and Operation of EandM Equipments with all labours, TandP required to achieve design parameters of following assets at Jajmau, Kanpur.a) 30 MLD STP and Substation Jajmau, Kanpur. b) 135 MLD Combined Sewage Pumping Station (CSPS), Jajmau, Kan
(TG4) Ward no 15 or 24 ke chakiya me atik ke ghar se rashid ke ghar v anya 2 galiyon me jal nikasi hetu STP me ja rahe nale tak RCC nali nirman v marammat screen jaal karya
M/o UGR STP (Cleaning and removal of existing Desalting/Debris/Silt rubbish/Bio mass/Grit and Sediment Material from Open inlet Chamber/Well/Screening Chamber by Super Sucker Machine/Mechanical Cleaning Machine/Chemical (NAME REFER TO NIT)
Carrying out various works for shielding and covering of A type, B type, C type Panels and STP, RS Joist Poles at different places in the area of EUDD II, Mathura under the jurisdiction of SE, EUDC, Mathura
Repair and restoration renovation of ailing EM equipment procured for running and operation of MPS 68 MLD and MBBR STP 30 MLD along with additional provision of EM equipment for De nitrification nitrification and allied civil works desperate
In the Khoda-Makanpur municipal area, Ward No. 13 (Pawan Vihar) Improvement works for CC roads and drains from Shri Krishna Electric Shop to Prem Singh house, and from Shanti Niwas to the road leading to the STP.
Survey Investigation and designing Hydrographic Hydraulic Structural etc of Construction of Drain From Lakshmi Gate to STP Plant to Sudha Vihar Colony Gate no 2 to Highway in Jhansi including supply of all material labour Tand P etc
Construction of RCC road, STP, UG tank and Boundary wall with concertina coil fencing with 02 nos, gate and other development works of 4th Bn SSB Mohanlalganj. SH:- Providing services for Computer operator, Driver and Peon/Dak Runner.
Tender for Transportation of Goods in Sitapur BA
Construction of 62.5 KL capacity underground reservoir (UGR) for re-use of treated water by 38 MLD STP and fitting of 02 nos. 5.0 HP capacity sewage pumps, construction of treated water filling station, pipe fitting, fire hydrant fitti
Works of Replace old and Jar-Jar Wire (Weasal Conductor and STP Pole) at 11 kv Industrial feeder Under 33/11 Kv Sub- Station Bachraun in the Area of EDD-Gajraula under Under Business Plan 2024-25 (Part-II).
Carrying out various works for shielding and covering of A type, B type, C type Panels and STP, RS Joist Poles at Parikrama Marg, Vrindavan in the area of EUDD II, Mathura under the jurisdiction of SE, EUDC, Mathura
M/o UGR STP (Cleaning and removal of existing Disalting/Debris/Silt Rubbish/Bio mass/Grit and Sediment Material from Open /Covered UGR including Cleaning of all wall/floor Ceiling by Super Sucker Machine/ Mechanical Cleaning Machine/Chemical cleaner
Construction of hanging 11 KV cable line and metering system for giving supply connection (113 KVA load) to STP and M.P.S. Basna nala from 33/11 KV New Phaphamau sub-station under the Jurisdiction of EUDD- TAGORE TOWN, Prayagraj.
Operation and Maintenance based) of Ash Handling System (Wet an Dry mode) and Operation and Maintenance of AWRS, Clariflocculator System and operation of dewatering Pump of STP of 2x210 MW unit 3,4 at Parichha PTPP, Jhansi.(For two years)
RO of Primary Trilcling filter secondary clarifier RS and Raw sludge PH SV SM and 500 KVA DFG DG TEPH Filtrate pump house PGR Digester and Gas holder 24x7 and Treatment of CPCB UPPCB of 80 MLD Dinapur STP
Signalling Works in Connection with Improvement of various Station Yards under ADEN/BRK, ADEN/East/GD, ADEN/Line/LJN, ADEN/MLN, ADEN/W/GKP, ADEN/SPL/GD, ADEN/STP & SrDEN/HQ/LJN section of LJN Division of N.E. Railway.
