Capital works Capacity enhancement at 33kV Substation Othukkungal Control room Extension
Revamping of the 160kVA Outdoor Substation in Technopark Phase-III Campus
220kV Substation Taliparamba-Transgrid downstream works-Site levelling and allied works
Construction of Control room building at Newly proposed 110kV Substation, Vazhoor
Construction of a compound wall near flat in substation colony Kalamassery
Construction of Compound wall with chainlink fencing at 110kV SubStation Kannampully
Construction of Front Gate and Compound wall for 33kV Substation Kumily
NLR MLTY 2025-26 PR.NO 157/26 Muthalappara Substation Road Retarring
First phase renovation of 66kV Substation,Karimanal-Equipment erection of bay1
Upgradation of 66kV kuthumunda substation to 110kV - Yard Metalling and Fencing
33kV Substation Elamkulam Construction of control room building and compound wall
Earthwork excavation PCC RCC Providing weep holes Centering and shuttering Filling available excavated earth Additional Conveyance of Earth Back filling behind abutment Additional lift of earth etc
Earth work excavation CC 1 4 8 Centering shuttering RCC work Steel reinforcement Interlocking Plastering Demolishing brick work and stone rubble masonry RR masonry Solid block masonry Painting with deluxe multi surface paint Quarry muck filling
Renewal and relocation of 11kV DP structures.
Dismantling roofing tile Wood work Concrete Brick work Laterate masonry Cement Concrete Steel Reinforcement Painting emulsion Steel work tubular section tubular purlin GI iron profile sheet Aluminium work for doors windows Ceramic glazed floor tile
Earth work in excavation Random rubble masonry Supplying and filling quarry muck Steel reinforcement for RCC work Centering and shuttering Filling using Dept earth in trenches Plastering painting
Construction of 110kv Bay and installation of an additional 12.5 MVA 110/11kV Transformer
earth work excavation cement concrete centering shuttering steel reinforcement filling quarry muck providing factory made cement concrete paver block filling available excavated earth
Boring providing and installing cast in situ single under reamed piles Earthwork excavation Filling with quarry muck PCC RCC Centering and shuttering Fixing foundation bolt Plastering Structural steel work Filling with contractors own earth Driving
Loading and transporting the dumped earth Earthwork excavation Dry rubble masonry Centering and shuttering Providing weep holes Structural steel Random rubble masonry with hard stone
Dismantling and stacking reusable materials Demolishing hollow block masonry Dismantling barbed wire Earth work excavation Dry rubble masonry Steel reinforcement RCC Laterate masonry Plastering Supply angle iron post Barbed wire fencing etc.
Capital work at 220kV Substation Shoranur Construction of 110kV GIS at 220kV Substation Shoranur Construction of 11 kV main cable trench
Construction of new compound wall around the land of proposed 33kV Substation, Varandarappilly
Construction of Canopy for E Vehicle charging station near 110kV Substation compound, Muvattupuzha
110kV Substation Muttom Construction of store room attached to the control room building.
Laying 2.7KM of 11KV 3x300sqmm XLPE UG cable from Westhill substation to Ambalapadi Junction
Providing unitized substation.
Inserting 220kV S type tower at proposed 110kv substation site Vazhoor and stringing for LILO arrangement
Providing sheet roofing for G type quarter(one twin type)and Etype quarter (Two twin type)at 110kV substation Kandassankadavu
Capital work at 110kv Substation koottanad capacity addition work with 16mva,110/33kv transformer and indoor 33kV 5 panel set
Substation General Service and Running maintenance Contract of HT panel board VCB Transformer at Super Speciality Block substation For the 2024-2025 Govt Medical College Kozhikode HT ElectricalWork
Laying 11kV UG cable from Muttathara Substation via AIR RMU to Beemapally RMU and erection of RMUs for power evacuation from 110kV Substation Muttathara under Electrical Section Poonthura
demolishing RCC, laterite wall, tile work, existing ceiling, providing new ceiling, earth work excavation, skirt wall of lean-to-shed,laterite masonry,cable trench,providing vitrified floor tiles , structural steel work , GI sheet roofing , painting
Refer tender document
Construction of foundations for yard structure and equipment, cable trench and laying earth mat
Earthwork excavation PCC RCC Centering and shuttering Structural steel work Conveying the newly casted slabs from casting yard Picking collecting and stacking Supplying and filling quarry muck Providing and laying Cement Concrete paver blocks etc
Earth work excavation RR laterate and solid block masonry Quarry muck filling RCC work TMT steel reinforcement Aluminium works Plastering Painting Tiling Interlocking Structural steel work providing fibre ceiling water supply and sanitary works etc
Installing a 5MVA, 33/11 KV Transformer station with three 11KV feeder outlet.
CONCRETING AND RE METALING OF 66KV SUBSTATION AT MRS YARD INSIDE CSL
Construction of 14knm 33kV SC line from Rajamala to Munnar substation site
Construction of Compound wall and site leveling at proposed 33kV Substation, Kadampazhipuram
Supplying, Laying, of 110kV UG Cable 1 Core 1200 sq.mm at 220kV Substation, Chalakkudy and 66kV UG Cable 1 Core 630 sq.mm at 220kV Substation, Chithirapuram.
Purchase of 11 kV RMU 630 A two way at 110 kV Substation,Edathala
Strengthening of earthmat in the existing 66 kV yard at 66 kV Substation, Edathala
Operation and Maintenance of 110 kV Substation Power Distribution System at TECHNOPARK Phase III Campus and O and M of 110 kV Digital Substation at Technocity ThiruvananthapuramSubstation at Technocity, Thiruvananthapuram
Dismantling doors and windows Plastering Painting Tiling Providing PVC and wooden doors Dismantling asbestos sheet Providing polypropylene Sheet Dept supplied structural steel work Sanitary and water supply works etc.
Earth work excavation Supplying and filling quarry muck PCC Centering and shuttering RCC Steel reinforcement Lifting loading and proper placing of precast RCC slabs Filling earth Plastering Structural steel work
Clearing jungle Demolishing brick Laterite Demolishing stone rubble masonry Earth work in surface excavation Random rubble masonry RCC Laterite masonry Plastering Centering and shuttering Structural steel work Fencing Painting Carriage of laterite a
Strutural steel work,Fabrication,industrial work,PVC pipe work,Loading and transporting of departmentaly issued material and equipments,Erection yard structure,coloumn and beam,110KV bus bar work110KV equipment erection,and allied work, etc.
Site leveling ,supplying and stacking 6mm,40mm metals,supplying tarpauline,spreading metaling as specification,lconcreting,latrite mason work,palstring,fabricating,fitting jalli,painting as per specification finishing ,etc.