Loading…
Loading…
2,762 results • Best match
Upgradation of 15.56km 66kV DC line from 220kV substation Edappon to 110kV substation Kozhencherry
Up gradation of Chittur 66kV Substation to 110kV Providing Earth mat
Repair And Maintenance which includes re plastering , painting , electrical wiring , water proofing. Bathroom tile work
Dismantling tile flooring Vitrified and ceramic tiling Demolishing CC Plastering Providing CC 1 2 4 European water closet towel rod health faucet long body tap soap dish mirror
Renovation of staff quarters including painting at 110kVsubstation Kozhencherry
Earthwork excavation PCC RCC Dry rubble masonry Random rubble masonry Centering and shuttering Laterate masonry plastering Fencing with angle iron post Finishing with Deluxe Multi surface paint Steel work in built up tubular section Painting
Construction of 2 Nos Tr Bays and Installation of 110/11 kV, 20 MVA Trs, Shifting of 110/11kV,12.5MVA Tr from existing yard to new bay constructed in Transgrid 2.0,Phase-I, Extension of control room and up gradation of 11kV panel set to 2000A
Providing connectivity at 110kV, two phase supply to the newly proposed 110kV Traction Substation at Punalur on deposit work basis for Railways - Construction of new 110kV feeder bay at 110kV Substation Punalur and new metering bay at Traction Subs
Formation and yard filling of new 110 kV Substation Mannuthy
Erection of 110kV Yard equipments, columns and beams at 110kV Yard of Kadampuzha substation
PARIYARAM SUBSTATION TO PULLUMALA AB UG 6 KM 19-20 Under Electrical Section, Karimannoor
Interlock flooring civil works etc
Please refer tender documents
Capital Work of 66kV Substation, Peermade - Replacement of 66 kV oil circuit breaker and realignment of 10 MVA,66/11 kV Transformer No 1, Providing CB control for 66 kV Vandiperiyar feeder and Providing 66 kV LA for 66 kV Mundakayam feeder
Drawing 1.5 km 66kV covered conductor from Sasthamcotta substation to Loc.7 of 1 STKP feeder
Earth work excavation Supplying and filling quarry muck PCC 1 3 6 RCC Centering Shuttering works Steel reinforcement Filling available excavated earth
Surface dressing Supplying stacking and spreading of 6mm 40mm broken stone Plastering Supplying and laying tarpaulin sheet Centering and shuttering PCC Supplying and fixing square steel pipes solid block masonry Earthwork excavation RCC
Surface dressing Supplying and stacking 6mm metal Supplying and stacking 40mm metal Spreading 6mm broken stone Supplying and laying tarpaulin sheet Plastering PCC Earth work in excavation Filling with departmental earth Demolishing cement concret
Construction of Mac road and maintenance of approach road.
Dismantling doors and windows Dismantling tile works Ceramic wall and floor tiling Aluminium work for doors and windows Plastering Painting Demolishing brick work and cement concrete Vitrified tile flooring wood work for doors Sanitary fittings etc
Earth work excavation Driving down teak wood piles Filling quarry muck PCC RCC Steel reinforcement Centering Shuttering FPS Brick work Plastering Open timbering including strutting shoring Painting Filling dept earth Demolishing cement concrete
Earth work in excavation Providing and laying in position cement concrete Centering and shuttering Steel reinforcement for R.C.C work Filling available excavated earth Conveying the newly casted slabs from casting yard etc
UG CABLE LAYING AFTER CONSTRUCTING CONCRETE CABLE TRENCH AT SUBSTATION TO SIVA AB FOR NEW 11KV ARAKKILADU FEEDER
Site levelling, Equipment foundation and Cable trench work at 110kV substation Parassala for erection new 12.5 MVA Transformer
Purchase of 11KV RMU in favour of M/s Falcon Mall under work deposit at 33KV Substation, Kongannur
Remetalling of Upper Switch Yard with construction of toe wall and allied works of 220kV Switch Yard at Lower Periyar Powerhouse, Karimanal, Idukki Dt
Capital work of LMS, Edappon- Replacing old porcelain disc insulator with new composite polymer insulators in tension towers of Edappon- Mavelikara (1EPMV) feeder from Edappon Substation to Loc 42
4 0 2 / 2 6 - T H R I S S U R CORPORATION 2025-26 AYYANTHOLE ZONAL OFFICE DIVISION 47 KUNJITHOPPU ROAD SREE NARAYANA SUB STATIONs S R NAGARCHURCH KAYMANACHAL ROAD REATRRING WORKS
Design verification, detail engineering, manufacture, supply, installation, testing and commissioning of 750 V DC third rail traction system electrification and Auxiliary Sub Stations (ASS) and Associated Scada Systems for Phase 2 of KMRL Project.
Construction of Internal Road at 110kV Substation, Thiruvaly, With Interlock CC Tiles and Cement Concrete
Dismantling of existing 110 kV Pneumatic type Circuit Breakers and Erection of new 110 kV Circuit Breakers on 1PPMC-1, 1PPMC-2 Feeder Bays and 110/11 kV 20MVA Transformer-1 and 2 bays at 110 kV Substation, Medical College.
Construction of Bridge over Chirammal thodu near KSEB Substation at Paalotvayal
Capital work Construction of stack yard at 220 kV Substation, Palakkad.
Upgradation of 66 KV Substation Koothumunda to 110 kV- Providing Earthmat
New cable from substation to Incubation centre in the university campus
Providing chain link fencing for the compound of 66kV Substation Nedumkandam
Concreting and Remetaling of 66kV Substation at MRS Yard inside CSL
Supply Erection Installation testing and commissioning of 800 kVA unitized Substation
Pr. No.274/24, Moochikkalchola Substation road retarring in ward 4
LAYING UG CABLE FROM SUBSTATION TO VINAYAKAR JUNCTION UNDER ES, PARAVUR
REROUTING OF 11kV CABLES TO U1 SUBSTATION OF FACT-CD, AMBALAMEDU.
Concreting of Panchayath road with cable trench at 110kv Substation Vazhoor
Proj 171 Improvements to 66kv substation Perekonam road in ward 15
Construction of Compound wall and allied works at 33kV Substation Choolissery.
Capital work of 110kV Substation Ponnani- Electrification of new control room
Concreting and Remetaling of 66kV Substation at MRS Yard inside CSL
construction of outside cable trenches cum culvert at 110kV Substation, Ponnani
Modification and renovation of E-type quarters at 110kV Substation Edarikode
Construction of 110 kV Substation, Thiruvaly - Electrification of Control room building
RAISING COMPOUND WALL, PARTITION AND ALLIED CIVIL WORKS AT AROOR SUBSTATION