Loading…
Loading…
4,193 results • Best match
Carrying out O&M of 33//11 KV Sub-Stations round the clock on works contract basis as for scope of works in Operation Sub-Division Narsipatnam Town of Narsipatnam Division of VSP Circle
Carrying out Operation & Maintenance of 2 Nos 33/11 KV Sub Stations Duttaluru & Narrawada round the clock on works contract basis as per scope of work in Operation Section, Duttaluru, in Operation Division, Atmakur
Carrying out Operation & Maintenance of 2Nos 33/11 KV Sub Stations Isakapalli & Gogulapalli round the clock on works contract basis as per scope of work in Operation Section, Allur Rurals, in Operation Division, Kavali
Erection of 08 Nos 33 KV feeder bay extensions at various EHT sub-stations for bifurcation of overloaded 33 KV feeders in APSPDCL in O and M Circle Kurnool on Semi turn key basis
AME for EIE & EEI in SPWDC, SPWJC, SPWPC and its Hostels, Transformer Sub-stations, yard lights etc., and purchase of Materials of AE-II section in ESD-II, Tirupati for the year 2025-26
Carrying out O&M of 33/11 KV Sub-Stations round the clock on works contract basis as for scope of work in Operation Sub-division of Yelamanchili of Anakapalli Division of VSP Circle
AME for IEI & EEI in EO / JEOs Bungalows, SPRH, SVETA, SVDF, Transformer sub-stations, yard lights etc., and purchase of materials of AE-II Section in ESD-II, Tirupati for the year 2026-27
Supply, Erection, Testing and Commissioning of 1. 220by33KV Sub Station at Talaricheruvu for Integration of 275MW BESS and 2. Erection of 220 KV Double Ckt LILO lines from 220KV Talaricheruvu to PSS.2 DC line to Proposed 220by33KV BESS Sub Station at Talaricheruvu duly replacing the existing ACSR Moose Conductor with ACSS Moose Conductor in Ananthapuramu District on turnkey basis.
Development of transmission infrastructure required for establishment of 150MW/300MWh Battery Energy Storage System at existing 400/220KV Kalikiri Sub Station. (excluding supply and erection of PTRs)
REPAIR MAINTENACE OF DISTRIBUTION TRANSFORMER DEHYDRATION TOPPING UP OF TRANSFORMER OIL AND OTHER MISC WORKS AT CERTAIN SUBSTATIONS AT ND V
AME for maintenance of VCBs & LBS available at all the substations at Tirumala in ESD-South for the year 2019-20
OVERHAULING AND PREVENTIVE MAINTENANCE OF HT VCBs AT OLD DOCK AREA SUBSTATIONS AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) (DM) VISAKHAPATNAM
AME for maintenance of VCBs & LBS available at all the substations at Tirumala in ESD-South for the year 2019-20
Repair, Recondition, Re-wiring of Distribution Transformers at 11KV substation, VPA
Replacemnt of 160 KVA DG set at MSSR substation Yarada Visakhapatnam
Procurement of 1 No. online moisture measurement kit at Vemagiri Substation
Supply, Installation & Commissioning of Isolation Transformers at Substation PoPs in AP
Providing Transformer and Substation at S.V.Ayurveda Pharmacy at Narasingapuram near Srinivasamangapuram
Providing of 100/160MVA Power transformer plinth at 220KV Substation, Hindupur.
Erection of 2 Nos Outdoor Substations in Rudravaram and Gosangam and 1 No. Semi Indoor Substation in Vengalayapalem for external electrification works for the APTIDCO layouts in Vijayawada and Guntur Circles of APCPDCL on partial turnkey basis under Normal Plan (Supply of PTR, Station DTR,Outdoor VCBs department scope and Supply of Indoor Panels in the contractors scope)
Supply, Cleaning & Application of High Voltage Insulator Coating with RTV Silicon Rubber for 400KV Switchyard and Transformer Bushings of 2x800MW-SDSTPS
Providing of metal spreading, cable trench, breaker steps and kerb wall in the switchyard at 220KVSS, Nellore in SPSR Nellore District
Painting of switchyard structures with one coat of red oxide and one coat of aluminium paint at 220KV Switching station,Gooty
Supply of Spares for Voltas make Packaged chiller units at 400KV Switchyard AC units of Stage-IV/Dr.NTTPS (1 x 500MW)
Providing Switching and change over arrangments for running of 3Nos of 120HP Motors at newly constructed pump house under AMRUT scheme to 400KVA Transformer switch yard in Nellimarla master pump house under General fund2019-20 in Vizianagaram corportion. Est Cost :4.88 Lakhs
Works for development of ayacut/stabilization of ayacut under CBR Right canal, Subwork: Construction of Switch Yard, supply and erection of transformers for the three lift schemes Lingala, Vanambavi and Gunakanapalli Pump Houses in Lingal (V) of Lingala Mandal in YSR District
Carrying out Operation and Maintenance of 2 Nos.33/11 KV Sub Stations Pallipadu, Ramudupalem round the clock on Work Contract Basis as per scope of work in Operation Section M.V.Palem in Operation Circle Nellore
AME for IEI and EEI in SPWDC, SPWJC, SPWPC and its Hostels, Transformer sub-stations, yard lights etc., and purchase of Materials of AEE-II section in ESD-II, Tirupati for the year 2024-25