AORM Electrical sub station over head line HT LT repair maintenance of Submersible Pump STP pump set procurements of stores for day to day maintenance at SSB FCIL Complex Gorakhpur SH AORM of Electrical sub station over head line
(TG3) Gange colony Bus stand ke piche Halbai ki dukan se transformer tak or sant kumar SDO ke ghar se pundir ke makan ki taraf STP me ja rahe nale me jal nikasi hetu nali nirman or marammat karya
Repair to drain, boundary wall, steel gate, garbage bin and cleaning of sewage line including repair to toilet and other misc. B/R repair of pump house installation and STP at Zone D old cantt and Fort cantt Allahabad.
Survey Investigation Design Build Operate and Transfer of Interception Diversion and Treatment Works including 02 Nos Drain Tapping Interceptor Trunk Sewer 01 No MPS 6 MLD with allied works and Rising Mains 01 No STP 5 MLD facility for
Construction of Girls Hostel G6 including Internal EI and fans fire alarm system fire fighting system lift PV system etc STP and Development work at RGIPT Jais Amethi. SH- Providing services of Drivers for office of ADG Region Lucknow
Comprehensive Annual Maintenance of SCADA for ASH-MLN, BBK-GB & BUW-STP system as per RDSO Specification No.TI/SPC/RCC/SCADA/0130 (Rev-02) with all latest amendments /revision for Lucknow Division of N. E. Railway for 02 years.
Development of Goods infrastructures as per handling of commodity at Khairabad Awadh station and Provision/Improvement of passenger amenities as per need of passengers at Sidhauli and Ataria stations in the jurisdiction of ADEN/STP, Lucknow division, NE Railway.
Replacement of damaged STP/PCC Poles, Tightening of loose conductor, repairing of break conductor and making straight way of tilted poles due to heavy rain in the area of sub-divisional officer HAL, Indira Nagar, LESA Trans Gomti Lucknow
Under National Clean Air Programme (NCAP) Construction work of linepar park, plantation and walking track from STP gate to Safai Godown for Greening of traffic corridor along NH-24 (Rampur Road) with comprehensive operation and maintenance of 5 years
REPAIR/ MAINT IMPROVEMENT OF WATER SUPPLY RISING MAIN AND DISTRIBUTION SYSTEM WITH CONNECTED WORKS AT SWIMMING POOL KLP, SAF,FASF AREA AND COMPREHENSIVE MAINT OF SEWAGE INSTALLATION AND MBBR BASED STP OF CAPACITY 300KLD AT MAP PH-II UNDER GE BABINA
Supply of 33 KV F Clamp, 11 KV F Clamp, Top-Dropper Channel Clamp etc. suitable for 11.0 Mtr. Long STP for shifting work of 33 kV, 11 kV/LT Lines in Naraini-Kalinger National Highway Marg under EDD, Banda
EE EDD-Ist, Chandauli under Electricity Distribution Sub-Division-Ist, installation of PCC poles between STP poles, DTR poles, HT poles at the following places, by installing ABC conductors, to make the line running smoothly and to the old poles.
Supply/ SITC/Services/ Item of Works, on urgent basis for the ANNUAL REPAIR MAINTENANCE WORKS (SERVICES) of PACKAGE-I PACKAGE-III) of ESIC, R. O. Mumbai - CAMC for STP ETP at Hospital Vashi, Hospital Kandivali CAMC of RO at Hospital Kandivali
Construction of hanging 11 KV cable line and metering system for giving supply connection (385 KVA load) to STP and M.P.S. near Gyansthali School from 33/11 KV New Phaphamau sub-station under the Jurisdiction of EUDD- TAGORE TOWN, Prayagraj.
Supply and fitting of Flood street LED Lights, LED strips lights, LED Bulbs, MS Poles and its accessories, repairing of damaged poles, 24x7 Hour timers for High masts and painting of all MS Poles at 80 MLD Dinapur STP, Varanasi.
Ward 09 or 13 me madhopuri me sakshi tirahe or asha devi ke ghar se rakesh gupta ke makan or main nale tak jal nikasi STP me jaa rahe nale tak RCC nali or nal nirman or screen jaal karya