Carrying out of Operation and Maintenance of 33/11 KV Sub-stations round the clock on work contract basis as per scope of work in Operation Division Paderu (Reserved for SC/STs) Operation Circle Visakhapatnam
Engaging of 119 Nos. Shift Operators for carrying out Operation maintanance 33 Nos.33/11 KV Sub-Stations on works contract basis as per the scope of work in Operation Division Anakapalli of Visakhapatnam Circle
Carrying out O&M of 33/11 KV Sub-Stations round the clock on works contract basis as for scope of work in Operation Sub-Division of Gopalapatnam of Zone-III Division of VSP Circle
Carrying out Operation & Maintenance of 1No 33/11 KV Sub Stations Sri Purandara Puram round the clock on works contract basis as per scope of work in Operation Section, Buchi Rurals, in Operation Division, Kavali
Carrying out Operation & Maintenance of 01 No 33/11 KV Sub Stations Kotamitta round the clock on works contract basis as per scope of work in WEST-3 Operation Section in Nellore Town Operation Division
Carrying out Operation & Maintenance of 1 No 33/11 KV Sub Stations Atmakur Town round the clock on works contract basis as per scope of work in Operation Section, Atmakur Town, in Operation Division, Atmakur
Carrying out Operation & Maintenance of 2 No. 33/11 KV Sub Stations round the clock on works contract basis as per scope of work in Operation Section, Atmakur Operation Division, Kurnool of (O) Circle, Kurnool
Carryout the repairs to OLTC's of Power Transformers at various 33/11KV Sub-stations under the Supervision of MRT/Anantapuramu division for a period of one year i.e., from 01.04.2026 to 31.03.2027 in Anantapuram circle.
AME for IEI and EEI in SPWDC, SPWJC, SPWP and its Hostels, Transformer sub stations, yard lights etc and purchase of materials of AEE-II section in ESD-II, Tirupati for the year 2022-23
Carrying out Operation & Maintenance of 3Nos. 33/11 KV Sub Stations round the clock on works contract basis as per scope of work in Operation Section Balayapalli in Operation Division, Naidupet of (O) Circle, Nellore.
Carrying out Operation & Maintenance of 3Nos. 33/11 KV Sub Stations round the clock on works contract basis as per scope of work in Operation Section Pellakur in Operation Division, Naidupet of (O) Circle, Nellore.
Carrying out Operation & Maintenance of 01 nos 33/11 KV Sub Stations DRDA round the clock on works contract basis as per scope of work in Town Hall Operation Section in Nellore Town Operation Division
AME for IEI and EEI in SPWDC, SPWJC, SPWPC and its Hostels, Transformer sub-stations, yard lights etc., and purchase of Materials of AEE-II section in ESD-II, Tirupati for the year 2024-25
ERECTION OF 3Nos. 33/11KV OUTDOOR SUB-STATIONS WITH 1X5 MVA PTR & CONNECTED LINES AT KOTCHERUVU & DEVARABANDA IN DHONE MANDAL AND RAMALLAKOTA IN PATHIKONDA MANDAL OF KURNOOL DISTRICT ON SEMI-TURNKEY BASIS UNDER DDUGJY SCHEME
Selection of consultant for survey, design & planning comprehen-sive Surveillance system for more than 400 Sub-stations / Stores / up-coming Sub-stations, with centralized monitoring system at Vidyut Soudha duly entering the details in a web/mobile-based survey application with coordination by the Chief Engineers of respective Zones.
Procurement of G. I Tower Plates/Cleats for 400kV D/C Gooty-NPS D/C line at Gooty Substation
Annual maintenance of OPD Block, Service block, PET CT Building, Generator room, Sub station building, General toilets and Pump room in SVIMS for the year of 2026 27.
Providing CC Road to the Vanakayala Ramachandra Rao Nagar Main Road Balance Bit from Ele.Pole.No.10P/20W to towards Ele. Pole. Sub Station Compound Wall in 18th Division.
Carrying out Operation and Maintenance including watch and ward, housekeeping and gardening, MRT Assistance and assistance for Telecom of E.H.T Sub-stations and lines and CBD and SM Gangs for lines and sub-stations on works Contract basis pertaining to 132KV SS Kandukur, 132KV SS Kanigiri & 132KV SS Y.G Palem pertaining to O&M Circle Ongole in Vijayawada Zone for the period of three years from the date of awarding of work. RESERVED FOR SC BIDDERS
Carrying out Operation and Maintenance including watch and ward, housekeeping and gardening, MRT Assistance and assistance for Telecom of EHT Sub-stations and lines and CBD and SM Gangs for lines and sub-stations on works Contract basis pertaining to 132KV SS Kandukur, 132KV SS Kanigiri & 132KV SS Y.G Palem pertaining to O&M Circle Ongole in Vijayawada Zone for the period of three years from the date of awarding of work (RESERVED FOR SC BIDDERS
Annual Maintenance of 11 KV VCBs available in 33/11 KV & K&P Dams Substations in Tirumala for the year 2018-19.
Carrying out ooperation and mainatence for lines and Substations on work contract basis pertaining to 220KV Kakinada Division in OMC Circle Rajamahendravaram